Contractor · based in Alabama
Provision Contracting Services LLC: federal contracts won
UEI EJ4KCN28Y936
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Typical award won (median)
$25,413
The middle of 5 priced awards, FY2021–FY2025.
Typical bids faced
–
Too few awards report bids (1 of 1) to show a typical number.
Won as a small business
–
Not enough priced awards to show a share.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Provision Contracting Services LLC was $25.4k (FY2021-FY2025, 5 priced awards).
- Its most frequent buyer was SER East MABO (4 priced awards in FY2021-FY2025).
- There were 6 construction & facilities awards won by Provision Contracting Services LLC in FY2021-FY2025; 5 had a usable price.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work near you
Includes competitor tracking: follow Provision Contracting Services LLC and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: no awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 1 | – |
| FY2017 | 5 | $119,980 |
| FY2018 | 4 | – |
| FY2019 | 1 | – |
| FY2020 | 3 | – |
| FY2021 | 2 | – |
| FY2022 | 1 | – |
| FY2023 | 1 | – |
| FY2024 | 1 | – |
| FY2025 | 0 | – |
| FY2026 (provisional) | 0 | – |
Award sizes
- Holds the median award, $25,413
Recent awards won
The latest 21 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Aug 14, 2024 | Install Temporary Power Pole with Weather Head per Alabama Power Requirements (See Attached Drawing.) Set Combined Meter Base for 150-AMP Service As Required on the Pole. Contractor to Ensure the Temporary Power Requirements Meet NEC and City 140P5124P0065 on USAspending (opens in a new tab) | $31,377 | 1 | Not competed 8(a) |
| Feb 23, 2023 | Perform Mold Remediation on First Floor Ceiling Hallway, Upper Wall Hallway, Remove Water Stains and Paint Hallway Wall at the Oaks, Home Tuskegee Institute National Historic Site. 140P5123P0015 on USAspending (opens in a new tab) | $25,413 | 1 | Not competed 8(a) |
| Sep 20, 2022 | Building 904 Wall Project FA330022P0060 on USAspending (opens in a new tab) Equipment purchase | $3,160 | 1 | Not competed 8(a) |
| Jun 15, 2022 | Perform Mold Remediation in the Cadet Waiting Room at Hangar One. The Contractor Shall Read the Entire Mold Inspection Report and Lab Results and Follow All Guidelines Stated in Both Reports. The Contractor Shall Follow the Recommendations in the MOL 140P5122C0018 on USAspending (opens in a new tab) | $14,744 | 1 | Not competed 8(a) |
| Jul 22, 2021 | Heating, Ventilation, Air-Conditioning (HVAC) Inspections, Repairs, and at the Skyway Club and Curatorial Storage Building Located in Tuskegee Airmen National Historic Site Tuskegee, Alabama. 140P5121P0086 on USAspending (opens in a new tab) | $94,898 | 1 | Not competed 8(a) |
| Feb 5, 2021 | West Gate Installation (Tuskegee) 36C24721C0063 on USAspending (opens in a new tab) | $7,770 | 1 | Competed Open to all |
| Aug 21, 2020 | HVAC Equipment Replacement - BLDG. 1 Shop Basement, As per Attached Statement of Work 12405B20P0366 on USAspending (opens in a new tab) | $37,588 | 1 | Not competed 8(a) |
| Jul 1, 2020 | Inspect/Repair (7) Seven Condensers/Compressors at Hangar Two, Skyway Club, the Oaks and Headquarter Building at Tuskegee Airmen NHS. 140P5120P0059 on USAspending (opens in a new tab) | $50,427 | 1 | Not competed 8(a) |
| Feb 21, 2020 | Work to Replace Concrete Slab Between BLDG. 1 and Soil Bins. 12405B20P0107 on USAspending (opens in a new tab) | $21,459 | 1 | Not competed 8(a) |
| Jul 17, 2019 | Funds for Renovation of BLDG. 1403ROOM 150 FA330019CA015 on USAspending (opens in a new tab) | $38,114 | 1 | Not competed Open to all |
| Sep 14, 2018 | Project 679-15-101 Legionella Precautions 36C24718C0204 on USAspending (opens in a new tab) | $655,727 | 3 | Competed Veteran-owned |
| Sep 4, 2018 | Renovate ROTC BLDG. 1433 FA330018C0018 on USAspending (opens in a new tab) | $3,751,641 | 1 | Not competed Open to all |
| May 24, 2018 | Supply Equipment W911SF18P0045 on USAspending (opens in a new tab) | $127,427 | 1 | Not competed 8(a) |
| Apr 19, 2018 | Furnish All Labor, Supervision, Tools, and Materials to Provide Construction Services Necessary to Provide and Install BMS Controls and Valves at Building 3, at USDA-ARS National Soil Dynamics Lab, Auburn, AL 36832 per the Attached Statement of Work. All Work Shall Be Performed in Accordance with the Terms, Conditions, Drawings and Specifications Contained in This Document. 1232SD18C0007 on USAspending (opens in a new tab) | $22,752 | 1 | Not competed 8(a) |
| Sep 25, 2017 | HVAC, Electrical Circuits BLDG 892 FA330017C0029 on USAspending (opens in a new tab) Equipment purchase | $21,831 | 1 | Not competed 8(a) |
| Sep 13, 2017 | Electrical for Furniture B888 FA330017C0028 on USAspending (opens in a new tab) | $8,757 | 1 | Not competed Open to all |
| Aug 25, 2017 | Replace Electrical Panels BLDG. 3: Furnish All Labor, Supervision, Tools, and Materials Be Provided to Provide Construction Services and Materials Necessary for Replacing 10 Panel Boards, 5 MCCS, and 2 Safety Switches for Building 3 of USDA, ARS, Soil Dynamics Lab in Auburn, Al per the Attached Statement of Work. All Work Shall Be Performed in Accordance with the Terms, Conditions, Drawings and… AG32SDC170056 on USAspending (opens in a new tab) | $119,980 | 1 | Not competed 8(a) |
| Jul 27, 2017 | (no description) FA330017C0014 on USAspending (opens in a new tab) | $940,788 | 1 | Not competed Open to all |
| Mar 20, 2017 | Repair HVAC - Main Building 50 AG32SDC170016 on USAspending (opens in a new tab) | $68,585 | 1 | Not competed 8(a) |
| Dec 15, 2016 | Hollow Core Composite Doors W911SF17P0013 on USAspending (opens in a new tab) | $156,139 | 1 | Not competed Open to all |
| Sep 29, 2016 | Other Functions Replacement of (5) Windows on East Side of BLDG. 1 As per Statement of Work. AG32SDP160933 on USAspending (opens in a new tab) | $24,781 | 1 | Not competed Open to all |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Not competed 4 (80%)
Sole-source: only one company was asked.
- Competed 1 (20%)
A standalone contract that was open to bids.
Set-asides
Set-aside = reserved for a group of businesses.
- 8(a) 4 (80%)
Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.
- Open to all 1 (20%)
No set-aside: any size of business could bid.
Left out of the numbers above: 1 equipment purchase. Why?
Who they work for
Similar contractors
- Spectrum Solutions Inc
- Kwest Enterprises LLC
- M & D Mechanical Contractors Inc
- Mcclain Contracting Co Inc
- Caddell Construction Co. (De), LLC
- BCCG A Joint Venture
- The Robins & Morton Group
- Timberline Construction Group, LLC
- Bert Construction Inc
- Barlovento LLC
- Bear Brothers Inc
- Moon Construction Services, Inc
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.