Contractor · based in Florida
Urban Electric, Inc: federal contracts won
UEI C4DSLZNYMPV3
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Sep 21, 2026. Data status
Typical award won (median)
$211,166
The middle of 134 priced awards, FY2021–FY2025. Half were between $67.3k and $252k.
Typical bids faced
6
Median bids per award, reported for 134 of 134 competed awards. 22% drew only one bid.
Won as a small business
100%
Share of the 134 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Urban Electric, Inc was $211k (FY2021-FY2025, 134 priced awards).
- That is 4.0 times the median for all construction & facilities work nationwide ($52.8k).
- Competed awards drew a median of 6 offers (reported for 134 of 134).
- 22% of competed awards drew only one offer.
- In FY2025 the middle award was $93.1k, down 56% from FY2024 ($213k).
- Tip 100% of these awards were task orders under multiple-award contracts (MATOCs). To compete for those, you first need a spot on one of the umbrella contracts.
FedComps Pro · coming soon · free waitlist
Get alerts for new electrical work near you
Includes competitor tracking: follow Urban Electric, Inc and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 10 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 6 | $14,200 |
| FY2017 | 16 | $4,944 |
| FY2018 | 29 | $5,092 |
| FY2019 | 32 | $5,245 |
| FY2020 | 23 | $14,402 |
| FY2021 | 13 | $14,402 |
| FY2022 | 41 | $211,166 |
| FY2023 | 38 | $225,748 |
| FY2024 | 32 | $213,486 |
| FY2025 | 10 | $93,056 |
| FY2026 (provisional) | 9 | $291,695 |
Award sizes
- Holds the median award, $211,166
Recent awards won
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Aug 18, 2026 | Critical Power Distribution System Design for Minneapolis MN ATCT MSP: 1800006 6973GH26F01287 on USAspending (opens in a new tab) | $291,695 | 1 | Order (multiple-award IDIQ) Open to all |
| Jul 20, 2026 | IIJA Funds. 2025 Propane Baseline Installation per Attached SOW, Approved Design Drawings at Fresno, CA ATCT: 1501845 6973GH26F01098 on USAspending (opens in a new tab) | $125,091 | 8 | Order (multiple-award IDIQ) Open to all |
| Jul 20, 2026 | Eg Funded. Site Survey Travel, Report and Design for the 2025 Outdoor Eg Baseline at Nashville, TN ATCT: 235969 6973GH26F01107 on USAspending (opens in a new tab) | $34,983 | 8 | Order (multiple-award IDIQ) Open to all |
| Jun 25, 2026 | Tower Simulator System (TSS) Standalone Simulation System 697DCK26C00144 on USAspending (opens in a new tab) | $5,100,000 | 1 | Not competed Open to all |
| Jun 17, 2026 | Internet Protocol Voice Communication Systems 697DCK26C00154 on USAspending (opens in a new tab) | $1,200,000 | 1 | Not competed Open to all |
| Apr 29, 2026 | (IIJA) Funded Design and Modernization Install Project Multiple Sites: ASR, Maxwell AFB, AL, 23000763 (ATL)ASR, Atlanta, GA, 23000713 ASR, Buford, GA, 23000757 6973GH26F00723 on USAspending (opens in a new tab) | $436,474 | 1 | Order (multiple-award IDIQ) Open to all |
| Apr 2, 2026 | IIJA and F&E Funded Modernization Installation Project at Multiple Locations in Sanford, FL (Local Implementation) Sanford, FL GS 26000718, LOC 26002138, 26000717, GS 26000719, LOC 26000527, 2600072 6973GH26F00594 on USAspending (opens in a new tab) | $209,009 | 1 | Order (multiple-award IDIQ) Open to all |
| Mar 23, 2026 | Tower Simulator System (TSS) Standalone Simulation System 697DCK26C00086 on USAspending (opens in a new tab) | $780,825 | 1 | Not competed Open to all |
| Feb 9, 2026 | Site Survey, Report and Design Funding for Power System Replacement Projects at West Mesa, NM (QSA) ARSR: 19007421 6973GH26F00378 on USAspending (opens in a new tab) | $33,347 | 8 | Order (multiple-award IDIQ) Open to all |
| Sep 5, 2025 | Site Survey and Design for the 2025 Outdoor Eg Baseline at Agana, GU RTR: 22002410 6973GH25F01306 on USAspending (opens in a new tab) Cancelled / $0 | $39,073 | 9 | Order (multiple-award IDIQ) Open to all |
| Sep 5, 2025 | Site Survey and Design for Eg LED Power System Replacement Oahu Waimanalo, HI: 235985 6973GH25F01310 on USAspending (opens in a new tab) | $35,198 | 9 | Order (multiple-award IDIQ) Open to all |
| Apr 3, 2025 | (IIJA) Funded Site Survey and Travel, Site Specific: Battle Mountain, NV ARSR, 19004378, PMO. 6973GH25F00690 on USAspending (opens in a new tab) | $5,775 | 1 | Order (multiple-award IDIQ) Open to all |
| Jan 17, 2025 | BIL Funded Site Specific: Daytona Beach, FL (DAB)ASR-9 Upgrade Install: 22009420 6973GH25F00366 on USAspending (opens in a new tab) | $118,900 | 1 | Order (multiple-award IDIQ) Open to all |
| Jan 16, 2025 | Site Survey & Design for Power System Replacement at Mary's Peak: 22000596 6973GH25F00377 on USAspending (opens in a new tab) | $34,129 | 9 | Order (multiple-award IDIQ) Open to all |
| Jan 8, 2025 | BIL Funds, 2024 Outdoor Eg with Subbase Tank Site Survey/Design/Install for Wichita, KS ALS: 19005988 6973GH25F00337 on USAspending (opens in a new tab) | $360,753 | 8 | Order (multiple-award IDIQ) Open to all |
| Jan 2, 2025 | BIL Funds Site Specific Upgrade Installation at Daytona Beach, FL (DAB) ATCT: 24017065 (Old 18064951) 6973GH25F00306 on USAspending (opens in a new tab) | $59,418 | 1 | Order (multiple-award IDIQ) Open to all |
| Jan 2, 2025 | (BIL) Funded Site Specific: Orlando, FL (MCO) ASR-9 Installation: 23000758 6973GH25F00334 on USAspending (opens in a new tab) Cancelled / $0 | $91,967 | 1 | Order (multiple-award IDIQ) Open to all |
| Dec 27, 2024 | (BIL) and (IIJA) Funds Site Specific: Sarasota, FL, ASR-9 Upgrade Installation: 23000770 6973GH25F00270 on USAspending (opens in a new tab) | $67,211 | 1 | Order (multiple-award IDIQ) Open to all |
| Dec 27, 2024 | (BIL) and (IIJA) Funds Site Specific: Ft. Lauderdale, FL (FLL) ASR-9 Installation Upgrade: 22009429 6973GH25F00284 on USAspending (opens in a new tab) | $149,969 | 1 | Order (multiple-award IDIQ) Open to all |
| Dec 20, 2024 | Issue Funding for Site Survey, Design, and Installation of Diesel FST at DAL-Ft Worth, TX ALS, 22009439 6973GH25F00300 on USAspending (opens in a new tab) | $214,697 | 10 | Order (multiple-award IDIQ) Open to all |
| Dec 19, 2024 | Issue Funding for Site Survey, Design, and Installation of Diesel FST, 1503559 6973GH25F00288 on USAspending (opens in a new tab) | $214,697 | 8 | Order (multiple-award IDIQ) Open to all |
| Sep 6, 2024 | Issue Funding for Site Survey, Design, and Installation of Diesel FST at Fort Yukon, AK BLDG, 1501870 6973GH24F01457 on USAspending (opens in a new tab) | $218,245 | 8 | Order (multiple-award IDIQ) Open to all |
| Sep 4, 2024 | Issue Funding for Site Survey and Design of Outdoor Eg with Subbase Tank and at East Meadow, NY QC3, 22008444 6973GH24F01411 on USAspending (opens in a new tab) Cancelled / $0 | $34,524 | 8 | Order (multiple-award IDIQ) Open to all |
| Sep 4, 2024 | BIL: Conduct Installation of Diesel FST per Attached SOW, Approved Design Drawings, and Baseline Cost Proposal at East Boston, Ma (BOSC) ALS, 1502971 6973GH24F01414 on USAspending (opens in a new tab) | $198,006 | 9 | Order (multiple-award IDIQ) Open to all |
| Aug 29, 2024 | Issue Funding for Site Survey, Design, and Installation of Diesel FST at Lincolnton, Ga ARSR, 22007812 6973GH24F01387 on USAspending (opens in a new tab) | $214,697 | 9 | Order (multiple-award IDIQ) Open to all |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Order (multiple-award IDIQ) 134 (100%)
A task order placed under an IDIQ held by several companies, who competed for it.
Set-asides
Set-aside = reserved for a group of businesses.
- Open to all 132 (99%)
No set-aside: any size of business could bid.
- Small business 2 (1%)
Only small businesses could bid.
Left out of the numbers above: 10 cancelled or $0 awards. Why?
Who they work for
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| 6973GH22D00016 | Multiple-award The IDIQ drew 15 offers | 121 | Oct 31, 2026 |
| DTFAAC16D00018 | Multiple-award The IDIQ drew 18 offers | 13 | May 3, 2021 |
Contracts ending soon
Recurring work whose current contract ends within 18 months, so the agency will likely buy it again (a "recompete"). The company doing it today is the incumbent.
-
Ordering period ends Oct 31, 2026
PSG IDIQ Contract for Site Survey, Design and Installation
Incumbent: Urban Electric, Inc Buyer: Franchise Acquisition Services
6973GH22D00016 on USAspending (opens in a new tab)
Similar contractors
- Kik Technologies LLC
- Electric Solutions Unlimited, LLC
- Abar Technology Group Corp
- Chrome Electric, LLC
- Eau Gallie Electric, Inc.
- Miller Electric Co
- Santa Fe Power Solutions Inc
- Omegatech Communication Services LLC
- Superior Skilled Trades LLC
- Infinity Datacom Solutions LLC
- Intranet Communications Group, Inc.
- 2 Teks Communication, Inc.
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.