Contractor · based in California
Amg Construction Company, Incorporated: federal contracts won
UEI LN42KVQUMX58
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Typical award won (median)
$81,338
The middle of 11 priced awards, FY2021–FY2025. Half were between $58.1k and $153k.
Typical bids faced
4
Median bids per award, reported for 11 of 11 competed awards. 0% drew only one bid.
Won as a small business
100%
Share of the 11 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Amg Construction Company, Incorporated was $81.3k (FY2021-FY2025, 11 priced awards).
- That is 54% higher than the median for all construction & facilities work nationwide ($52.8k).
- Competed awards drew a median of 4 offers (reported for 11 of 11).
- 0% of competed awards drew only one offer.
- Its most frequent buyer was USDA ARS PWA AAO Acquisition/Personal Property (3 priced awards in FY2021-FY2025).
- Tip 91% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work near you
Includes competitor tracking: follow Amg Construction Company, Incorporated and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 3 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 2 | – |
| FY2017 | 0 | – |
| FY2018 | 3 | – |
| FY2019 | 3 | – |
| FY2020 | 2 | – |
| FY2021 | 2 | – |
| FY2022 | 1 | – |
| FY2023 | 1 | – |
| FY2024 | 4 | – |
| FY2025 | 3 | – |
| FY2026 (provisional) | 2 | – |
Award sizes
- Holds the median award, $81,338
Recent awards won
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Sep 18, 2026 | Cold Storage Refrigeration Systems 1232SA26P0784 on USAspending (opens in a new tab) Provisional | $87,300 | 8 | Competed Small business |
| Sep 16, 2026 | Replacement of Greenhouse Environmental Control System 1232SA26P0735 on USAspending (opens in a new tab) Provisional | $82,400 | 6 | Competed Small business |
| Sep 17, 2025 | Replace Seed Chiller HVAC Units at Lake Mead National Recreation Area, NV 140P8125P0048 on USAspending (opens in a new tab) | $209,888 | 5 | Competed Small business |
| Jul 25, 2025 | FY25 Shiloh - Replace Fixtures and Tile in Restroom 140P5225C0008 on USAspending (opens in a new tab) | $88,855 | 5 | Competed Small business |
| Mar 10, 2025 | VA-Div AC Unit Purchase and Install 140FGA25P0008 on USAspending (opens in a new tab) | $9,138 | 2 | Competed Small business |
| Sep 27, 2024 | Maintenance Building Window Replacement at Youghiogheny River Lake W911WN24P8006 on USAspending (opens in a new tab) | $81,338 | 6 | Competed Small business |
| Apr 11, 2024 | This Contract Is for Construction Services Located at Pipestone National Monument for Collections Storage Rehab. 140P6324C0007 on USAspending (opens in a new tab) | $417,450 | 2 | Competed Open to all |
| Apr 1, 2024 | AZ San Bernardino NWR Shade Structure 140FC124P0023 on USAspending (opens in a new tab) | $44,000 | 9 | Competed Small business |
| Mar 25, 2024 | VA-FWS Div Assemble/Install Prefab Metal Building & Concrete Pad 140FC124P0022 on USAspending (opens in a new tab) | $79,350 | 4 | Competed Small business |
| Sep 13, 2023 | Construct and Install a 48X30X13 Pre-Engineered Metal Building for Farm Equipment Storage 12905B23P0264 on USAspending (opens in a new tab) | $72,283 | 11 | Competed Small business |
| Sep 15, 2022 | Booster Pump Replacement 12905B22P0288 on USAspending (opens in a new tab) | $23,442 | 3 | Competed Small business |
| Jul 28, 2022 | Replace Chipped, Cracked, and Loose Tile in the Restrooms Listed in Attached SOW 0 on Hand 16.0 15DDHQ22P00000609 on USAspending (opens in a new tab) Equipment purchase | $137,440 | 1 | Not competed Open to all |
| Sep 15, 2021 | MN-Replace Fishing and Canoe Launch Platforms 140F0221P0099 on USAspending (opens in a new tab) | $95,241 | 4 | Competed Small business |
| Aug 17, 2021 | Covered Open Storage for Turf Management Research Equipment 12905B21P0232 on USAspending (opens in a new tab) | $214,775 | 4 | Competed Small business |
| Sep 24, 2020 | 2540 D6 ENG South Asbestos Abatement and Remodel 12837120C0113 on USAspending (opens in a new tab) | $86,388 | 4 | Competed Small business |
| Sep 8, 2020 | CA VC Lighting Repairs/Retrofit 140F0120P0231 on USAspending (opens in a new tab) | $26,050 | 3 | Competed Small business |
| Sep 11, 2019 | Specialized Services Group Electrical Improvements 12FPC119P0245 on USAspending (opens in a new tab) | $38,200 | 7 | Competed Open to all |
| Aug 16, 2019 | FY19 NBG Powerhouse Windows R&R W912QR19P0105 on USAspending (opens in a new tab) | $96,200 | 3 | Competed Small business |
| May 2, 2019 | Cooling System 140G0119P0142 on USAspending (opens in a new tab) | $89,700 | 5 | Competed Small business |
| Sep 19, 2018 | The U.S. Geological Survey, So Conte Research Center, Located in Turners Falls, MA, 01376, Has a Need to Replace a Carbon Filter Tank System Located in the Wet Lab. Requirements Are Specified in the Statement of Work Section B.2. Attachment 1 Contains Site Photos for Reference. This Is a Fixed Price Contract. Work Is to Be Completed Within a Sixty (60) Day Performance Period. A Site Visit Is… 140G0118P0387 on USAspending (opens in a new tab) | $44,250 | 8 | Competed Small business |
| Aug 21, 2018 | Roofing and Building Repairs Plant Materials Center (PMC), Americus, Georgia 12SPEC18P0044 on USAspending (opens in a new tab) | $86,150 | 5 | Competed Small business |
| Jun 22, 2018 | The Contractor Shall Furnish All Labor, Materials, Equipment, and Supervision Required to Complete Various Renovations for the Main Office, Seed Lab and Garage at La Plant Materials Center (PMC), Kingsville, Texas As Detailed in the Attachment 1, Statement of Work. 12SPEC18P0027 on USAspending (opens in a new tab) | $110,000 | 10 | Competed Small business |
| Sep 27, 2016 | Install Primary Power W912BV16P0135 on USAspending (opens in a new tab) | $95,520 | 4 | Competed Small business |
| Sep 20, 2016 | Pond Cleanout INF16PX02746 on USAspending (opens in a new tab) Cancelled / $0 | $89,700 | 4 | Competed Small business |
| Sep 9, 2016 | Renovation: Manhattan PMC Office. Location, Manhattan, KS 66502. See Attached Description/Specifications/Work Statement for Project Details. AG3C78C160028 on USAspending (opens in a new tab) | $69,800 | 3 | Competed Small business |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Competed 11 (100%)
A standalone contract that was open to bids.
Set-asides
Set-aside = reserved for a group of businesses.
- Small business 10 (91%)
Only small businesses could bid.
- Open to all 1 (9%)
No set-aside: any size of business could bid.
Left out of the numbers above: 1 equipment purchase. Why?
Similar contractors
- California Constructors
- Corbara Building Group Corporation
- Durable Good-Men JV, LLC
- FS3, Inc.
- Herman/JCG Co JV
- Spectrum Services Group Inc
- Anchor-41 Construction LLC
- Laura Kay Dunbar, Inc.
- North Star Construction & Engineering Inc
- Peter Vander Werff Construction, Inc.
- Thunder Incorporated
- Trinity North Star JV
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.