Contractor · based in Florida

Chrome Electric, LLC: federal contracts won

UEI F9YFDP7QVMT7

Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Sep 21, 2026. Data status

Typical award won (median)

$55,255

The middle of 15 priced awards, FY2021–FY2025. Half were between $46k and $93k.

Typical bids faced

2

Median bids per award, reported for 15 of 15 competed awards. 7% drew only one bid.

Won as a small business

100%

Share of the 15 priced awards.

Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.

What this means

  • The middle construction & facilities award won by Chrome Electric, LLC was $55.3k (FY2021-FY2025, 15 priced awards).
  • That is close to the median for all construction & facilities work nationwide ($52.8k).
  • Competed awards drew a median of 2 offers (reported for 15 of 15).
  • 7% of competed awards drew only one offer.
  • Its most frequent buyer was NASA Kennedy Space Center (15 priced awards in FY2021-FY2025).
  • Tip 100% of these awards were task orders under multiple-award contracts (MATOCs). To compete for those, you first need a spot on one of the umbrella contracts.
  • Tip The typical award drew only 2 bids. Less competition can mean a better chance for a new bidder.

FedComps Pro · coming soon · free waitlist

Get alerts for new electrical work near you

Includes competitor tracking: follow Chrome Electric, LLC and the other companies you bid against.

  • Alerts that say if a bid is worth it
  • Deadline and amendment alerts
  • Recompete radar
  • Plain-English bid summaries
  • Competitor tracking
  • Unlimited saved searches

Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing

Your sign-up did not go through. Please check your email and ZIP code and try again. The spam check needs JavaScript turned on.

Add your company (optional)

We only email you about the launch. Delete your details any time.

Awards per year

Column chart of awards per fiscal year, FY2016 to FY2026. FY2025, the latest full year: 1 award. Most in one year: 6 awards in FY2023. FY2026 is still being reported. 0 2 4 6 2016 ’16 2017 ’17 2018 ’18 2019 ’19 2020 ’20 2021 ’21 2022 ’22 2023 ’23 2024 ’24 1 2025 ’25 2026 ’26
  • FY2025, the latest full year: 1 award
  • FY2026 is still being reported
Federal fiscal years run October to September.
Show the numbers
YearAwardsMedian award
FY2016 1 –
FY2017 1 –
FY2018 0 –
FY2019 1 –
FY2020 1 –
FY2021 2 –
FY2022 2 –
FY2023 6 $57,326
FY2024 4 –
FY2025 1 –
FY2026 (provisional) 0 –

Award sizes

Bar chart of priced awards FY2021–FY2025 by size. The most common size was $25k to $250k (14 awards). The median award, $55,255, is in the $25k to $250k band. Under $25k 1 $25k to $250k 14 $250k to $1M 0 $1M to $5M 0 $5M to $25M 0 Over $25M 0
  • Holds the median award, $55,255
Priced awards FY2021–FY2025, by value at award.

Recent awards won

The latest 19 awards, newest first. Each contract number opens its official record on USAspending.gov.

Project How it was awarded
May 15, 2025 Electrical Blanket Purchase Agreement Call to Perform Vehicle Assembly Building Lighting and Power Modification at Kennedy Space Center, Florida. 80KSC025FA057 on USAspending (opens in a new tab) $113,900 5 Order (multiple-award IDIQ) Open to all
May 15, 2024 PCN99776 Replace Broken Light and Pole in Northwest (NW) Parking Lot of Pad-B Building (J7-0689) & Vehicle Assembly Building West Parking Lot (K6 0848). 80KSC024FA061 on USAspending (opens in a new tab) $72,102 6 Order (multiple-award IDIQ) Small business
May 15, 2024 PCN99777 Restore Power to P6-1382 and Install 75KVA Transformer to Pole 99-6 Athletic, Recreation and Social 80KSC024FA062 on USAspending (opens in a new tab) $61,868 6 Order (multiple-award IDIQ) Small business
Feb 26, 2024 Hanger Ae Server Room Panel at Kennedy Space Center (KSC), FL 80KSC024F0016 on USAspending (opens in a new tab) $46,700 2 Order (multiple-award IDIQ) Open to all
Dec 6, 2023 Vehicle Assembly Building 26TH Floor LED Lighting, Kennedy Space Center. 80KSC024F0003 on USAspending (opens in a new tab) $50,800 2 Order (multiple-award IDIQ) Open to all
Sep 26, 2023 Install Flush Mounted Receptacles in Vehicle Assembly Building Rooms 3N1 and 3N8, Kennedy Space Center. 80KSC023F0094 on USAspending (opens in a new tab) $55,255 2 Order (multiple-award IDIQ) Open to all
Jul 12, 2023 120V Power Receptacles & LED Lighting for Ignition Over Pressure and Sound Suppression Valve Complex at Pad B. 80KSC023F0055 on USAspending (opens in a new tab) $59,396 3 Order (multiple-award IDIQ) Open to all
Jun 28, 2023 Science Annex (M7-0411) 150KW/480V Power Generator & Start-Up at Kennedy Space Center. 80KSC023F0051 on USAspending (opens in a new tab) $149,700 2 Order (multiple-award IDIQ) Open to all
Mar 22, 2023 Repair/Replace Wooden Light Poles Due Damage at M7-1354 and M7-1357 at Kennedy Space Center (KSC). 80KSC023F0031 on USAspending (opens in a new tab) $30,435 2 Order (multiple-award IDIQ) Open to all
Feb 28, 2023 Facility Power Modifications at Kennedy Space Center (KSC), FL 80KSC023F0024 on USAspending (opens in a new tab) $23,500 3 Order (multiple-award IDIQ) Open to all
Dec 13, 2022 Replace Space Station Processing Facility Generator Tap Box with New Switches and Feeder Conduit. 80KSC023F0015 on USAspending (opens in a new tab) $225,450 2 Order (multiple-award IDIQ) Open to all
Sep 29, 2022 1 Electrical Panel Upgrades at Kennedy Space Center. 80KSC022F0086 on USAspending (opens in a new tab) $158,973 1 Order (multiple-award IDIQ) Open to all
Aug 25, 2022 Task 1 Vehicle Assembly Building 28TH Floor Lighting a Tower & 25TH Floor Lighting Tower. 80KSC022F0057 on USAspending (opens in a new tab) $45,430 2 Order (multiple-award IDIQ) Open to all
Sep 3, 2021 Vehicle Assembly Building Transfer Switch Removal, Project Control Number (PCN) 99749 80KSC021F0177 on USAspending (opens in a new tab) $46,525 2 Order (multiple-award IDIQ) Open to all
Mar 12, 2021 Replace Transformer at Space Station Processing Facility for AUX. Back-Up Chillers. 80KSC021F0067 on USAspending (opens in a new tab) $35,675 2 Order (multiple-award IDIQ) Open to all
Dec 30, 2019 High-Bay 4 Remove and Install New LED, PCN: 99734. 80KSC020F0025 on USAspending (opens in a new tab) $56,736 7 Order (multiple-award IDIQ) Open to all
Mar 1, 2019 Install Two New 4/0 Grounds and Welds on Camera Pad 6, PCN: 99713 Period of Performance: March 1, 2019 - April 1, 2019 80KSC019F0300 on USAspending (opens in a new tab) $4,086 7 Order (multiple-award IDIQ) Small business
Jul 21, 2017 7514562 Construction Project at STA Cape Canaveral to Repair/Replace All Aged Exterior Area and Roadway Lights. HSCG8217CPMV214 on USAspending (opens in a new tab) $259,731 12 Competed Small business
Jul 20, 2016 Construction Contract: Replace and Install Light Emitting Diode (LED) Lighting in Various Buildings Throughout Kennedy Space Center. NNK16EA17C on USAspending (opens in a new tab) $1,427,629 12 Competed Small business

Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.

How the work was bought

Competition

Was the work open to bids?

  • Order (multiple-award IDIQ) 15 (100%)

    A task order placed under an IDIQ held by several companies, who competed for it.

Set-asides

Set-aside = reserved for a group of businesses.

  • Open to all 13 (87%)

    No set-aside: any size of business could bid.

  • Small business 2 (13%)

    Only small businesses could bid.

Umbrella contracts used here

Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.

Contract Type Orders Ordering ends
80KSC019A0004 Multiple-award 12 May 15, 2024
80KSC024AA004 Multiple-award 3 May 14, 2029
Report an error on this page

Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.