Contractor · based in Texas

Barry Williams Electric Inc: federal contracts won

UEI JKRFPNDSPCD5

Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Sep 21, 2026. Data status

Typical award won (median)

$139,068

The middle of 91 priced awards, FY2021–FY2025. Half were between $71.5k and $229k.

Typical bids faced

4

Median bids per award, reported for 91 of 91 competed awards. 11% drew only one bid.

Won as a small business

100%

Share of the 91 priced awards.

Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.

What this means

  • The middle construction & facilities award won by Barry Williams Electric Inc was $139k (FY2021-FY2025, 91 priced awards).
  • That is 2.6 times the median for all construction & facilities work nationwide ($52.8k).
  • Competed awards drew a median of 4 offers (reported for 91 of 91).
  • 11% of competed awards drew only one offer.
  • Its most frequent buyer was Franchise Acquisition Services (91 priced awards in FY2021-FY2025).
  • Tip 100% of these awards were task orders under multiple-award contracts (MATOCs). To compete for those, you first need a spot on one of the umbrella contracts.

FedComps Pro · coming soon · free waitlist

Get alerts for new electrical work near you

Includes competitor tracking: follow Barry Williams Electric Inc and the other companies you bid against.

  • Alerts that say if a bid is worth it
  • Deadline and amendment alerts
  • Recompete radar
  • Plain-English bid summaries
  • Competitor tracking
  • Unlimited saved searches

Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing

Your sign-up did not go through. Please check your email and ZIP code and try again. The spam check needs JavaScript turned on.

Add your company (optional)

We only email you about the launch. Delete your details any time.

Awards per year

Column chart of awards per fiscal year, FY2016 to FY2026. FY2025, the latest full year: 8 awards. Most in one year: 46 awards in FY2023. FY2026 is still being reported. 0 10 20 30 40 50 2016 ’16 2017 ’17 2018 ’18 2019 ’19 2020 ’20 2021 ’21 2022 ’22 46 2023 ’23 2024 ’24 8 2025 ’25 2026 ’26
  • FY2025, the latest full year: 8 awards
  • FY2026 is still being reported
Federal fiscal years run October to September.
Show the numbers
YearAwardsMedian award
FY2016 12 $32,864
FY2017 26 $29,964
FY2018 22 $7,590
FY2019 7 $67,263
FY2020 6 $94,907
FY2021 1 –
FY2022 20 $216,436
FY2023 46 $111,881
FY2024 16 $130,248
FY2025 8 $95,737
FY2026 (provisional) 15 $137,412

Award sizes

Bar chart of priced awards FY2021–FY2025 by size. The most common size was $25k to $250k (74 awards). The median award, $139,068, is in the $25k to $250k band. Under $25k 3 $25k to $250k 74 $250k to $1M 14 $1M to $5M 0 $5M to $25M 0 Over $25M 0
  • Holds the median award, $139,068
Priced awards FY2021–FY2025, by value at award.

Recent awards won

The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.

Project How it was awarded
Aug 26, 2026 Site: Watford City, ND ARSR: 24012600 _______________________________________________ "Coordination Must Be Made Within Four (4) Calendar Days After Reciept of Task Order" _______________________________________________ POC 6973GH26F01322 on USAspending (opens in a new tab) $421,557 2 Order (multiple-award IDIQ) Open to all
Aug 6, 2026 Eg Funding. Site Survey Travel, Report and Design for the 2025 Outdoor Eg Baseline for Corpus Christi, TX (CRP) ATCT: 23000618 6973GH26F01163 on USAspending (opens in a new tab) $42,396 5 Order (multiple-award IDIQ) Open to all
Jun 9, 2026 OPS Funded Demo and Install for Electrical Refurbishment Project ARSR in Grand Junction, CO, 18062203 per NDP, PMO 6973GH26F00896 on USAspending (opens in a new tab) $200,354 1 Order (multiple-award IDIQ) Open to all
Jun 9, 2026 OPS Funded ATCT - Electrical Power Replacement, in Bangor, ME, 25015948, per Es, PMO. 6973GH26F00927 on USAspending (opens in a new tab) $50,067 1 Order (multiple-award IDIQ) Open to all
May 28, 2026 IIJA Funded. Is Requested to Provide the FAA with a Checklist, Worksheet, or Diagram for the FAA Installation Team to Use in Collecting the Necessary Information to Complete a Partial and Coordination Study 6973GH26F00904 on USAspending (opens in a new tab) $7,598 2 Order (multiple-award IDIQ) Open to all
May 26, 2026 IIJA Funded This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Warrenton, VA Tracon Which Includes a Partial Power Systems Study of the Facility. 18065275 6973GH26F00872 on USAspending (opens in a new tab) $292,069 2 Order (multiple-award IDIQ) Open to all
Apr 28, 2026 IIJA Funded. Corpus Christi, TX ASR: 18066426 This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Corpus Christi, TX ASR Which Includes a Partial Power Systems Study 6973GH26F00670 on USAspending (opens in a new tab) $84,528 4 Order (multiple-award IDIQ) Open to all
Mar 25, 2026 IIJA Funds. Eg Install, Full Power System Study and Funding at Chelsea, OK: 23007870 6973GH26F00542 on USAspending (opens in a new tab) $309,390 8 Order (multiple-award IDIQ) Open to all
Jan 28, 2026 IIJA Funded. Nashwauk, MN ARSR: 19004780 This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation and Electrical, Lighting, and Service Supply Equipment Upgrade at Nashwauk, MN 6973GH26F00338 on USAspending (opens in a new tab) $299,829 2 Order (multiple-award IDIQ) Open to all
Jan 22, 2026 Eg Funded. Site Survey, Report and Design for Eg PO LED Power System Replacement Project for Birmingham, Al ASR: 236005 6973GH26F00300 on USAspending (opens in a new tab) $42,396 8 Order (multiple-award IDIQ) Open to all
Jan 21, 2026 Replace the Existing Engine Generator (Eg) 40KW Propane Eg, Install Wiring, Update the Existing Uninterrupted Power System (UPS) with 93PM-L UPS, Modify the Lightning Protection Grounding Bonding System, CO 6973GH26F00257 on USAspending (opens in a new tab) $436,297 5 Order (multiple-award IDIQ) Open to all
Jan 20, 2026 Eg Funded. Site Survey, Report and Design for Eg PO LED Power System Replacement at Montgomery, Al (MGM) ARSR: 1602905 6973GH26F00302 on USAspending (opens in a new tab) $42,396 8 Order (multiple-award IDIQ) Open to all
Jan 12, 2026 FST Funds. 2024 DC Bus Demo Baseline Scope: Site Survey Travel and Report, Design and Install Funding at Cedar Rapids, IA CID: 24016529 6973GH26F00246 on USAspending (opens in a new tab) $137,412 15 Order (multiple-award IDIQ) Open to all
Jan 6, 2026 FST 2024 DC Bus Demo Baseline Site Survey Travel & Report, Design and Install Funding at Gage, OK: 24016524 6973GH26F00237 on USAspending (opens in a new tab) $137,412 10 Order (multiple-award IDIQ) Open to all
Jan 6, 2026 FST Funded. 2024 DC Bus Demo Baseline Scope: Site Survey Travel and Report, Design and Install Funding at Lynchburg, VA: 24016521 6973GH26F00244 on USAspending (opens in a new tab) $137,412 15 Order (multiple-award IDIQ) Open to all
Sep 24, 2025 To Fund the Fuel Storage Tank (FST) Replacement at LCH ASR. 6973GH25F01432 on USAspending (opens in a new tab) $312,000 1 Order (multiple-award IDIQ) Open to all
Jul 17, 2025 IIJA Funds. Site Specific Installation Cost for Eg and FST Replacement, Installation and Full Power System Study at Oilton, TX ARSR: 23007873 6973GH25F01106 on USAspending (opens in a new tab) $779,828 6 Order (multiple-award IDIQ) Open to all
Jan 13, 2025 BIL Funds. Construction Cost of UPS and the UPS Ancillary Equipment Removal and Installation at the Little Rock, AR ATCT (AR2) per the RFQ-25-02 Bid Package. 18065822 Includes Option #1 Full Arc Flash Hazard Analysis of the FACI 6973GH25F00278 on USAspending (opens in a new tab) $88,674 3 Order (multiple-award IDIQ) Open to all
Jan 13, 2025 BIL Funds. Construction Cost of UPS and the UPS Ancillary Equipment Removal and Installation at the Little Rock, AR (Lit) ASR (AR2) per the RFQ-25-02 Bid Package. 19004777 Includes Option #1 Partial Arc Flash Hazard Analysis of the FAC 6973GH25F00279 on USAspending (opens in a new tab) $81,061 3 Order (multiple-award IDIQ) Open to all
Jan 13, 2025 BIL Funds. Construction Cost of UPS and the UPS Ancillary Equipment Removal and Installation at the Fayetteville ASR (AR2) per the RFQ-25-02 Bid Package. 21000078 Includes Option #1 Full Arc Flash Hazard Analysis of the Facility. 6973GH25F00280 on USAspending (opens in a new tab) $95,178 3 Order (multiple-award IDIQ) Open to all
Dec 23, 2024 BIL Funds. Construction Cost of UPS and the UPS Ancillary Equipment Removal and Installation at the Amarillo, TX (AMA) ASR per the RFQ-25-03 Bid Package. 18066403 Includes Option #1 Full Arc Flash Hazard Analysis of the Facility. 6973GH25F00307 on USAspending (opens in a new tab) $96,296 2 Order (multiple-award IDIQ) Open to all
Nov 12, 2024 BIL Funds. Construction Cost of UPS and the UPS Ancillary Equipment Removal and Installation at the Fort Smith, AR (FSM) ASR per the RFQ-24-24 (AR1) Bid Package. 18065318 Includes Option #1 Full Arc Flash Hazard Analysis of the Facilit 6973GH25F00043 on USAspending (opens in a new tab) $77,285 2 Order (multiple-award IDIQ) Open to all
Nov 12, 2024 BIL Funds. Construction Cost of UPS and the UPS Ancillary Equipment Removal and Installation at the Texarkana, AR ARSR per the RFQ-24-24 (AR1) Bid Package. 18066399 Includes Option #1 Full Arc Flash Hazard Analysis of the Facilit 6973GH25F00044 on USAspending (opens in a new tab) $107,800 2 Order (multiple-award IDIQ) Open to all
Sep 16, 2024 This Requisition Is for the Installation of Services for Efforts Associated to the System Support Facility (SSF, Building 196)/Program Support Facility, Building 201 Uninterruptible Power Supply (UPS) Replacement. 6973GH24F01525 on USAspending (opens in a new tab) $85,467 2 Order (multiple-award IDIQ) Open to all
Sep 10, 2024 BIL Funds. DC Bus Site Survey, Design and Install Funding for Oklahoma City, OK RTR: 22001049 6973GH24F01467 on USAspending (opens in a new tab) $159,455 6 Order (multiple-award IDIQ) Open to all

Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.

How the work was bought

Competition

Was the work open to bids?

  • Order (multiple-award IDIQ) 91 (100%)

    A task order placed under an IDIQ held by several companies, who competed for it.

Set-asides

Set-aside = reserved for a group of businesses.

  • Open to all 88 (97%)

    No set-aside: any size of business could bid.

  • Small business 3 (3%)

    Only small businesses could bid.

Left out of the numbers above: 6 cancelled or $0 awards. Why?

Umbrella contracts used here

Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.

Contract Type Orders Ordering ends
6973GH22D00007 Multiple-award The IDIQ drew 15 offers 90 Oct 31, 2026
DTFAAC16D00006 Multiple-award The IDIQ drew 18 offers 1 May 3, 2021

Contracts ending soon

Recurring work whose current contract ends within 18 months, so the agency will likely buy it again (a "recompete"). The company doing it today is the incumbent.