Contractor · based in Montana

NW Construction, Inc: federal contracts won

UEI SNSLU2QXJ7Z5

Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status

Typical award won (median)

$90,430,625

The middle of 6 priced awards, FY2021–FY2025.

Typical bids faced

3

Median bids per award, reported for 6 of 6 competed awards.

Won as a small business

–

Not enough priced awards to show a share.

Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.

What this means

  • The middle construction & facilities award won by NW Construction, Inc was $90.4M (FY2021-FY2025, 6 priced awards).
  • Competed awards drew a median of 3 offers (reported for 6 of 6).
  • There were 6 construction & facilities awards won by NW Construction, Inc in FY2021-FY2025; 6 had a usable price.

FedComps Pro · coming soon · free waitlist

Get alerts for new heavy & civil work near you

Includes competitor tracking: follow NW Construction, Inc and the other companies you bid against.

  • Alerts that say if a bid is worth it
  • Deadline and amendment alerts
  • Recompete radar
  • Plain-English bid summaries
  • Competitor tracking
  • Unlimited saved searches

Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing

Your sign-up did not go through. Please check your email and ZIP code and try again. The spam check needs JavaScript turned on.

Add your company (optional)

We only email you about the launch. Delete your details any time.

Awards per year

Column chart of awards per fiscal year, FY2016 to FY2026. FY2025, the latest full year: 2 awards. Most in one year: 3 awards in FY2019. FY2026 is still being reported. 0 1 2 3 4 5 2016 ’16 2017 ’17 2018 ’18 2019 ’19 2020 ’20 2021 ’21 2022 ’22 2023 ’23 2024 ’24 2025 ’25 2026 ’26
  • FY2025, the latest full year: 2 awards
  • FY2026 is still being reported
Federal fiscal years run October to September.
Show the numbers
YearAwardsMedian award
FY2016 1 –
FY2017 0 –
FY2018 1 –
FY2019 3 –
FY2020 1 –
FY2021 0 –
FY2022 2 –
FY2023 1 –
FY2024 1 –
FY2025 2 –
FY2026 (provisional) 0 –

Award sizes

Bar chart of priced awards FY2021–FY2025 by size. The most common size was Over $25M (5 awards). The median award, $90,430,625, is in the Over $25M band. Under $25k 0 $25k to $250k 0 $250k to $1M 0 $1M to $5M 1 $5M to $25M 0 Over $25M 5
  • Holds the median award, $90,430,625
Priced awards FY2021–FY2025, by value at award.

Recent awards won

The latest 12 awards, newest first. Each contract number opens its official record on USAspending.gov.

Project How it was awarded
Jul 15, 2025 Improve Operations Canal Fish Screen Dam Fish Passage Project 140R2025C0006 on USAspending (opens in a new tab) Unusually large $92,539,850 4 Competed Open to all
May 20, 2025 The Work Required Is for Phase II Dam Sod Modifications. 140R2025C0004 on USAspending (opens in a new tab) Unusually large $255,075,500 3 Competed Open to all
Jun 3, 2024 St. Mary Canal Diversion Works Dam Replacement and Fish Modification, MILK River Project, Montana 140R6024C0008 on USAspending (opens in a new tab) Unusually large $88,321,400 1 Competed Open to all
Mar 7, 2023 The Purpose of This Contract Is to Perform Modifications to Fresno Dam Located in Hill County, Montana 140R6023C0002 on USAspending (opens in a new tab) $43,599,090 2 Competed Open to all
Apr 28, 2022 Yellowtail Dam Spillway Concrete Repair, Apron Protection, and Rockfall Protection System 140R6022C0007 on USAspending (opens in a new tab) $3,415,700 3 Competed Small business
Apr 27, 2022 BF Safety of Dams (Sod) Modifications, Phase I, This Phase Includes Construction of Shear Keys, Stability Berms, and Spillway Modification. The Project Will Address Issues with the Select Foundation Materials That the Dam Was Built Upon and Will 140R2022C0007 on USAspending (opens in a new tab) Unusually large $119,973,750 7 Competed Open to all
Jul 13, 2020 Alcova Dam Spillway Concrete Repair 140R6020C0008 on USAspending (opens in a new tab) $2,975,480 2 Competed Small business
Sep 26, 2019 Dam Rehabilitation Project, Modoc County, CA W912PP19C0026 on USAspending (opens in a new tab) $8,855,800 3 Competed Small business
Sep 3, 2019 Dam and Dike Modifications, Fort Hall Indian Reservation, ID W912PP19C0022 on USAspending (opens in a new tab) $7,656,775 3 Competed Small business
Dec 13, 2018 Boca Dam Seismic Modifications 140R2019C0006 on USAspending (opens in a new tab) $19,675,920 6 Competed Small business
Sep 18, 2018 Award of Green River Canal Fish Screen Project (Solicitation 140R4018R0028) 140R4018C0031 on USAspending (opens in a new tab) $2,500,000 4 Competed Small business
May 13, 2016 R16PC00062 - Stampede Dam - Dam Safety Modifications INR16PC00062 on USAspending (opens in a new tab) $21,794,650 6 Competed Small business

Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.

How the work was bought

Competition

Was the work open to bids?

  • Competed 6 (100%)

    A standalone contract that was open to bids.

Set-asides

Set-aside = reserved for a group of businesses.

  • Open to all 5 (83%)

    No set-aside: any size of business could bid.

  • Small business 1 (17%)

    Only small businesses could bid.

Report an error on this page

Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.