Contractor · based in Oklahoma
Maguire-Ohara Construction Inc: federal contracts won
UEI VNE5EB4V97J7
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Typical award won (median)
$98,993
The middle of 51 priced awards, FY2021–FY2025. Half were between $33.7k and $294k.
Typical bids faced
3
Median bids per award, reported for 43 of 43 competed awards. 5% drew only one bid.
Won as a small business
100%
Share of the 51 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Maguire-Ohara Construction Inc was $99k (FY2021-FY2025, 51 priced awards).
- That is 88% higher than the median for all construction & facilities work nationwide ($52.8k).
- Competed awards drew a median of 3 offers (reported for 43 of 43).
- 5% of competed awards drew only one offer.
- Its most frequent buyer was Franchise Acquisition Services (42 priced awards in FY2021-FY2025).
- Tip 82% of these awards were task orders under multiple-award contracts (MATOCs). To compete for those, you first need a spot on one of the umbrella contracts.
- Tip 90% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work near you
Includes competitor tracking: follow Maguire-Ohara Construction Inc and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 6 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2018 | 9 | $35,719 |
| FY2019 | 8 | $53,565 |
| FY2020 | 17 | $59,275 |
| FY2021 | 7 | $112,110 |
| FY2022 | 9 | $80,569 |
| FY2023 | 16 | $101,659 |
| FY2024 | 13 | $105,722 |
| FY2025 | 6 | $73,180 |
| FY2026 (provisional) | 14 | $115,570 |
Award sizes
- Holds the median award, $98,993
Recent awards won
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Sep 10, 2026 | Remove Three Mezzanine Fence Panels; Provide and Install New Mezzanine Safety Railing, New Mezzanine Electric, New Deck Mounted Horizontal Sliding Gate, 8'-0" Clear Opening, New Electrical for New Electric Sliding Gate, New Vertical Gate IN 6973GH26F01403 on USAspending (opens in a new tab) Provisional | $45,541 | 2 | Order (multiple-award IDIQ) Small business |
| Aug 26, 2026 | Construction for Installation of IP-VCS Systems for Tech OPS Training in 023-STB Rooms 151 & 153 - Architectural, Mechanical, Electrical 6973GH26F01327 on USAspending (opens in a new tab) Provisional | $487,862 | 2 | Order (multiple-award IDIQ) Small business |
| Aug 26, 2026 | WO#23-012935 CAI RM203Z FURN Concept 6973GH26F01331 on USAspending (opens in a new tab) Provisional | $447,280 | 3 | Order (multiple-award IDIQ) Small business |
| Aug 20, 2026 | Construction for Two Offices, One Break Area, One Meeting Space, and Ten 8X8 Workstations 6973GH26F01296 on USAspending (opens in a new tab) Provisional | $274,423 | 2 | Order (multiple-award IDIQ) Small business |
| Aug 14, 2026 | 014-AHQ, RMS. B05 and B06: Update Each Room to Hold "a Minimum of" 18 Students and 1 Instructor; Replica of ATB, RM. 109. 6973GH26F01241 on USAspending (opens in a new tab) Provisional | $66,534 | 3 | Order (multiple-award IDIQ) Small business |
| Aug 14, 2026 | Maintenance of office buildings 6973GH26F01242 on USAspending (opens in a new tab) Provisional | $160,276 | 3 | Order (multiple-award IDIQ) Small business |
| Aug 14, 2026 | Demolish Building 160-ST2 6973GH26F01250 on USAspending (opens in a new tab) Provisional | $53,811 | 3 | Order (multiple-award IDIQ) Small business |
| Aug 14, 2026 | Modifications to 027-TPS RM B05; Site Prep for the FAA Academy ZA4/ZA5 Labs (at Labs) As Part of Task Order 17 6973GH26F01261 on USAspending (opens in a new tab) Provisional | $70,864 | 2 | Order (multiple-award IDIQ) Small business |
| Aug 6, 2026 | WO#26-013155 ARB Site Prep for HQB Renovation & WO#26-022494 MB1 RMS 116&117 Offices Site Prep for HQB Renovation 6973GH26F01216 on USAspending (opens in a new tab) Provisional | $401,289 | 2 | Order (multiple-award IDIQ) Small business |
| Aug 4, 2026 | Mount Smart Boards and Monitors; Provide Power, HDMI Over Cat 6 and Monitors 6973GH26F01203 on USAspending (opens in a new tab) Provisional | $54,795 | 3 | Order (multiple-award IDIQ) Small business |
| Apr 16, 2026 | Demolition of Building 5922. 8 Sole Source. FA813726C0005 on USAspending (opens in a new tab) | $719,958 | 1 | Not competed Open to all |
| Mar 26, 2026 | Performance and Analysis Range Construction at Aeronautical Center 6973GH26C00033 on USAspending (opens in a new tab) | $8,320,486 | 10 | Competed Small business |
| Feb 17, 2026 | Maintenance of office buildings 6973GH26F00426 on USAspending (opens in a new tab) | $57,685 | 5 | Order (multiple-award IDIQ) Small business |
| Feb 11, 2026 | WO#25-038036 AOS RM151 Repair Water Damage 6973GH26F00410 on USAspending (opens in a new tab) | $14,118 | 6 | Order (multiple-award IDIQ) Small business |
| Sep 15, 2025 | WO#25-021154 ATB 6973GH25F01405 on USAspending (opens in a new tab) | $108,159 | 3 | Order (multiple-award IDIQ) Small business |
| Sep 12, 2025 | Renovate Room 109 in ATB 6973GH25F01393 on USAspending (opens in a new tab) | $163,997 | 3 | Order (multiple-award IDIQ) Small business |
| Sep 10, 2025 | 1. Repaint Existing Painted Interior Walls. 2. Remove and Replace Ceiling Tile. 3. Repair/Touch-Up Cabinets. 6973GH25F01367 on USAspending (opens in a new tab) | $38,200 | 2 | Order (multiple-award IDIQ) Small business |
| Sep 3, 2025 | Located at the First-Floor Level of Stair 3 (West Side) in MPB-024. - This Area of the Existing Exterior Concrete Slab Was an Unforeseen Roofing Condition Over the Basement Stair As a Left Over from the Recent Renovation Project. - Clean and PR 6973GH25F01334 on USAspending (opens in a new tab) | $32,966 | 4 | Order (multiple-award IDIQ) Small business |
| Aug 29, 2025 | The Contractor Shall Replace the Two Existing 810 Ton Water-Cooled Centrifugal Chillers, 3221-CH-1 and 3221-CH-2. FA813725C0014 on USAspending (opens in a new tab) | $4,491,153 | 3 | Competed Open to all |
| Jun 2, 2025 | At 002-LSF Machine Shop: - Demolish the Machine Shop Office Building - Remove Existing Wall-Mounted HVAC Unit - Remove and Cap Existing Fire Sprinkler Head - Remove Light Fixture from Office - Disconnect Electrical from Office - Provide and Ins 6973GH25F00924 on USAspending (opens in a new tab) | $17,812 | 5 | Order (multiple-award IDIQ) Small business |
| Sep 30, 2024 | The Work to Be Performed Under the Terms of This Contract Consists of Furnishing All Materials, Labor, Plant, Tools, Transportation, Equipment, Testing Services, Quality Control and Incidentals Required to Accomplish the Renovation of Restrooms. FA813724C0018 on USAspending (opens in a new tab) | $1,656,587 | 1 | Not competed 8(a) |
| Sep 24, 2024 | WO#19-010050 SPB Repaint Exterior 6973GH24F01552 on USAspending (opens in a new tab) | $105,722 | 4 | Order (multiple-award IDIQ) Small business |
| Sep 20, 2024 | HQB 335 Reconfigure / Contract Number: 6973GH-23-D-00100 / Task Order Number: TBD / Work Order Number 6973GH24F01545 on USAspending (opens in a new tab) | $56,719 | 4 | Order (multiple-award IDIQ) Small business |
| Sep 18, 2024 | 027-TPS 287/288 Concept / Contract Number: 6973GH-23-D-00100 / Task Order Number: TBD / Work Order Number 6973GH24F01538 on USAspending (opens in a new tab) | $134,397 | 4 | Order (multiple-award IDIQ) Small business |
| Sep 18, 2024 | TPS RM 250 New Finishes / Contract Number: 6973GH-23-D-00100 / Task Order Number: TBD / Work Order Number 6973GH24F01539 on USAspending (opens in a new tab) | $30,970 | 7 | Order (multiple-award IDIQ) Small business |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Order (multiple-award IDIQ) 42 (82%)
A task order placed under an IDIQ held by several companies, who competed for it.
- Not competed 8 (16%)
Sole-source: only one company was asked.
- Competed 1 (2%)
A standalone contract that was open to bids.
Set-asides
Set-aside = reserved for a group of businesses.
- Small business 41 (80%)
Only small businesses could bid.
- 8(a) 5 (10%)
Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.
- Open to all 5 (10%)
No set-aside: any size of business could bid.
Who they work for
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| 6973GH18D00076 | Multiple-award The IDIQ drew 11 offers | 29 | Oct 31, 2023 |
| 6973GH23D00100 | Multiple-award The IDIQ drew 8 offers | 13 | Jul 31, 2027 |
Contracts ending soon
Recurring work whose current contract ends within 18 months, so the agency will likely buy it again (a "recompete"). The company doing it today is the incumbent.
-
Ordering period ends Jul 31, 2027
FY23 General Construction Contractor IDIQ Contracts
Incumbent: Maguire-Ohara Construction Inc Buyer: Franchise Acquisition Services
6973GH23D00100 on USAspending (opens in a new tab)
Similar contractors
- Arnold Electric Inc
- Power Washing Extreme, Inc. (DBA) Pwe, Inc.
- Chickasaw Defense Logistics, LLC
- Cherokee Nation Environmental Solutions, L.L.C.
- Native Star Group, Inc
- Delta Electrical Contractors, Inc.
- Warfeather, LLC
- HGL Construction Inc
- Flowers Construction L.L.C
- Pono Aina Management LLC
- Metropolitan Air Conditioning Service Co
- Ready Services, LLC
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.