Contractor · based in Texas
Callan Marine Limited: federal contracts won
UEI R1LWVNNVFPD7
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Typical award won (median)
$29,029,815
The middle of 7 priced awards, FY2021–FY2025.
Typical bids faced
3
Median bids per award, reported for 7 of 7 competed awards.
Won as a small business
–
Not enough priced awards to show a share.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Callan Marine Limited was $29M (FY2021-FY2025, 7 priced awards).
- Competed awards drew a median of 3 offers (reported for 7 of 7).
- Its most frequent buyer was USACE Galveston District (6 priced awards in FY2021-FY2025).
FedComps Pro · coming soon · free waitlist
Get alerts for new heavy & civil work near you
Includes competitor tracking: follow Callan Marine Limited and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: no awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2018 | 1 | – |
| FY2019 | 1 | – |
| FY2020 | 4 | – |
| FY2021 | 0 | – |
| FY2022 | 0 | – |
| FY2023 | 5 | $29,029,815 |
| FY2024 | 2 | – |
| FY2025 | 0 | – |
| FY2026 (provisional) | 1 | – |
Award sizes
- Holds the median award, $29,029,815
Recent awards won
The latest 14 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Nov 20, 2025 | Maintenance Dredging and Advanced Maintenance Dredging of Channel to Port Mansfield with Beneficial Use Placement. W912HY26CA001 on USAspending (opens in a new tab) | $21,420,562 | 4 | Competed Open to all |
| Sep 27, 2024 | FY24 USACE Galveston District, GIWW, High Island to Causeway Maintenance Dredging, Galveston and Chambers County, Texas W912HY24C0011 on USAspending (opens in a new tab) | $6,998,750 | 4 | Competed Open to all |
| Aug 6, 2024 | Dredging - Brazos Island Harbor Channel Deepening Phase II. Cameron County, Texas W912HY24C0005 on USAspending (opens in a new tab) Unusually large | $104,974,200 | 3 | Competed Open to all |
| Sep 29, 2023 | FY23 Gulf Intracoastal Waterway, Texas, West Galveston Bay Barrier Island Reconstruction Project, Pipeline Dredging in Galveston, Texas W912HY23C0023 on USAspending (opens in a new tab) | $29,029,815 | 2 | Competed Open to all |
| Sep 25, 2023 | Pipeline Dredging of Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Texas, Dredging. W912HY23C0019 on USAspending (opens in a new tab) Unusually large | $102,896,306 | 3 | Competed Open to all |
| Aug 18, 2023 | Dune and Beach Sand Fill W912P823C0043 on USAspending (opens in a new tab) | $48,358,100 | 3 | Competed Open to all |
| May 8, 2023 | FY23 USACE Galveston District, Galveston Entrance Channel and HSC Bolivar Hopper Dredging Galveston Harbor and Houston Ship Channel, Galveston County, Texas. W912HY23C0009 on USAspending (opens in a new tab) | $9,430,000 | 3 | Competed Open to all |
| Dec 21, 2022 | Dredging Houston Ship Channel W912HY23C0002 on USAspending (opens in a new tab) | $13,845,450 | 5 | Competed Open to all |
| Sep 28, 2020 | Unrestricted Procurement, Gulf Intracoastal Waterway, Texas, Rollover to Causeway and Bolivar Flare in Galveston and Chambers Counties, Texas, Pipeline Dredging. W912HY20C0037 on USAspending (opens in a new tab) | $8,105,300 | 2 | Competed Open to all |
| Apr 30, 2020 | Minimum Guarantee for Pipeline MATOC for Unanticipated Shoaling Along TX Coast W912HY20F0033 on USAspending (opens in a new tab) | $3,000 | 1 | Order (multiple-award IDIQ) Open to all |
| Apr 8, 2020 | Deep Draft Dredging of the Corpus Christi Ship Channel, Texas Channel Improvement Project Lower Bay Reach from STA. 7+000 (Formally STA. 70+00), Just Bay Side of the Port Aransas Ferry Landing Extending to STA. 70+000 (Formally STA. 700+00). W912HY20C0009 on USAspending (opens in a new tab) Unusually large | $97,925,240 | 3 | Competed Open to all |
| Apr 6, 2020 | North Breton Island Restoration 140F0420C0005 on USAspending (opens in a new tab) | $54,419,550 | 3 | Competed Open to all |
| May 10, 2019 | Base Year W912EP19F0149 on USAspending (opens in a new tab) | $2,000 | 1 | Order (multiple-award IDIQ) Open to all |
| Sep 28, 2018 | CT: Cutter Head Pipeline Shallow Draft Dredging Along the Gulf Intracoastal Waterway (GIWW), Freeport to Upper Matagorda Bay, Texas and Channel to Palacios, Texas, and San River Channel, Texas, and Colorado River Channel, Texas, in Brazoria, Matagorda, and Calhoun Counties, Texas W9126G18C0120 on USAspending (opens in a new tab) | $6,375,000 | 6 | Competed Open to all |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Competed 7 (100%)
A standalone contract that was open to bids.
Set-asides
Set-aside = reserved for a group of businesses.
- Open to all 7 (100%)
No set-aside: any size of business could bid.
Who they work for
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.