Contractor · based in Missouri
Southtown Glass, Inc.: federal contracts won
UEI JUQ9BXSQ61J8
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Typical award won (median)
$138,215
The middle of 5 priced awards, FY2021–FY2025.
Typical bids faced
8
Median bids per award, reported for 5 of 5 competed awards.
Won as a small business
–
Not enough priced awards to show a share.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Southtown Glass, Inc. was $138k (FY2021-FY2025, 5 priced awards).
- Competed awards drew a median of 8 offers (reported for 5 of 5).
- Its most frequent buyer was MWR Missouri MABO (3 priced awards in FY2021-FY2025).
FedComps Pro · coming soon · free waitlist
Get alerts for new HVAC & plumbing work near you
Includes competitor tracking: follow Southtown Glass, Inc. and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: no awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2018 | 2 | – |
| FY2019 | 3 | – |
| FY2020 | 2 | – |
| FY2021 | 2 | – |
| FY2022 | 2 | – |
| FY2023 | 1 | – |
| FY2024 | 0 | – |
| FY2025 | 0 | – |
| FY2026 (provisional) | 0 | – |
Award sizes
- Holds the median award, $138,215
Recent awards won
The latest 12 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Sep 13, 2023 | Replace Cook House HVAC at Lincoln Home National Historic Site 140P6223P0069 on USAspending (opens in a new tab) | $61,465 | 11 | Competed Small business |
| Aug 25, 2022 | Replace CRAC Unit #2 B54 W50S7X22C0002 on USAspending (opens in a new tab) | $222,935 | 4 | Competed Small business |
| Aug 12, 2022 | HVAC System Replacement - House Building - Lincoln Home National Historic Site - Springfield, IL 140P6222P0046 on USAspending (opens in a new tab) | $116,665 | 8 | Competed Small business |
| Sep 21, 2021 | To Build a New Pole BARN Structure. This Work Will Include Installation of a Single 40X60 Wooden Pole BARN, with the Installation of Concrete, Electrical Utilities, and Entry Doors. W912DQ21P1089 on USAspending (opens in a new tab) | $176,890 | 9 | Competed Small business |
| Sep 14, 2021 | Replace Multiple HVAC Systems at Lincoln Home National Historic Site, in Springfield, IL. Locations Include, Education Center, Carriage House at Lincoln Home National Historic Site 140P6221C0013 on USAspending (opens in a new tab) | $138,215 | 2 | Competed Small business |
| Sep 25, 2020 | HVAC Replacement and Dubois House for Lincoln Home National Historic Site 140P6220P0057 on USAspending (opens in a new tab) | $70,790 | 5 | Competed Small business |
| Jun 26, 2020 | Swing Space AC Replacement As per SOW. 12805B20C0021 on USAspending (opens in a new tab) | $41,355 | 3 | Competed Small business |
| Sep 23, 2019 | Replace HVAC at Lincoln Home National Historic Site, One New High Efficiency Natural Gas Furnace and Matching Condensing Unit/Evaporator Coil. All Equipment Shall Be 98.7 Higher Efficiency Units and Qualify 140P6219P0070 on USAspending (opens in a new tab) | $24,115 | 5 | Competed Small business |
| Aug 16, 2019 | Install Approximately 276 LF (Field Verify) of Galvanized Railing System on Building 18, Fuel Cell Hangar. W912NS19C6004 on USAspending (opens in a new tab) | $53,905 | 4 | Competed Small business |
| Feb 19, 2019 | Visitors Center HVAC Replacement 140R6019C0002 on USAspending (opens in a new tab) | $125,745 | 4 | Competed Small business |
| Sep 26, 2018 | Pole BARN at Longview Lake W912DQ18C1077 on USAspending (opens in a new tab) | $112,400 | 3 | Competed Small business |
| Aug 31, 2018 | Project Title: HVAC Installation Project Description: Contractor Shall Provide All Labor, Materials and Incidentals for the Installation of Two Mini Split Units for Riverside Indian School. All Work Shall Be Completed in Accordance with the Statement of Work, Contract Terms and Conditions and the Construction Wage Rate Requirements. Project Location: Riverside Indian School, Anadarko, Oklahoma… 140A0318C0011 on USAspending (opens in a new tab) | $75,745 | 4 | Competed Small business |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Competed 5 (100%)
A standalone contract that was open to bids.
Set-asides
Set-aside = reserved for a group of businesses.
- Small business 5 (100%)
Only small businesses could bid.
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.