Contractor · based in Mississippi
Upchurch Services LLC: federal contracts won
UEI KSHUZHFANJB6
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Typical award won (median)
$11,479
The middle of 5 priced awards, FY2021–FY2025.
Typical bids faced
–
Too few awards report bids (4 of 4) to show a typical number.
Won as a small business
–
Not enough priced awards to show a share.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Upchurch Services LLC was $11.5k (FY2021-FY2025, 5 priced awards).
- Its most frequent buyer was USDA ARS SEA AAO Acquisition/Personal Property (3 priced awards in FY2021-FY2025).
- There were 5 construction & facilities awards won by Upchurch Services LLC in FY2021-FY2025; 5 had a usable price.
FedComps Pro · coming soon · free waitlist
Get alerts for new HVAC & plumbing work near you
Includes competitor tracking: follow Upchurch Services LLC and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 1 award
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 4 | – |
| FY2017 | 3 | – |
| FY2018 | 5 | $9,835 |
| FY2019 | 2 | – |
| FY2020 | 0 | – |
| FY2021 | 2 | – |
| FY2022 | 2 | – |
| FY2023 | 0 | – |
| FY2024 | 0 | – |
| FY2025 | 1 | – |
| FY2026 (provisional) | 2 | – |
Award sizes
- Holds the median award, $11,479
Recent awards won
The latest 24 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Sep 25, 2026 | Emergency Natural Gas Line and Water Line Leak Repair. This Requirement Is Necessary for the Safety and Security of Lab Experiments on This Site 1232SA26P0876 on USAspending (opens in a new tab) Provisional | $19,452 | 1 | Not competed Open to all |
| Sep 4, 2026 | Replace 3 Roof Mounted Air Handling Units, Repair One Air Handling Unit and Repair One Chiller B-1 1232SA26P0671 on USAspending (opens in a new tab) Provisional | $491,682 | 5 | Competed Open to all |
| Jun 2, 2025 | Replace Compressor & Reversing Valve 140P5225P0043 on USAspending (opens in a new tab) | $6,500 | 1 | Competed Open to all |
| Jul 31, 2022 | Chiller Replacement 12405B22P0239 on USAspending (opens in a new tab) | $21,788 | 4 | Competed Open to all |
| May 22, 2022 | Replace Water Main in Hatchery 12405B22P0118 on USAspending (opens in a new tab) | $11,479 | 2 | Competed Open to all |
| Jun 1, 2021 | Installation of New Carrier Chiller at BLDG. 12. 12405B21P0282 on USAspending (opens in a new tab) | $18,622 | 1 | Competed Open to all |
| Feb 8, 2021 | Installation of Equipment 15F06721P0002724 on USAspending (opens in a new tab) | $3,810 | 1 | Not competed Open to all |
| Apr 4, 2019 | Labor and Materials to Replace Three Trane Fan Coil 12405B19P0139 on USAspending (opens in a new tab) | $20,925 | 3 | Competed Open to all |
| Mar 27, 2019 | Emergency Service for Jetting Sewer Line Out to Unclog Sewer Main Line, in Stoneville, MS. 12405B19P0122 on USAspending (opens in a new tab) | $2,636 | 1 | Not competed Open to all |
| Aug 17, 2018 | Services to Clean Geothermal Condenser Water Loop at FCC Yazoo City, MS 15B31518PTP120360 on USAspending (opens in a new tab) | $9,620 | 1 | Not competed Open to all |
| Aug 9, 2018 | Emergency Repair, BLDG. 80 Leaking Cooling Tower Pipes; Contractor Shall Excavate Around and Under (2) 10" Steel Pipes and Support Pipes During Excavation. Remove Section of Leaking 10" Steel Pipe with Sweeping 90 Degree Elbow. De-Water Hole Approx. 10 10 8', Remove Wet Soil from Site and Dispose Off Site. Remove Section of Leaking Pipe, Install and Weld New Pipes Using Certified Welder. Turn on… 1232SD18P0508 on USAspending (opens in a new tab) | $7,250 | 1 | Not competed Open to all |
| Jul 27, 2018 | (no description) 15F06718P0006243 on USAspending (opens in a new tab) Equipment purchase | $8,930 | 3 | Competed Open to all |
| Jul 13, 2018 | Emergency Services to Repair McQuay Chiller Model Number:AGZ160CHSNN-ER10, Serial Number 1232SD18P0431 on USAspending (opens in a new tab) | $9,835 | 1 | Not competed Open to all |
| May 18, 2018 | Replace Evaporator Coil and Condensing W912L718F0015 on USAspending (opens in a new tab) | $13,291 | 1 | Order (multiple-award IDIQ) Small business |
| Apr 12, 2018 | Replace Gear Box to Low Powerhouse at FCC Yazoo City Project Code: 3C3J 15B31518PT3J20001 on USAspending (opens in a new tab) | $11,860 | 3 | Competed Open to all |
| Aug 3, 2017 | Liebert Unit Repair 0003 on USAspending (opens in a new tab) | $2,500 | 1 | Order (multiple-award IDIQ) Small business |
| Jun 7, 2017 | Repair Leaking Motor Terminals and Purifier Purge Leaks on #1 Chiller at Medium. (Various Parts&Installation) Repair Chiller #1 at Medium DJBP0315SP320049 on USAspending (opens in a new tab) Equipment purchase | $6,520 | 3 | Competed Small business |
| May 26, 2017 | Replace Gas Solenoid 0002 on USAspending (opens in a new tab) | $2,500 | 1 | Order (multiple-award IDIQ) Small business |
| May 24, 2017 | HVAC Services 0001 on USAspending (opens in a new tab) | $1,330 | 1 | Order (multiple-award IDIQ) Small business |
| Aug 10, 2016 | Emergency Repair to BLDG. 80 Chiller Outside of Service Contract; Replaced Purge Solenoid Valves and Replaced Purge Pump Out Pump AG4M55P160101 on USAspending (opens in a new tab) | $3,331 | 1 | Not competed Open to all |
| Jul 14, 2016 | Repair Cooling Tower Fan&Installation (Various Parts&Installation) Project # 3B7H - Replace Chiller Starter at Medium DJBP0315R7H10002 on USAspending (opens in a new tab) Equipment purchase | $19,730 | 3 | Competed Small business |
| Mar 9, 2016 | The Contractor Shall Provide All Materials, Labor, and Equipment to Make Repairs to Trane Chiller Model CVHE500 at the USDA, ARS, BLDG.#80 in Stoneville, MS AG4M55P160051 on USAspending (opens in a new tab) | $4,980 | 1 | Not competed Open to all |
| Nov 2, 2015 | Provide All Materials, Labor, and Equipment Required to Inspect and Service (2)Trane Water Cooled Chillers Model# CVHE-050 Centrifugal Water Chillers, Located at BLDG.80, at USDA-ARS in Stoneville, MS for the Period of 11/01/2015 - 10/31/2016 AG4M55P160020 on USAspending (opens in a new tab) | $7,452 | 3 | Competed Open to all |
| Oct 14, 2015 | For Other Functions Annual Gas Line Inspection on the Medium and Low Chillers at FCC Yazoo City DJBYAZRP120016 on USAspending (opens in a new tab) | $4,794 | 3 | Competed Small business |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Competed 4 (80%)
A standalone contract that was open to bids.
- Not competed 1 (20%)
Sole-source: only one company was asked.
Set-asides
Set-aside = reserved for a group of businesses.
- Open to all 5 (100%)
No set-aside: any size of business could bid.
Who they work for
Similar contractors
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.