Contractor · based in Alaska
Nodak Electric & Construction, Inc.: federal contracts won
UEI SBMGQ8Z3TAR7
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Typical award won (median)
$121,417
The middle of 29 priced awards, FY2021–FY2025. Half were between $49.6k and $524k.
Typical bids faced
4
Median bids per award, reported for 29 of 29 competed awards. 3% drew only one bid.
Won as a small business
100%
Share of the 29 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Nodak Electric & Construction, Inc. was $121k (FY2021-FY2025, 29 priced awards).
- That is 2.3 times the median for all construction & facilities work nationwide ($52.8k).
- Competed awards drew a median of 4 offers (reported for 29 of 29).
- 3% of competed awards drew only one offer.
- Its most frequent buyer was 673rd Contracting Squadron (24 priced awards in FY2021-FY2025).
- Tip 55% of these awards were task orders under multiple-award contracts (MATOCs). To compete for those, you first need a spot on one of the umbrella contracts.
- Tip 90% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work near you
Includes competitor tracking: follow Nodak Electric & Construction, Inc. and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 8 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2017 | 1 | – |
| FY2018 | 7 | $68,350 |
| FY2019 | 7 | $26,450 |
| FY2020 | 2 | – |
| FY2021 | 6 | $220,625 |
| FY2022 | 0 | – |
| FY2023 | 7 | $27,450 |
| FY2024 | 8 | $87,719 |
| FY2025 | 8 | $165,223 |
| FY2026 (provisional) | 3 | – |
Award sizes
- Holds the median award, $121,417
Recent awards won
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Apr 14, 2026 | Replace Boilers, Water Heater and Storage Tanks in Building 1102 in Accordance with the Statement of Word (SOW) FA500026F0033 on USAspending (opens in a new tab) | $394,948 | 3 | Order (multiple-award IDIQ) Small business |
| Apr 10, 2026 | Contractor Shall Provide All Labor, Parts, Materials, Equipment, Tools, and Supervision Required to Perform Hazardous Material Sampling, Testing, Abatement, and Remediation Requirements Needs for Facilities on JBER Iaw Attachment 1-STATEMENT of Work. FA500026F0031 on USAspending (opens in a new tab) | $391,511 | 3 | Order (multiple-award IDIQ) Small business |
| Mar 13, 2026 | Replacement of Boilers in Building 10441 in Accordance with the Statement of Work. FA500026F0023 on USAspending (opens in a new tab) | $367,887 | 3 | Order (multiple-award IDIQ) Small business |
| Sep 23, 2025 | Hangar 8 Alert Kitchen Remodel, B14410 (WT#15953457) Provide Labor, Material, and Equipment for Renovation of a Kitchen Area in Hangar 8 Iaw Project and Mini MACC SOW. FA500025F0124 on USAspending (opens in a new tab) | $49,555 | 3 | Order (multiple-award IDIQ) Small business |
| Sep 19, 2025 | Project Consist of Installing Multiple Interior Hose Connections and Insulated Hot Water Tank for Hot Water FA500025F0125 on USAspending (opens in a new tab) | $147,295 | 4 | Order (multiple-award IDIQ) Small business |
| Sep 2, 2025 | Repair/Replacement of the Flooring in Building 7163 in Accordance with the Statement of Work. FA500025F0103 on USAspending (opens in a new tab) | $183,150 | 4 | Order (multiple-award IDIQ) Small business |
| Jul 10, 2025 | FXSB-25-6500-MM Repair/Replace Boilers BLDG 16670 Contractor to Perform All Work As Indicated Within the Mini-MACC and Project Specific Statement of Work. FA500025F0078 on USAspending (opens in a new tab) | $740,915 | 4 | Order (multiple-award IDIQ) Small business |
| Jun 16, 2025 | 25-1675 Repair Structure Op Contractor to Perform All Work As Indicated Within the Mini-MACC and Project Specific Statement of Work. FA500025F0059 on USAspending (opens in a new tab) | $524,480 | 5 | Order (multiple-award IDIQ) Small business |
| Jun 9, 2025 | Repair of Fire Suppression Room by Addition of Heat Source in Buildings 724, 812, 974 and 976 in Accordance with the Statement of Work. FA500025F0057 on USAspending (opens in a new tab) | $98,744 | 5 | Order (multiple-award IDIQ) Small business |
| Apr 10, 2025 | Replace HVAC Maint & Curatorial BLDGS - Skagway AK 140P9725C0003 on USAspending (opens in a new tab) | $870,000 | 3 | Competed Small business |
| Mar 12, 2025 | Demo and Renovate Kitchen in Building 682 Room 459 Iaw the SOW. FA500025F0020 on USAspending (opens in a new tab) | $51,301 | 4 | Order (multiple-award IDIQ) Small business |
| Sep 27, 2024 | Install Hose Connections Iaw 23-2801 SOW 9524 FA500024F0160 on USAspending (opens in a new tab) | $18,400 | 3 | Order (multiple-award IDIQ) Small business |
| Sep 26, 2024 | Generator Projects - Multiple Locations 47PL0124C0008 on USAspending (opens in a new tab) | $1,080,858 | 3 | Competed Small business |
| Sep 11, 2024 | 24-5842 Renovate COMM Drops B622, JBER, AK 99506 the Attached Mini-MACC and Subject Project Statement of Work and Associated Appendices Will Apply to This Task Order. FA500024F0116 on USAspending (opens in a new tab) | $121,417 | 5 | Order (multiple-award IDIQ) Small business |
| Jul 26, 2024 | The Mini-MACC Statement of Work and Associated Appendices Will Apply to This Task Order. This Task Order Has Individual Requirements As Identified Through the FOPR 23-9082 Repair Sound Entrance Doors B11575. FA500024F0082 on USAspending (opens in a new tab) | $71,789 | 4 | Order (multiple-award IDIQ) Small business |
| Jul 25, 2024 | Repair Work Areas, 176WG Campus (FXSB221655) W50S6L24FA004 on USAspending (opens in a new tab) | $566,572 | 5 | Order (multiple-award IDIQ) Small business |
| May 15, 2024 | The Mini-Multiple Award Construction Contract (Mini-MACC) to Perform Minor Construction, Facility Repair/Alteration, and Real Property Repair/Alteration Projects on an As Needed Basis. FA500024F0059 on USAspending (opens in a new tab) | $88,100 | 5 | Order (multiple-award IDIQ) Small business |
| Apr 30, 2024 | Mini MACC G4 Classroom CBR FA500024F0029 on USAspending (opens in a new tab) | $32,875 | 5 | Order (multiple-award IDIQ) Small business |
| Apr 22, 2024 | The Mini-Multiple Award Construction Contract (Mini-MACC) to Perform Minor Construction, Facility Repair/Alteration, and Real Property Repair/Alteration Projects on an As Needed Basis. FA500024F0046 on USAspending (opens in a new tab) | $87,338 | 5 | Order (multiple-award IDIQ) Small business |
| Sep 7, 2023 | Replace Two Water Fountains. FA500023F0138 on USAspending (opens in a new tab) | $13,384 | 5 | Order (multiple-award IDIQ) Small business |
| Sep 6, 2023 | Post Award Conference FA500023F0133 on USAspending (opens in a new tab) | $2,000 | 5 | Order (multiple-award IDIQ) Small business |
| Aug 30, 2023 | ADAL Engine Test Facility, JBER, Alaska W50S6L23C0004 on USAspending (opens in a new tab) | $561,800 | 1 | Competed Small business |
| Aug 7, 2023 | Changing Tables FA500023P0073 on USAspending (opens in a new tab) | $77,040 | 6 | Competed Open to all |
| Jul 24, 2023 | Sprinkler Repair FA500023P0070 on USAspending (opens in a new tab) | $27,450 | 3 | Competed Open to all |
| Jul 6, 2023 | Repair Earthquake Damage at FAA Anchorage Air Route Traffic Control Center (Artcc) Located in Anchorage 697DCK23C00262 on USAspending (opens in a new tab) | $687,642 | 2 | Competed Open to all |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Order (multiple-award IDIQ) 16 (55%)
A task order placed under an IDIQ held by several companies, who competed for it.
- Competed 13 (45%)
A standalone contract that was open to bids.
Set-asides
Set-aside = reserved for a group of businesses.
- Small business 26 (90%)
Only small businesses could bid.
- Open to all 3 (10%)
No set-aside: any size of business could bid.
Left out of the numbers above: 1 equipment purchase. Why?
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| FA500023D0004 | Multiple-award The IDIQ drew 15 offers | 16 | Sep 5, 2028 |
Similar contractors
- Khotol Services Corporation
- Treon Support Services JV, LLC
- Olgoonik Enterprises, LLC
- TB, Inc.
- Port Fidalgo Constructors Inc
- Ahtna Infrastructure & Technologies LLC
- Aleut Field Services LLC
- Chitina Diversified Services, LLC
- Bristol Design Build Services, LLC
- Lakota Solutions LLC
- Cci Solutions, LLC
- Frawner Corporation
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.