Contractor · based in Missouri

Rand Construction Company: federal contracts won

UEI V78GCM6LJAC7

Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Sep 21, 2026. Data status

Typical award won (median)

$1,750,122

The middle of 6 priced awards, FY2021–FY2025.

Typical bids faced

2.5

Median bids per award, reported for 6 of 6 competed awards.

Won as a small business

–

Not enough priced awards to show a share.

Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.

What this means

  • The middle construction & facilities award won by Rand Construction Company was $1.8M (FY2021-FY2025, 6 priced awards).
  • Competed awards drew a median of 2.5 offers (reported for 6 of 6).
  • Its most frequent buyer was GSA PBS Region 6 Construction Acquisition Branch (5 priced awards in FY2021-FY2025).

FedComps Pro · coming soon · free waitlist

Get alerts for new building construction work near you

Includes competitor tracking: follow Rand Construction Company and the other companies you bid against.

  • Alerts that say if a bid is worth it
  • Deadline and amendment alerts
  • Recompete radar
  • Plain-English bid summaries
  • Competitor tracking
  • Unlimited saved searches

Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing

Your sign-up did not go through. Please check your email and ZIP code and try again. The spam check needs JavaScript turned on.

Add your company (optional)

We only email you about the launch. Delete your details any time.

Awards per year

Column chart of awards per fiscal year, FY2016 to FY2026. FY2025, the latest full year: no awards. Most in one year: 8 awards in FY2019. FY2026 is still being reported. 0 2 4 6 8 2016 ’16 2017 ’17 2018 ’18 2019 ’19 2020 ’20 2021 ’21 2022 ’22 2023 ’23 2024 ’24 2025 ’25 2026 ’26
  • FY2025, the latest full year: no awards
  • FY2026 is still being reported
Federal fiscal years run October to September.
Show the numbers
YearAwardsMedian award
FY2016 3 –
FY2017 7 $1,062,850
FY2018 5 $538,300
FY2019 8 $705,409
FY2020 1 –
FY2021 0 –
FY2022 4 –
FY2023 1 –
FY2024 1 –
FY2025 0 –
FY2026 (provisional) 0 –

Award sizes

Bar chart of priced awards FY2021–FY2025 by size. The most common size was $1M to $5M (5 awards). The median award, $1,750,122, is in the $1M to $5M band. Under $25k 0 $25k to $250k 0 $250k to $1M 1 $1M to $5M 5 $5M to $25M 0 Over $25M 0
  • Holds the median award, $1,750,122
Priced awards FY2021–FY2025, by value at award.

Recent awards won

The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.

Project How it was awarded
Sep 27, 2024 This Project Shall Repair All Egress, Life Safety, Code and Other Issues As Well As Structural, Mechanical and Electrical Deficiencies on the West Dock of the 2306-2312 Bannister Federal Building, in Accordance with the 2016 West Dock Study. 47PG1024F0007 on USAspending (opens in a new tab) $2,172,840 3 Order (multiple-award IDIQ) Open to all
Sep 21, 2023 2306 Bannister Federal Building, Kansas City, Missouri 64131. Design Build SCIF Room for the United States Department of Agriculture. 47PG0223F0093 on USAspending (opens in a new tab) $1,117,430 1 Order (multiple-award IDIQ) Open to all
Aug 24, 2022 Kansas City, MO 64106. Award Cooling Tower Fire Suppression and Fire Sprinkler Test Drains 47PG0222F0061 on USAspending (opens in a new tab) $404,100 2 Order (multiple-award IDIQ) Open to all
Jul 8, 2022 Kansas City MO 64414 - United States Department of Agriculture Pod 3 Chiller 47PG0222F0048 on USAspending (opens in a new tab) $2,068,777 4 Order (multiple-award IDIQ) Open to all
Jun 27, 2022 Location, Kansas City MO This Award Is for Project N2017936 WP USDA Disc Parallel Gear. 47PG0222F0044 on USAspending (opens in a new tab) $2,059,310 2 Order (multiple-award IDIQ) Open to all
Nov 16, 2021 RMO22861 Bolling Federal Building Roof Replacement and Roof Fall Protection Kansas City Missouri 47PG0222F0007 on USAspending (opens in a new tab) $1,440,934 5 Order (multiple-award IDIQ) Open to all
Sep 3, 2020 N1797008 USAO 4_5TH Floor Reno MO0050ZZ, Kansas City MO 64106 Design-Build Services to Replace Floor and Wall Covering in the Designated Spaces. 47PG0220F0059 on USAspending (opens in a new tab) $823,235 4 Order (multiple-award IDIQ) Open to all
Sep 25, 2019 Bannister Federal Complex, 2306 - Kansas City MO 64131. Immediately Upon Signature of the Contracting Officer, RMO22700 West Dock Upgrades Is Hereby Awarded to Provide the Construction Requirements Listed in the SOW. 47PG0219F0076 on USAspending (opens in a new tab) $1,489,800 3 Order (multiple-award IDIQ) Open to all
Sep 24, 2019 Federal Building Kansas City, MO This Project Provides for Water Proofing an Interior Expansion Joint That Spans the Second Floor of the Federal Building. 47PG0219F0073 on USAspending (opens in a new tab) $875,991 1 Order (multiple-award IDIQ) Open to all
Jul 23, 2019 Contract with RAND Construction to Provide Water Truck and Personnel During KCMO Water Main Break Emergency on June 18, 2019 1264WC19P0019 on USAspending (opens in a new tab) $3,039 1 Not competed Open to all
May 17, 2019 Disc Power Reliability Kansas City, MO 64114 47PG0219F0029 on USAspending (opens in a new tab) $2,161,000 1 Order (multiple-award IDIQ) Open to all
Jan 3, 2019 Kansas City, MO. 47PG0219F0014 Is Hereby Awarded to Provide Necessary Construction Services in Accordance with the Specifications and Offer Form Signed 12/19/2018 and Verified on 12/28/2018. Proposal Documents Are Hereby Incorporated into This Contract. The Period of Performance for This Contract Is 120 Calendar Days, to Be Completed by 05/02/2019. (Plus 60 Calendar Days for Closeout). Notice to… 47PG0219F0014 on USAspending (opens in a new tab) $534,826 3 Order (multiple-award IDIQ) Open to all
Nov 8, 2018 Federal Building, Kansas City, MO Contract No GS-06-P-16-GZ-D-7011 / Task Order 47G0219F0007 N1511310B USDA Disc Phase Pod 1B Renovation 47PG0219F0007 on USAspending (opens in a new tab) $4,253,000 1 Order (multiple-award IDIQ) Open to all
Nov 5, 2018 NITC Fiber Entry&Security Fence Kansas City, MO This Project Provides for Construction Services As Required to Install a Below Grade Communications Vault and A Secure Fence. 47PG0219F0005 on USAspending (opens in a new tab) $464,000 1 Order (multiple-award IDIQ) Open to all
Oct 11, 2018 Whittaker USCH and Federal Building, KCMO, 64106 - This Contract Was Awarded to Provide Design&Construction for a Conference Room Renovation for the U.S. Attorneys at Whittaker on the 5TH Floor. 47PG0219F0002 on USAspending (opens in a new tab) $300,700 2 Order (multiple-award IDIQ) Open to all
Sep 28, 2018 Richard Bolling Federal Building, Kansas City, MO 64106 - This Contract Was Awarded to Design&Construct Approx. 14,000 SQ. Ft. Of Space to Accommodate an Additional 100 Employees at the Bolling SSA Center 47PG0218F0065 on USAspending (opens in a new tab) $569,000 2 Order (multiple-award IDIQ) Open to all
Sep 12, 2018 Kansas City, MO. Replace HVAC Fan Motor. 47PG0818C0005 on USAspending (opens in a new tab) $4,255 1 Not competed Open to all
Aug 15, 2018 The Contractor Shall Furnish All Necessary Labor, Material, Equipment, and Supervision to Correct All Identified Platform Issues to Comply with Applicable Federal and State Regulations, per the SOW Dated July 23, 2018 and in Accordance with the Base Contract GS-06-P-16-GZ-D-7011 and Contract Specifications. The SOW Dated July 23, 2018, Drawings Dated 06012018 and the Contractor's Proposal Dated… 47PG0018F0011 on USAspending (opens in a new tab) $210,735 1 Order (multiple-award IDIQ) Open to all
May 23, 2018 USMC, Building Location: Bannister Federal Complex, Kansas City MO 64131. The Purpose of This Project Is to Renovate Existing Space to Build Out Approximately 14,800 SF of Workspace to Accommodate USMC Mission. 47PG0218F0041 on USAspending (opens in a new tab) $2,613,000 2 Order (multiple-award IDIQ) Open to all
Apr 2, 2018 FPD Expansion and Architectural Barriers Act Accessibility Standard Project, Robert J. Dole, Kansas City, KS 66101, Project No. N1558030, This Order Is Issued to Reconfigure and or Remodel Their Existing Space. 47PG0218F0031 on USAspending (opens in a new tab) $538,300 2 Order (multiple-award IDIQ) Open to all
Sep 21, 2017 USMC VOIP Infrastructure, Building Location: Bannister Federal Complex, Kansas City MO 64131. The Purpose of This Project Is to Route Required Power Throughout the Bannister BLDG. The Routing of the Required Power Is to Be Completed in a Wagon Wheel Fashion, from Each of the 11 Telecom Closets Connecting to A Centralized UPS Location. Electrical Power Will Be Routed from the UPS to A Automatic… 47PG0217F0019 on USAspending (opens in a new tab) $766,180 3 Order (multiple-award IDIQ) Open to all
Sep 21, 2017 Kansas City MO 64131. Contract No. GS-06-P-16-GZ-D-7011 / Task Order No. 47PG0217F0020 for BAS Replacement. 47PG0217F0020 on USAspending (opens in a new tab) $1,736,800 2 Order (multiple-award IDIQ) Open to all
Aug 15, 2017 Federal Building, Kansas City, MO Contract No. GS-06-P-16-GZ-D-7011 / Task Order No. 47PG0217F0007. The National Information Technology Center (NITC) Is Comprised of 30,985 SF of Computer Room Data Center, Supported by Office Space. The Data Center Is Currently Configured As Three PODS. The Goal of This Project (N1511310) Is to Replace the Existing Legacy Uninterrupted Power Supply (UPS). 47PG0217F0007 on USAspending (opens in a new tab) $1,062,850 3 Order (multiple-award IDIQ) Open to all
Aug 7, 2017 USMC MCCS Bannister Renovation, Building Location: Bannister Federal Complex, Kansas City MO 64131. The Purpose of This Project Is to Renovate Existing Space to Build Out Approximately 21,000 SF of Workspace to Accommodate USMC MCCS Mission. 47PG0217F0002 on USAspending (opens in a new tab) $2,476,778 2 Order (multiple-award IDIQ) Open to all
May 12, 2017 Bannister Federal Building Location, Kansas City, MO 64131. Immediately Upon Signature of the Contracting Officer, Task Order N1541571 Is Hereby Issued to Modify the Existing USMC Enterprise Service Desk (ESD).the New Equipment Will Be Housed in an Existing Room Identified As a UPS Room with New Cooling Equipment. GSP0617GZ0021 on USAspending (opens in a new tab) $954,860 5 Order (multiple-award IDIQ) Open to all

Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.

How the work was bought

Competition

Was the work open to bids?

  • Order (multiple-award IDIQ) 6 (100%)

    A task order placed under an IDIQ held by several companies, who competed for it.

Set-asides

Set-aside = reserved for a group of businesses.

  • Open to all 6 (100%)

    No set-aside: any size of business could bid.

Umbrella contracts used here

Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.

Contract Type Orders Ordering ends
47PG0220D0027 Multiple-award The IDIQ drew 39 offers 6 Feb 27, 2026
Report an error on this page