Contractor · based in Arkansas

Koontz Electric Company, Incorporated: federal contracts won

UEI F8ESZW6XDMJ5

Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status

Typical award won (median)

$5,631,437

The middle of 7 priced awards, FY2021–FY2025.

Typical bids faced

2

Median bids per award, reported for 7 of 7 competed awards.

Won as a small business

–

Not enough priced awards to show a share.

Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.

What this means

  • The middle construction & facilities award won by Koontz Electric Company, Incorporated was $5.6M (FY2021-FY2025, 7 priced awards).
  • Competed awards drew a median of 2 offers (reported for 7 of 7).
  • Its most frequent buyer was USACE Little Rock District (3 priced awards in FY2021-FY2025).
  • Tip The typical award drew only 2 bids. Less competition can mean a better chance for a new bidder.

FedComps Pro · coming soon · free waitlist

Get alerts for new electrical work near you

Includes competitor tracking: follow Koontz Electric Company, Incorporated and the other companies you bid against.

  • Alerts that say if a bid is worth it
  • Deadline and amendment alerts
  • Recompete radar
  • Plain-English bid summaries
  • Competitor tracking
  • Unlimited saved searches

Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing

Your sign-up did not go through. Please check your email and ZIP code and try again. The spam check needs JavaScript turned on.

Add your company (optional)

We only email you about the launch. Delete your details any time.

Awards per year

Column chart of awards per fiscal year, FY2016 to FY2026. FY2025, the latest full year: 2 awards. Most in one year: 4 awards in FY2017. FY2026 is still being reported. 0 1 2 3 4 5 2016 ’16 2017 ’17 2018 ’18 2019 ’19 2020 ’20 2021 ’21 2022 ’22 2023 ’23 2024 ’24 2025 ’25 2026 ’26
  • FY2025, the latest full year: 2 awards
  • FY2026 is still being reported
Federal fiscal years run October to September.
Show the numbers
YearAwardsMedian award
FY2016 2 –
FY2017 4 –
FY2018 4 –
FY2019 2 –
FY2020 0 –
FY2021 2 –
FY2022 1 –
FY2023 1 –
FY2024 1 –
FY2025 2 –
FY2026 (provisional) 0 –

Award sizes

Bar chart of priced awards FY2021–FY2025 by size. The most common size was $5M to $25M (4 awards). The median award, $5,631,437, is in the $5M to $25M band. Under $25k 1 $25k to $250k 0 $250k to $1M 0 $1M to $5M 2 $5M to $25M 4 Over $25M 0
  • Holds the median award, $5,631,437
Priced awards FY2021–FY2025, by value at award.

Recent awards won

The latest 21 awards, newest first. Each contract number opens its official record on USAspending.gov.

Project How it was awarded
Jul 16, 2026 Project Title: Fort Gibson 480V Switchgear Replacement W912BV26CA019 on USAspending (opens in a new tab) Provisional Value after changes $3,861,745 after changes 5 Competed Open to all
Sep 23, 2025 15KV Switchgear Replacement W911XK25CA036 on USAspending (opens in a new tab) $8,230,860 3 Competed Open to all
May 29, 2025 MCC and 480V Switchgear Replacement at Beaver Power Plant in Benton County, Arkansas. Issued Under Electrical Equipment Rehabilitation and Replacement MATOC. Work to Be Complete Within 756 Days of NTP. Dates on Car Are Estimates Only. W9127S25F0071 on USAspending (opens in a new tab) $5,631,437 1 Order (multiple-award IDIQ) Open to all
Aug 5, 2024 Preferred AC Systems Upgrade W912P524C0005 on USAspending (opens in a new tab) $3,013,310 2 Competed Open to all
Oct 7, 2022 Greers Ferry Motor Control Centers/AC-DC W9127S23F0001 on USAspending (opens in a new tab) $6,385,583 2 Order (multiple-award IDIQ) Open to all
Aug 16, 2022 Minimum IDIQ Guarantee W9127822F0252 on USAspending (opens in a new tab) $1,000 1 Order (multiple-award IDIQ) Open to all
May 17, 2021 Norfork Major Rehab: Modernization Electrical Install, Norfork Powerhouse. Pop: 660 Calendar Days from NTP. W9127S21C0004 on USAspending (opens in a new tab) $7,955,558 2 Competed Open to all
Jan 29, 2021 5KV Switchgear W911XK21C0003 on USAspending (opens in a new tab) $2,737,737 3 Competed Open to all
Mar 25, 2019 Installation of Generator Step Up Transformers, 13.8 KV Switchgears, 480VOLT Motor Control Centers, and 15 KV Bus W912BV19C0007 on USAspending (opens in a new tab) $3,997,799 3 Competed Open to all
Dec 10, 2018 NF 480V Switchgear and MCC Replacement W9127S19C0002 on USAspending (opens in a new tab) $1,500,005 4 Competed Open to all
Aug 28, 2018 Generator Breaker Replacement, Bull Shoals Powerhouse W9127S18C0005 on USAspending (opens in a new tab) $2,008,480 2 Competed Open to all
Jun 7, 2018 Ice Harbor Surge and 115KV Disconnects W912EF18C0018 on USAspending (opens in a new tab) $1,750,057 2 Competed Open to all
Jan 19, 2018 Replacement of Essential AC&DC System W9127S18C0001 on USAspending (opens in a new tab) $1,387,553 2 Competed Open to all
Nov 21, 2017 The Dalles Arc Flash Hazard Reduction W9127N18C0008 on USAspending (opens in a new tab) $2,557,755 2 Competed Open to all
Sep 29, 2017 Remove and Replace 125 VDC System W9127S17C0007 on USAspending (opens in a new tab) $764,467 1 Competed Open to all
Mar 30, 2017 Chief Joseph Dam DC Preferred AC Upgrades W912DW17C0003 on USAspending (opens in a new tab) $5,427,724 4 Competed Open to all
Mar 21, 2017 John Day 500KV Disconnect Replacement W9127N17C0006 on USAspending (opens in a new tab) $3,567,764 3 Competed Open to all
Feb 15, 2017 CT: CT Electrical Repair Work at the Colorado and Brazos River Locks W9126G17C0015 on USAspending (opens in a new tab) $867,303 2 Competed Open to all
Sep 28, 2016 The Award Is to Complete the Gate Automation Works at the SOO Locks in the State of Michigan. W911XK16C0023 on USAspending (opens in a new tab) $8,022,694 2 Competed Open to all
Aug 30, 2016 Construction Project to Upgrade Electrical and Mechanical Systems on the POE Navigational Lock at Sault Ste. Marie, Michigan. W911XK16C0017 on USAspending (opens in a new tab) $4,447,744 4 Competed Open to all
Jul 20, 2016 West Point Main Unit Transformer, West Point, GA W9127816C0018 on USAspending (opens in a new tab) Equipment purchase $4,623,328 1 Competed Open to all

Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders. After changes = the original award value was not reported, so the value shown includes later changes; such awards are left out of price statistics.

How the work was bought

Competition

Was the work open to bids?

  • Competed 4 (57%)

    A standalone contract that was open to bids.

  • Order (multiple-award IDIQ) 3 (43%)

    A task order placed under an IDIQ held by several companies, who competed for it.

Set-asides

Set-aside = reserved for a group of businesses.

  • Open to all 7 (100%)

    No set-aside: any size of business could bid.

Umbrella contracts used here

Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.

Contract Type Orders Ordering ends
W9127S23D0002 Multiple-award The IDIQ drew 2 offers 2 Oct 6, 2027
W9127822D0070 Multiple-award The IDIQ drew 3 offers 1 Aug 9, 2027

Contracts ending soon

Recurring work whose current contract ends within 18 months, so the agency will likely buy it again (a "recompete"). The company doing it today is the incumbent.

Report an error on this page

Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.