Contractor · based in Colorado
Front Range Construction Inc: federal contracts won
UEI UFNYGJ2528F8
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Typical award won (median)
$166,063
The middle of 32 priced awards, FY2021–FY2025. Half were between $41.4k and $684k.
Typical bids faced
2
Median bids per award, reported for 12 of 12 competed awards. 17% drew only one bid.
Won as a small business
100%
Share of the 32 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Front Range Construction Inc was $166k (FY2021-FY2025, 32 priced awards).
- That is 3.1 times the median for all construction & facilities work nationwide ($52.8k).
- Competed awards drew a median of 2 offers (reported for 12 of 12).
- 17% of competed awards drew only one offer.
- Its most frequent buyer was Department of Commerce NIST (19 priced awards in FY2021-FY2025).
- Tip 94% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
- Tip The typical award drew only 2 bids. Less competition can mean a better chance for a new bidder.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work near you
Includes competitor tracking: follow Front Range Construction Inc and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 4 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 9 | $119,929 |
| FY2017 | 5 | $224,131 |
| FY2018 | 6 | $132,118 |
| FY2019 | 5 | $472,732 |
| FY2020 | 8 | $180,496 |
| FY2021 | 8 | $183,518 |
| FY2022 | 6 | $196,189 |
| FY2023 | 9 | $152,127 |
| FY2024 | 5 | $41,653 |
| FY2025 | 4 | – |
| FY2026 (provisional) | 4 | – |
Award sizes
- Holds the median award, $166,063
Recent awards won
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Aug 28, 2026 | OU19-FY26-098-NEW Site Safety Shower and Eyewash Corrections (Phase 1), NIST, Boulder, CO 1333ND26CNB190022 on USAspending (opens in a new tab) Provisional | $600,905 | 6 | Competed Small business |
| Aug 21, 2026 | OU19-FY26-212-NEW Construction for Building 26 Hot Water Recirculation Line and Building 111 Hot Water Heater Removal and Installation. 1333ND26CNB190019 on USAspending (opens in a new tab) Provisional | $111,896 | 2 | Competed Small business |
| Aug 21, 2026 | OU19-FY26-377-NEW Steam Tunnel Ventilation, NIST, Boulder, CO 1333ND26CNB190020 on USAspending (opens in a new tab) Provisional | $522,730 | 3 | Competed Small business |
| Aug 20, 2026 | General Construction Services 2 FRP Over Lab Replacement 75D30126C21374 on USAspending (opens in a new tab) Provisional | $1,054,550 | 2 | Competed HUBZone |
| Oct 17, 2025 | Replace the Two (2) Existing Chilled Water Fed Air Computer Room Air Conditioners with Two (2) 20 Ton Liebert DS Direct Exchange Units or Vendor Equivalent for the Department of State at Building 810 of the Denver Federal Center. 47PJ0026C0001 on USAspending (opens in a new tab) Equipment purchase | $1,048,338 | 1 | Not competed 8(a) |
| Sep 25, 2025 | The Existing Surge Tank (Cleaver Brooks 1400) Was Part of Phase 1 Completed in 2006 and As Such, Is Nearing End of Its Life Cycle and Is Incurring Increasingly Cost Consuming Maintenance Due to Leaks and Corrosion. Due to the Age of the Tank 75D30125C00264 on USAspending (opens in a new tab) Equipment purchase | $605,730 | 1 | Not competed Open to all |
| Sep 16, 2025 | Assemble and Manage the Team Necessary to Demolish and Dispose of the Existing FAR-006 Exhaust Fan and Associated Such That a New FAR-006 Exhaust Fan and Associated Specified and Supplied to Match the Existing FAR-006 System 75D30125C00262 on USAspending (opens in a new tab) Equipment purchase | $375,309 | 1 | Not competed Open to all |
| Sep 3, 2025 | Auto Window Shades, Ft Collins, CO 75D30125C20636 on USAspending (opens in a new tab) | $373,975 | 1 | Not competed 8(a) |
| Aug 27, 2025 | OU19-25-NEW-379 Building 2 Backflow Preventer Replacement 1333ND25CNB190023 on USAspending (opens in a new tab) | $81,429 | 1 | Not competed 8(a) |
| Aug 7, 2025 | OU19-25-NEW-273 Construction Services - Isolation of Utilities - Building 1 Wing 4 1333ND25CNB190016 on USAspending (opens in a new tab) | $260,597 | 1 | Not competed 8(a) |
| Oct 30, 2024 | Design and Construction Services, Which Includes Engineering Analysis of Existing Building Conditions, and the Construction of the Approved Design Plans, for Room 8110, Building 810, Denver Federal Center, Lakewood Colorado 47PJ0025C0003 on USAspending (opens in a new tab) | $973,879 | 1 | Not competed 8(a) |
| Sep 5, 2024 | Preventative Maintenance and Repair to Building Chillers at Western Area Power Administration, Rocky Mountain Region, Loveland, Colorado 89503224PWA000504 on USAspending (opens in a new tab) | $41,653 | 1 | Not competed 8(a) |
| Aug 12, 2024 | Replacement of Main Water Valve in Building 81 1333ND24PNB190328 on USAspending (opens in a new tab) | $5,350 | 1 | Competed Open to all |
| Jul 29, 2024 | B26 Find and Repair Water Main Leak 1333ND24PNB190298 on USAspending (opens in a new tab) | $95,000 | 1 | Not competed 8(a) |
| May 8, 2024 | Building 1 Wing 5 Levels 2 and 3 Laboratory Construction Renovations 1333ND24CNB190014 on USAspending (opens in a new tab) | $40,789 | 1 | Not competed 8(a) |
| Jan 18, 2024 | Replace Boilers and Pumps, Building 2, Animal Research Building, National Wildlife Research Center, Fort Collins 12639524C0024 on USAspending (opens in a new tab) | $378,717 | 1 | Not competed 8(a) |
| Sep 22, 2023 | HVAC Controls Upgrade 89503223CWA000088 on USAspending (opens in a new tab) | $1,383,809 | 1 | Not competed 8(a) |
| Sep 20, 2023 | Repair Site Concrete Slip/Fall Hazards 1333ND23PNB190637 on USAspending (opens in a new tab) | $209,909 | 1 | Not competed 8(a) |
| Jul 20, 2023 | Domestic Water Valve Replacement. 1333ND23FNB190182 on USAspending (opens in a new tab) | $587,296 | 2 | Order (multiple-award IDIQ) 8(a) |
| Jul 11, 2023 | Central Utility Plant (Cup) Loading Dock 1333ND23FNB190164 on USAspending (opens in a new tab) | $75,462 | 2 | Order (multiple-award IDIQ) 8(a) |
| Jun 29, 2023 | Construction Services to Repair Steam/Sprinkler Pipe at Building 1 Wing 5 at the NIST Boulder, Co Campus. 1333ND23FNB190154 on USAspending (opens in a new tab) | $8,507 | 1 | Order (multiple-award IDIQ) 8(a) |
| May 11, 2023 | Building 2 Westside Lawn & Parking Lot Water Leak 1333ND23CNB190021 on USAspending (opens in a new tab) | $148,325 | 1 | Not competed 8(a) |
| Jan 6, 2023 | Replacement of Boiler System, National Wildlife Research Center, Fort Collins 12639523P0030 on USAspending (opens in a new tab) | $152,127 | 1 | Not competed 8(a) |
| Dec 27, 2022 | Boiler Replacement at FCC Florence 15BFA023C00000005 on USAspending (opens in a new tab) | $4,694,149 | 2 | Competed Small business |
| Dec 21, 2022 | Repair of Water Service Valves Serving BLDGS 111 and 3A 1333ND23PNB190040 on USAspending (opens in a new tab) | $39,332 | 1 | Not competed 8(a) |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Not competed 20 (63%)
Sole-source: only one company was asked.
- Order (multiple-award IDIQ) 8 (25%)
A task order placed under an IDIQ held by several companies, who competed for it.
- Competed 4 (13%)
A standalone contract that was open to bids.
Set-asides
Set-aside = reserved for a group of businesses.
- 8(a) 27 (84%)
Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.
- Small business 3 (9%)
Only small businesses could bid.
- Open to all 2 (6%)
No set-aside: any size of business could bid.
Left out of the numbers above: 2 equipment purchases. Why?
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| 1333ND18DNB190004 | Multiple-award The IDIQ drew 13 offers | 8 | Jan 19, 2024 |
Similar contractors
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.