Typical award won (median)
$441,637
The middle of 12 priced awards, FY2021–FY2025. Half were between $245k and $1.8M.
Typical bids faced
–
Too few awards report bids (2 of 2) to show a typical number.
Won as a small business
100%
Share of the 12 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Rod Transport Inc was $442k (FY2021-FY2025, 12 priced awards).
- That is 8.4 times the median for all construction & facilities work nationwide ($52.8k).
- Its most frequent buyer was USACE San Francisco District (7 priced awards in FY2021-FY2025).
- 50% of its priced awards were within 100 miles of its home base.
- 0% of priced awards were task orders under IDIQ contracts.
- Tip 67% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
FedComps Pro · coming soon · free waitlist
Get alerts for new heavy & civil work near you
Includes competitor tracking: follow Rod Transport Inc and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: no awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2018 | 3 | – |
| FY2019 | 2 | – |
| FY2020 | 2 | – |
| FY2021 | 5 | $256,601 |
| FY2022 | 1 | – |
| FY2023 | 3 | – |
| FY2024 | 3 | – |
| FY2025 | 0 | – |
| FY2026 (provisional) | 0 | – |
Award sizes
- Holds the median award, $441,637
Recent awards won
The latest 19 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Sep 18, 2024 | To Remove and Replace One Hanger Rod Assembly in the Shasta Dam Temperature Control Device. 140R2024C0022 on USAspending (opens in a new tab) | $187,000 | 5 | Competed Small business |
| Aug 22, 2024 | PL 84-99 Pajaro Right Bank Repair W912P724C0020 on USAspending (opens in a new tab) | $3,785,550 | 1 | Not competed 8(a) |
| May 3, 2024 | Sacramento Levee Road Repair W912P724C0007 on USAspending (opens in a new tab) | $3,350,000 | 1 | Not competed Open to all |
| May 26, 2023 | Dry Creek Ecosystem Restoration Project Phase II W912P723C0009 on USAspending (opens in a new tab) | $6,675,000 | 2 | Competed HUBZone |
| Oct 17, 2022 | Pajaro Site 24 and Slurry Seal Repairs W912P723C0001 on USAspending (opens in a new tab) | $504,849 | 1 | Not competed Open to all |
| Oct 17, 2022 | Soledad (PL-84) Flood Risk Management Project W912P723C0002 on USAspending (opens in a new tab) | $1,283,900 | 1 | Not competed 8(a) |
| Jul 13, 2022 | Powerplant Debris Log Boom Work Site Location: Work Is Located Hydro Power Plant, CA, in Sacramento County Magnitude of Construction Is Between $100,000 and $250,000 Information: This Requirement Is Being Pro 140R2022C0013 on USAspending (opens in a new tab) | $378,425 | 1 | Not competed 8(a) |
| Sep 29, 2021 | Restroom Construction W912P721C0017 on USAspending (opens in a new tab) | $358,005 | 1 | Not competed 8(a) |
| Sep 23, 2021 | Install Fence (STA 10+00 to STA 59+39) W9127N21C0044 on USAspending (opens in a new tab) | $256,601 | 1 | Not competed 8(a) |
| Sep 17, 2021 | Clearing and Grubbing Fence Demo & Barrier Screen Installation W9127N21C0039 on USAspending (opens in a new tab) | $899,734 | 1 | Not competed 8(a) |
| Aug 17, 2021 | Hatchery Terminal Structure 42 Inch Slide Gate Replacement 140R2021C0010 on USAspending (opens in a new tab) | $67,572 | 1 | Not competed Open to all |
| Apr 19, 2021 | Berryessa Construction Completion Project W912P721C0004 on USAspending (opens in a new tab) | $208,917 | 1 | Not competed Open to all |
| Sep 29, 2020 | Wetland Berm Repair Project W912P720C0019 on USAspending (opens in a new tab) | $956,425 | 1 | Not competed 8(a) |
| Sep 11, 2020 | MISC Construction #3 W9123820C0020 on USAspending (opens in a new tab) | $143,894 | 1 | Not competed 8(a) |
| Sep 9, 2019 | North Seasonal Wetland Temporary Berm Repair W912P719C0017 on USAspending (opens in a new tab) | $91,467 | 1 | Not competed 8(a) |
| Mar 15, 2019 | IGF:0G:IGF San Lorenzo River Levee Repair Project W912P719C0005 on USAspending (opens in a new tab) | $403,483 | 1 | Not competed 8(a) |
| Sep 17, 2018 | Site Preparation, Furnishing and Installation of Three Dual Head EVCS (CT4021) at the Bureau of Reclamation Property at Folsom Dam, New Melones&Lake Berryessa CA. 140R2018C0043 on USAspending (opens in a new tab) | $135,123 | 1 | Not competed 8(a) |
| Sep 12, 2018 | PL 84-99 Hydraulic Erosion Repair, Sheet Pile Wall Installation, and Levee Construction Located Within the San Joaquin County Flood Control and Water Conservation District Near Stockton, CA. W9123818C0041 on USAspending (opens in a new tab) | $3,430,118 | 1 | Not competed 8(a) |
| Aug 15, 2018 | MISC Dam Construction, Folsom, CA W9123818C0027 on USAspending (opens in a new tab) | $919,258 | 1 | Not competed 8(a) |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Not competed 10 (83%)
Sole-source: only one company was asked.
- Competed 2 (17%)
A standalone contract that was open to bids.
Set-asides
Set-aside = reserved for a group of businesses.
- 8(a) 6 (50%)
Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.
- Open to all 4 (33%)
No set-aside: any size of business could bid.
- Small business 1 (8%)
Only small businesses could bid.
- HUBZone 1 (8%)
Reserved for small businesses in a Historically Underutilized Business Zone.
Who they work for
Similar contractors
- The Dutra Group
- Curtin Maritime Corp
- Nova Group, Inc.
- Reyes Construction, Inc.
- Marathon Construction Corporation
- R.E. Staite Engineering, Inc.
- Granite Construction Company
- Pacific Dredge and Construction, LLC
- Camenzind Dutra JV LLC
- Maloney-Odin A Joint Venture
- Shimmick Construction Company, Inc.
- Pacific Maritime Group Inc
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.