Contractor · based in Georgia
Honeywell International, Inc: federal contracts won
UEI E21VP9DNS4N8
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Typical award won (median)
$13,381
The middle of 102 priced awards, FY2021–FY2025. Half were between $8k and $48.4k.
Typical bids faced
1
Median bids per award, reported for 23 of 23 competed awards. 56% drew only one bid.
Won as a small business
3%
Share of the 102 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Honeywell International, Inc was $13.4k (FY2021-FY2025, 102 priced awards).
- That is 75% lower than the median for all construction & facilities work nationwide ($52.8k).
- Competed awards drew a median of 1 offer (reported for 23 of 23).
- 56% of competed awards drew only one offer.
- In FY2025 the middle award was $11.3k, down 9% from FY2024 ($12.4k).
- Tip The typical award drew only 1 bid. Less competition can mean a better chance for a new bidder.
FedComps Pro · coming soon · free waitlist
Get alerts for new facilities support work near you
Includes competitor tracking: follow Honeywell International, Inc and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 29 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 3 | – |
| FY2017 | 1 | – |
| FY2018 | 1 | – |
| FY2019 | 1 | – |
| FY2020 | 3 | – |
| FY2021 | 3 | – |
| FY2022 | 9 | $36,495 |
| FY2023 | 30 | $16,988 |
| FY2024 | 31 | $12,376 |
| FY2025 | 29 | $11,299 |
| FY2026 (provisional) | 46 | $12,989 |
Award sizes
- Holds the median award, $13,381
Recent awards won
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Oct 14, 2026 | Building 51 Build Out FDA Office 2 MD0821WO 47PC5427P0001 on USAspending (opens in a new tab) Provisional Value after changes | $130,021 after changes | 1 | Not competed Open to all |
| Sep 30, 2026 | Replacement Electric Water Heater 120 Gallon 16 KW at 480 Volt 3 Phase at Federal Research Center BLDG 31 in Silver Spring, MD 47PC5426P0032 on USAspending (opens in a new tab) Provisional | $14,302 | 1 | Not competed Open to all |
| Sep 28, 2026 | Exterior Windows Replacement Project BLDG 52 Lab..300 Calendar Days...Silver Spring, MD. 47PC5426P0060 on USAspending (opens in a new tab) Provisional | $34,681 | 1 | Not competed Open to all |
| Sep 28, 2026 | Emergency ~ Campus Wide Walkways Repair White Oak Campus MD0819WO 47PC5426P0063 on USAspending (opens in a new tab) Provisional | $368,682 | 1 | Not competed Open to all |
| Sep 24, 2026 | 47PC5426P0062 - BLDG 64 Repair Exhaust Fan 12 MD0765WO - Project to Replace Exhaust Fan 12 Motor/Return Exhaust Fan to Functional Status. Pop - 09/17/2026-10/19/2026. Located: Lab Building 64 - Silver Spring MD 20903. 47PC5426P0062 on USAspending (opens in a new tab) Provisional | $16,315 | 1 | Competed Open to all |
| Sep 16, 2026 | Replace the VFD Serving AHU 5 in BLDG 62 47PC5426P0059 on USAspending (opens in a new tab) Provisional | $10,030 | 1 | Not competed Open to all |
| Sep 14, 2026 | Replace and Repair Cafeteria Roll Up Gate at White Oak Campus Building 32 47PC5426P0056 on USAspending (opens in a new tab) Provisional | $25,876 | 1 | Not competed Open to all |
| Aug 30, 2026 | Emergency Verbal Notice to Proceed (NTP) AHU 2 VFD Repair White Oak BLDG 52 Silver Spring, MD0826WO. 47PC5426P0057 on USAspending (opens in a new tab) Provisional | $11,029 | 1 | Not competed Open to all |
| Aug 26, 2026 | Pump Out Spilled Oil in CVG-114 Substation Transformer Vault at White Oak in Silver Spring, MD 47PC5426P0052 on USAspending (opens in a new tab) Provisional | $14,355 | 1 | Not competed Open to all |
| Aug 25, 2026 | Building 32 Cafeteria Cabinets, FDA White Oak, Silver Spring, MD. 47PC5426P0053 on USAspending (opens in a new tab) Provisional | $6,232 | 1 | Not competed Open to all |
| Aug 24, 2026 | Building 32 Grease Trap Line Jetting... 90 Calendar Days... Silver Spring MD. 47PC5426P0054 on USAspending (opens in a new tab) Provisional | $9,699 | 1 | Not competed Open to all |
| Aug 10, 2026 | AHU 22 and 23 Return Fan Repair.. 180 Calendar Days. Silver Spring MD. 47PC5426P0040 on USAspending (opens in a new tab) Provisional | $149,902 | 1 | Not competed Open to all |
| Aug 10, 2026 | Building MD0731WO B110 Childcare Broken Window Repairs RM 133 and Building MD0821WO - B51 RM 1144 Window Replacement...180 Calendar Days... Silver Spring MD. 47PC5426P0050 on USAspending (opens in a new tab) Provisional | $7,902 | 1 | Not competed Open to all |
| Aug 6, 2026 | CVG114 Substation O&M Services... 365 Calendar Days.... FDA White Oak Campus. 47PC5426P0049 on USAspending (opens in a new tab) Provisional | $235,300 | 1 | Not competed Open to all |
| Jul 31, 2026 | Building 32 Grill Panel Relocation 47PC5426P0046 on USAspending (opens in a new tab) Provisional | $11,063 | 1 | Not competed Open to all |
| Jul 31, 2026 | Door Closure Repairs for Main Entrance Childcare Development Center..180 Calendar Days... Silver Spring, MD. 47PC5426P0047 on USAspending (opens in a new tab) Provisional | $13,626 | 1 | Not competed Open to all |
| Jul 29, 2026 | BLDG 22 RM 310 Storage Enclosure FRC Building 22 Office Silver Spring, MD 47PC5426P0022 on USAspending (opens in a new tab) Provisional | $21,349 | 1 | Not competed Open to all |
| Jul 29, 2026 | 47PC5426P0036 - MD0822WO Building 31 Great Room Entrance Doors Replacement - Project to Replace Both Front Doors to the Great Room Due to Damage. Pop - 90 Days. Location: Building 31 - Silver Spring, MD 20993. 47PC5426P0036 on USAspending (opens in a new tab) Provisional | $4,881 | 1 | Competed Open to all |
| Jul 23, 2026 | Replace 2 New 6 Inch Isolation Valves BLDG 22 Tunnel Silver Spring, MD0804WO. 47PC5426P0042 on USAspending (opens in a new tab) Provisional | $17,447 | 1 | Not competed Open to all |
| Jul 23, 2026 | Replace the Failed Two VFDS on Smoke Exhaust Fans 2 and 3 in Building 2 47PC5426P0045 on USAspending (opens in a new tab) Provisional | $19,194 | 1 | Not competed Open to all |
| Jul 20, 2026 | 47PC5426P0037 - BLDG 52 Loading Dock High Speed Curtain Repair Project at White Oak Campus 47PC5426P0037 on USAspending (opens in a new tab) Provisional | $9,710 | 1 | Not competed Open to all |
| Jul 16, 2026 | AHU Bearings and Fan Motor Replacements, Silver Spring, MD0827WO. 47PC5426P0033 on USAspending (opens in a new tab) Provisional | $364,234 | 1 | Not competed Open to all |
| Jul 15, 2026 | Flagpole Repairs at BLDG1... 180 Calendar Days... FDA White Oak.. Silver Spring MD. 47PC5426P0041 on USAspending (opens in a new tab) Provisional | $7,362 | 1 | Not competed Open to all |
| Jul 9, 2026 | Industrial Roll Up Door Repair FDA Office 2 Building 51.. FDA White Oak.. Silver Spring, MD. 47PC5426P0034 on USAspending (opens in a new tab) | $14,612 | 1 | Not competed Open to all |
| Jul 8, 2026 | 47PC5426P0035 - Repairs to Fire Pump at Building 32 MD0331WO - Project to Replace Failed Fire Pump in Building No. 32 Maintenance Room on Ground Floor. Pop - 120 Days. Location: Building 32 - Silver Spring, MD 20993. 47PC5426P0035 on USAspending (opens in a new tab) | $25,547 | 1 | Competed Open to all |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders. After changes = the original award value was not reported, so the value shown includes later changes; such awards are left out of price statistics.
How the work was bought
Competition
Was the work open to bids?
- Not competed 77 (75%)
Sole-source: only one company was asked.
- Competed 23 (23%)
A standalone contract that was open to bids.
- Order (single-award IDIQ) 2 (2%)
A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.
Set-asides
Set-aside = reserved for a group of businesses.
- Open to all 102 (100%)
No set-aside: any size of business could bid.
Left out of the numbers above: 1 equipment purchase, 1 cancelled or $0 award. Why?
Who they work for
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| 80JSC022AA026 | Single-award | 2 | Apr 30, 2027 |
Contracts ending soon
Recurring work whose current contract ends within 18 months, so the agency will likely buy it again (a "recompete"). The company doing it today is the incumbent.
-
Contract ends Apr 30, 2027
Energy and Water Management Services - Call 1
Incumbent: Honeywell International, Inc Buyer: NASA Johnson Space Center Value at award: $263,000
80JSC022FA059 on USAspending (opens in a new tab)
Report an error on this page