Contracting office
Building Construction contracts from AQ HQ RCO-AK Wainwright (W912D0)
Also called: 0413 AQ HQ RCO-AK WAINWRIG
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Open Building Construction bids here now
No open Building Construction bids here right now. Updated weekly from SAM.gov · data through Oct 25. Save this search
Typical award (median)
$235,156
The middle of 187 priced awards, FY2021–FY2025. Half were between $78.9k and $687k.
Typical number of bids
3
Median bids per award, reported for 106 of 106 competed awards. 15% drew only one bid.
Won by small businesses
100%
Share of the 187 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle building construction award from AQ HQ RCO-AK Wainwright was $235k (FY2021-FY2025, 187 priced awards).
- That is 32% higher than the median for building construction nationwide ($178k).
- Competed awards drew a median of 3 offers (reported for 106 of 106).
- 15% of competed awards drew only one offer.
- In FY2025 the middle award was $296k, down 20% from FY2024 ($367k).
- Tip 55% of these awards were task orders under multiple-award contracts (MATOCs). To compete for those, you first need a spot on one of the umbrella contracts.
- Tip 100% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work near you
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 24 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 33 | $62,976 |
| FY2017 | 34 | $45,524 |
| FY2018 | 4 | – |
| FY2019 | 18 | $45,739 |
| FY2020 | 27 | $200,000 |
| FY2021 | 48 | $118,645 |
| FY2022 | 44 | $217,317 |
| FY2023 | 29 | $327,536 |
| FY2024 | 42 | $367,337 |
| FY2025 | 24 | $295,518 |
| FY2026 (provisional) | 5 | $1,404,621 |
Award sizes
- Holds the median award, $235,156
Recent awards
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | ||||
|---|---|---|---|---|---|
| Jun 8, 2026 | DPW AK Has a Requirement to Repair and Provide All Materials, Labor, and Equipment to Complete Repairs Necessary per This SOW and the Construction Documents to Conversion Pool in Building 3452 Addressed in This Project. On Ft. Wainwright. W912D026FA096 on USAspending (opens in a new tab) | Alcan Builders Incorporated | $1,997,112 | 4 | Order (multiple-award IDIQ) Small business |
| May 7, 2026 | Build Buildings at M320 Range at Fort Wainwright Alaska W912D026CA001 on USAspending (opens in a new tab) | Ghemm Solutions, LLC | $1,069,890 | 10 | Competed Small business |
| Apr 28, 2026 | DPW AK Has a Requirement to Repair and Provide All Materials, Labor, and Equipment to Complete the Repairs Necessary per This SOW and Construction Documents to Repairing Flooring in BLDG. 3015 Addressed in This Repair Project. On Ft. Wainwright. W912D026FA094 on USAspending (opens in a new tab) | Alcan Builders Incorporated | $301,843 | 3 | Order (multiple-award IDIQ) Small business |
| Apr 17, 2026 | DPW Alaska Has a Requirement to Repair and Provide All Materials, Labor, and Equipment to Complete the Repairs Necessary per This SOW and the Construction Documents to Improve Avenue Addressed in This Repair Project. On Ft. Wainwright W912D026FA074 on USAspending (opens in a new tab) | Orion Construction, Inc. | $2,226,551 | 4 | Order (multiple-award IDIQ) Small business |
| Mar 16, 2026 | DPW AK Has a Requirement to Repair and Provide All Materials, Labor, and Equipment to Complete the Repairs Necessary per This SOW and the Construction Documents to Repair Drainage in Building 3490 Addressed in This Repair Project on Ft. Wainwright. W912D026FA059 on USAspending (opens in a new tab) | Heritage-M2C1 Joint Venture | $1,404,621 | 4 | Order (multiple-award IDIQ) Small business |
| Sep 18, 2025 | DPW AK Has a Requirement to Provide All Materials, Labor, and Equipment to Complete the Repairs Necessary per This Statement of Work and Remediate All Mold and Asbestos Containing Materials in the Northwest Mechanical Room of B3030 on Ft. Wainwright W912D025FA118 on USAspending (opens in a new tab) | Bristol Prime Contractors, LLC | $185,642 | 5 | Order (multiple-award IDIQ) Small business |
| Sep 16, 2025 | The Directorate of Public Works (DPW) Alaska Has a Requirement for Mold Remediation and Water Damage Repair Due to Age of Building. The Flooring, Wall Surfaces, Ceiling, and Lighting Will Be Addressed in This Repair Project on Ft. Wainwright. W912D025FA117 on USAspending (opens in a new tab) | Bristol Prime Contractors, LLC | $327,929 | 3 | Order (multiple-award IDIQ) Small business |
| Sep 15, 2025 | B3401 ADA Improvements with Options W912D025FA112 on USAspending (opens in a new tab) | Bristol Prime Contractors, LLC | $5,636,350 | 4 | Order (multiple-award IDIQ) Small business |
| Aug 28, 2025 | The Directorate of Public Works (DPW) Alaska Has a Requirement to Repair Ile De and Ave on Fort Wainwright. All Materials, Labor, and Equipment to Complete the Repairs Necessary per This Statement W912D025FA101 on USAspending (opens in a new tab) | Heritage-M2C1 Joint Venture | $2,252,176 | 4 | Order (multiple-award IDIQ) Small business |
| Aug 28, 2025 | The Directorate of Public Works (DPW) Alaska Has a Requirement to Water Damage in Building 4109 on Fort Wainwright. All Materials, Labor, and Equipment to Complete the Repairs Necessary per This Statement of Work and the Construction. W912D025FA103 on USAspending (opens in a new tab) | Orion Construction, Inc. | $124,457 | 2 | Order (multiple-award IDIQ) Small business |
| Aug 27, 2025 | The Intent of This Project Is Remediation of the Mold and Water Damaged Sheetrock in the Basement of B1049 Between Units 2 and 3. The Project Will Also Entail Repair of Plumbing Found to Be Defective in B1049 on Ft. Wainwright. W912D025FA097 on USAspending (opens in a new tab) | Alcan Builders Incorporated | $155,774 | 2 | Order (multiple-award IDIQ) Small business |
| Aug 22, 2025 | The Directorate of Public Works (DPW) Alaska Has a Requirement to Repair Earth Covered Magazines for Buildings 1925,1926,1927,1928, and 1929 on Fort Wainwright. W912D025FA053 on USAspending (opens in a new tab) | Heritage-M2C1 Joint Venture | $1,396,149 | 2 | Order (multiple-award IDIQ) Small business |
| Aug 13, 2025 | The Directorate of Public Works (DPW) Alaska Has a Requirement to Repair the Current Electrical System by Increasing the Current Capacity in Building 1610. W912D025FA081 on USAspending (opens in a new tab) | Alcan Builders Incorporated | $94,726 | 1 | Order (multiple-award IDIQ) Small business |
| Aug 13, 2025 | The Directorate of Public Works (DPW) Alaska Has a Requirement to Repair Floor Boxes B3437 on Fort Wainwright. W912D025FA082 on USAspending (opens in a new tab) | Heritage-M2C1 Joint Venture | $197,857 | 2 | Order (multiple-award IDIQ) Small business |
| Aug 11, 2025 | The Directorate of Public Works (DPW) Alaska Has a Requirement to Repair Failing Cranes in Buildings 3480 and 3490 by Providing All Materials, Labor, Equipment, and Admin Required to Correct Discrepancies Identified in Inspection W912D025FA077 on USAspending (opens in a new tab) | Orion Construction, Inc. | $346,161 | 3 | Order (multiple-award IDIQ) Small business |
| Jul 21, 2025 | Repair Phase 2 to Reconstruct a Two Story Structure and Paint with Arctic Grade to Withstand Temps and High Winds 9 Structures. See PWS for More Details. W912D025FA068 on USAspending (opens in a new tab) | Orion Construction, Inc. | $348,293 | 2 | Order (multiple-award IDIQ) Small business |
| Jul 17, 2025 | B653 Replace the Flooring W912D025FA066 on USAspending (opens in a new tab) | Orion Construction, Inc. | $279,508 | 2 | Order (multiple-award IDIQ) Small business |
| Jul 9, 2025 | Repair Softball Field Ft Greely, Alaska W912D025FA062 on USAspending (opens in a new tab) | Heritage-M2C1 Joint Venture | $735,878 | 2 | Order (multiple-award IDIQ) Small business |
| Jul 9, 2025 | The Directorate of Public Works (DPW) Alaska Has a Requirement to Repair Inoperative Well in Building 1820 on Fort Wainwright. The Existing Pump in Building 1820 Has Failed and Is in Need of Repair W912D025FA065 on USAspending (opens in a new tab) | Heritage-M2C1 Joint Venture | $197,565 | 1 | Order (multiple-award IDIQ) Small business |
| Jun 23, 2025 | The Directorate of Public Works (DPW) Alaska Has a Requirement to Remediate Mold in Building 3446 Room 104 on Fort Wainwright W912D025FA051 on USAspending (opens in a new tab) | Heritage-M2C1 Joint Venture | $91,563 | 2 | Order (multiple-award IDIQ) Small business |
| Jun 11, 2025 | The Directorate of Public Works (DPW) Alaska Has a Requirement to Install Exit Signs in BLDG. 2295 on Fort Wainwright. W912D025FA036 on USAspending (opens in a new tab) | Alcan Builders Incorporated | $123,009 | 1 | Order (multiple-award IDIQ) Small business |
| Jun 11, 2025 | The Directorate of Public Works (DPW) Alaska Has a Requirement to Repair Flooring in Building 3010 on Ft Wainwright. Existing Flooring in Building 3010 Has Reached End of Life Expectancy and Is in Need of Repair. Demo Existing and Dispose Off Post. W912D025FA038 on USAspending (opens in a new tab) | Chemtrack/Cornerstone JV II, LLC | $159,225 | 3 | Order (multiple-award IDIQ) Small business |
| Jun 11, 2025 | The Directorate of Public Works (DPW) Alaska Has a Requirement to Provide All Necessary Labor, Supplies, and Equipment in Demo and Remove Existing Asphalt Where Shown on the Drawings. Haul and Dispose of Asphalt, Not Soil. W912D025FA041 on USAspending (opens in a new tab) | Weldin Construction LLC | $1,170,399 | 4 | Order (multiple-award IDIQ) Small business |
| Jun 4, 2025 | (DPW) Alaska Has a Requirement to DPW24008-4J B1555 Repair Townhouses SMR on Fort Wainwright. The Finishes Are in Need of Repair Due to Age of Building. The Flooring, Wall Surfaces, Ceiling, and Lighting Will Be Addressed in This Repair Project. W912D025FA027 on USAspending (opens in a new tab) | Orion Construction, Inc. | $856,381 | 4 | Order (multiple-award IDIQ) Small business |
| Jun 4, 2025 | The Directorate of Public Works (DPW) Alaska Has a Requirement to Upgrade Mechanical and Improvements to the Heating Systems, and Eye Wash Stations in Building 2077 on Ft. W912D025FA029 on USAspending (opens in a new tab) | Orion Construction, Inc. | $794,401 | 3 | Order (multiple-award IDIQ) Small business |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
Who won
Companies with the most priced awards here, FY2021–FY2025.
| # | Company | Awards | Total value at award |
|---|---|---|---|
| 1 | Heritage-M2C1 Joint Venture | 91 | $41,868,228 |
| 2 | Aleut Field Services LLC | 26 | $16,609,522 |
| 3 | Orion Construction, Inc. | 25 | $11,653,061 |
| 4 | Weldin Construction LLC | 14 | $10,339,426 |
| 5 | Alcan Builders Incorporated | 12 | $5,345,409 |
| 6 | Eklutna Construction & Maintenance, LLC | 6 | $4,580,633 |
| 7 | Bristol Prime Contractors, LLC | 4 | $6,207,583 |
| 8 | Chemtrack/Cornerstone JV II, LLC | 3 | $3,676,382 |
| 9 | Tikigaq Constructors LLC | 2 | $120,836 |
| 10 | F & W Construction Company Incorporated | 1 | $907,108 |
How the work was bought
Competition
Was the work open to bids?
- Order (multiple-award IDIQ) 102 (55%)
A task order placed under an IDIQ held by several companies, who competed for it.
- Order (single-award IDIQ) 81 (43%)
A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.
- Competed 4 (2%)
A standalone contract that was open to bids.
Set-asides
Set-aside = reserved for a group of businesses.
- Small business 106 (57%)
Only small businesses could bid.
- HUBZone 55 (29%)
Reserved for small businesses in a Historically Underutilized Business Zone.
- 8(a) 26 (14%)
Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.
Left out of the numbers above: 1 cancelled or $0 award. Why?
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| W912D019D0005 | Single-award The IDIQ drew 1 offers | 55 | Sep 5, 2024 |
| W912CN21D0020 | Multiple-award The IDIQ drew 12 offers | 36 | Aug 31, 2026 |
| W912D019D0004 | Single-award The IDIQ drew 4 offers | 26 | Apr 16, 2024 |
| W912CN21D0022 | Multiple-award The IDIQ drew 12 offers | 25 | Aug 31, 2026 |
| W912CN21D0025 | Multiple-award The IDIQ drew 12 offers | 14 | Aug 31, 2026 |
Other trades from this office
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.