Contractor · based in Alaska
Port Graham Development Corporation: federal contracts won
UEI NAHNHCECQLB8
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Sep 21, 2026. Data status
Typical award won (median)
$93,697
The middle of 20 priced awards, FY2021–FY2025. Half were between $88.4k and $97.9k.
Typical bids faced
4
Median bids per award, reported for 20 of 20 competed awards. 0% drew only one bid.
Won as a small business
100%
Share of the 20 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Port Graham Development Corporation was $93.7k (FY2021-FY2025, 20 priced awards).
- That is 78% higher than the median for all construction & facilities work nationwide ($52.8k).
- Competed awards drew a median of 4 offers (reported for 20 of 20).
- 0% of competed awards drew only one offer.
- Its most frequent buyer was Franchise Acquisition Services (20 priced awards in FY2021-FY2025).
- Tip 100% of these awards were task orders under multiple-award contracts (MATOCs). To compete for those, you first need a spot on one of the umbrella contracts.
FedComps Pro · coming soon · free waitlist
Get alerts for new electrical work near you
Includes competitor tracking: follow Port Graham Development Corporation and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 5 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 4 | – |
| FY2017 | 0 | – |
| FY2018 | 0 | – |
| FY2019 | 0 | – |
| FY2020 | 0 | – |
| FY2021 | 0 | – |
| FY2022 | 3 | – |
| FY2023 | 6 | $82,088 |
| FY2024 | 6 | $95,388 |
| FY2025 | 5 | $93,789 |
| FY2026 (provisional) | 9 | $92,052 |
Award sizes
- Holds the median award, $93,697
Recent awards won
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Sep 11, 2026 | IIJA Funded ARSR, Garden City KS: 21002954 This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Garden City, KS ARSR Which Includes a Full Power Systems Study 6973GH26F01391 on USAspending (opens in a new tab) | $100,841 | 4 | Order (multiple-award IDIQ) Open to all |
| Aug 21, 2026 | Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Cleveland, OH (CLEA) ASR Which Includes a Full Power Systems Study of the Facility. 21002951 6973GH26F01295 on USAspending (opens in a new tab) | $79,899 | 3 | Order (multiple-award IDIQ) Small business |
| Jul 16, 2026 | Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Allentown, PA ASR Which Includes a Full Power Systems Study of the Facility. 1703575 6973GH26F01065 on USAspending (opens in a new tab) | $89,978 | 3 | Order (multiple-award IDIQ) Open to all |
| May 5, 2026 | This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Dansville, NY ARSR. 21002667 6973GH26F00741 on USAspending (opens in a new tab) | $77,985 | 4 | Order (multiple-award IDIQ) Open to all |
| Apr 21, 2026 | IIJA Funded. Ashburn, Ga ARSR: 20008134 This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Ashburn, Ga ARSR. 6973GH26F00673 on USAspending (opens in a new tab) | $92,052 | 4 | Order (multiple-award IDIQ) Open to all |
| Mar 5, 2026 | This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Coopersville, Mi ARSR Which Includes a Full Power Systems Study of the Facility. 21000077 6973GH26F00484 on USAspending (opens in a new tab) | $103,759 | 5 | Order (multiple-award IDIQ) Open to all |
| Dec 12, 2025 | IIJA Funded. Citronelle, Al ARSR: 18066545 This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Citronelle, Al ARSR Which Includes a Full Power Systems Study of the FAC 6973GH26F00016 on USAspending (opens in a new tab) | $92,478 | 2 | Order (multiple-award IDIQ) Open to all |
| Dec 12, 2025 | IIJA Funded. Kansas City, MO (MCI) ATCT: 26000505 This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Kansas City, MO (MCI) ATCT Which Includes a Full Power Systems Study 6973GH26F00168 on USAspending (opens in a new tab) | $80,443 | 2 | Order (multiple-award IDIQ) Open to all |
| Dec 12, 2025 | IIJA Funded. Slidell, La (SIL) ARSR: 26000506 This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Slidell, La (SIL) ARSR Which Includes a Full Power Systems Study of the Facility. 6973GH26F00169 on USAspending (opens in a new tab) | $103,944 | 2 | Order (multiple-award IDIQ) Open to all |
| Sep 17, 2025 | IIJA Funded. Freeland, Mi (MBS) ASR: 18066401 This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Freeland, Mi (MBS) ASR Which Includes a Full Power Systems Study of the Facility. 6973GH25F01406 on USAspending (opens in a new tab) | $96,808 | 3 | Order (multiple-award IDIQ) Open to all |
| Jun 9, 2025 | IIJA Funded. Flint, Mi ASR: 19005396 This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Flint, Mi ASR, Which Includes a Full Power Systems Study of the Facility. 6973GH25F00961 on USAspending (opens in a new tab) | $92,866 | 4 | Order (multiple-award IDIQ) Open to all |
| Jun 9, 2025 | IIJA Funded. Rochester, MN ASR: 24010113 This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Rochester, MN ASR, Which Includes a Full Power Systems Study of the FACI 6973GH25F00962 on USAspending (opens in a new tab) | $93,801 | 4 | Order (multiple-award IDIQ) Open to all |
| Jun 9, 2025 | IIJA Funded. Muskegon, Mi ASR: 22007976 This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Muskegon, Mi ASR, Which Includes a Full Power Systems Study 6973GH25F00963 on USAspending (opens in a new tab) | $93,789 | 4 | Order (multiple-award IDIQ) Open to all |
| Nov 6, 2024 | BIL Funds. Construction Cost of UPS and the UPS Ancillary Equipment Removal and Installation at the Gulfport, MS ASR per the RFQ-24-25 Bid Package. 18066536 Includes Option #1 Full Arc Flash Hazard Analysis of the Facility. 6973GH25F00094 on USAspending (opens in a new tab) | $88,338 | 2 | Order (multiple-award IDIQ) Open to all |
| Sep 5, 2024 | BIL Funds. Construction Cost of UPS and the UPS Ancillary Equipment Removal and Installation at the Roswell, NM (Row) ASR per the RFQ-24-23 Bid Package. 24010109 Includes Option #1 Full Arc Flash Hazard Analysis of the Facility. 6973GH24F01375 on USAspending (opens in a new tab) | $81,721 | 3 | Order (multiple-award IDIQ) Open to all |
| Jul 30, 2024 | BIL Funds. Construction Cost of UPS and the UPS Ancillary Equipment Removal and Installation at the Kirksville, MO ARSR per the RFQ-24-21 Bid Package. 18060881 6973GH24F01221 on USAspending (opens in a new tab) | $112,079 | 3 | Order (multiple-award IDIQ) Open to all |
| Jul 29, 2024 | BIL Funds. Construction Cost of UPS and the UPS Ancillary Equipment Removal and Installation at the Dallas, TX, ASR per the RFQ-24-18 Bid Package. 22004412 Includes Option #1 Full Arc Flash Hazard Analysis of the Facility. 6973GH24F01138 on USAspending (opens in a new tab) | $97,605 | 3 | Order (multiple-award IDIQ) Open to all |
| Feb 8, 2024 | UPS Installation. 18065273 LOC: DCA, Washington DC. Construction Cost of UPS and UPS Ancillary Equipment Removal and Installation at Washington, DC per RFQ-24-07 Bid Package, Which Includes Full Arc Flash Hazard Analysis of the FAC 6973GH24F00393 on USAspending (opens in a new tab) | $98,670 | 5 | Order (multiple-award IDIQ) Open to all |
| Feb 7, 2024 | BIL UPS Installation. 22004515, LOC: PCS, Leesburg VA. Construction Cost of UPS and UPS Ancillary Equipment Removal and Installation at Leesburg, VA per RFQ-24-07 Bid Package. Package Includes the Full Arc Flash Hazard Analysis of TH 6973GH24F00391 on USAspending (opens in a new tab) | $90,904 | 5 | Order (multiple-award IDIQ) Open to all |
| Jan 30, 2024 | BIL UPS Installation. 18066525, LOC: Pit, Pittsburgh PA. Construction Cost of UPS and UPS Ancillary Equipment Removal and Installation at Pittsburgh, PA per RFQ 24-06 Bid Package. Includes Option #1 Full Arc Flash Hazard Analysis 6973GH24F00324 on USAspending (opens in a new tab) | $93,170 | 4 | Order (multiple-award IDIQ) Open to all |
| Mar 17, 2023 | BIL-UPS Replacement on the MSP, Located in Minneapolis, MN. Iaw Minneapolis, MN (MSP - Sustainment Installation SOW 2) and MSP-TDWR-18066415-DESIGN-10-25-2021-FINAL. 22002359 6973GH23F00673 on USAspending (opens in a new tab) | $72,880 | 3 | Order (multiple-award IDIQ) Open to all |
| Mar 3, 2023 | BIL-UPS Construction Cost Indianapolis in IND: 22002391 6973GH23F00641 on USAspending (opens in a new tab) | $75,706 | 4 | Order (multiple-award IDIQ) Open to all |
| Mar 3, 2023 | BIL-UPS Construction Cost. McCook IL Ord: 22002394 6973GH23F00643 on USAspending (opens in a new tab) | $94,588 | 4 | Order (multiple-award IDIQ) Open to all |
| Mar 3, 2023 | BIL-UPS Construction Cost. Crestwood IL: 22002381 6973GH23F00644 on USAspending (opens in a new tab) | $88,468 | 4 | Order (multiple-award IDIQ) Open to all |
| Mar 3, 2023 | BIL-UPS Construction Cost Chicago IL ASR: 22004417 6973GH23F00646 on USAspending (opens in a new tab) | $134,869 | 4 | Order (multiple-award IDIQ) Open to all |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Order (multiple-award IDIQ) 20 (100%)
A task order placed under an IDIQ held by several companies, who competed for it.
Set-asides
Set-aside = reserved for a group of businesses.
- Open to all 19 (95%)
No set-aside: any size of business could bid.
- Small business 1 (5%)
Only small businesses could bid.
Who they work for
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| 6973GH22D00013 | Multiple-award The IDIQ drew 15 offers | 20 | Oct 31, 2026 |
Contracts ending soon
Recurring work whose current contract ends within 18 months, so the agency will likely buy it again (a "recompete"). The company doing it today is the incumbent.
-
Ordering period ends Oct 31, 2026
PSG IDIQ Contract for Site Survey, Design and Installation
Incumbent: Port Graham Development Corporation Buyer: Franchise Acquisition Services
6973GH22D00013 on USAspending (opens in a new tab)
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.