Contracting office
El Paso Intelligence Center (15DDNE): construction & facilities contracts
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Sep 21, 2026. Data status
Open bids here now
No open bids here right now. Updated weekly from SAM.gov · data through Oct 25. Save this search
Typical award (median)
$4,480
The middle of 21 priced awards, FY2021–FY2025. Half were between $1.5k and $6.6k.
Typical number of bids
1
Median bids per award, reported for 7 of 7 competed awards.
Won by small businesses
95%
Share of the 21 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award from El Paso Intelligence Center was $4.5k (FY2021-FY2025, 21 priced awards).
- That is 92% lower than the median for all construction & facilities work nationwide ($52.8k).
- Competed awards drew a median of 1 offer (reported for 7 of 7).
- Small businesses won 95% of priced awards.
- The top 3 winners took 95% of priced awards.
- Tip The typical award drew only 1 bid. Less competition can mean a better chance for a new bidder.
FedComps Pro · coming soon · free waitlist
Get alerts for new electrical work near you
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 5 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 2 | – |
| FY2017 | 5 | $7,542 |
| FY2018 | 13 | $3,625 |
| FY2019 | 2 | – |
| FY2020 | 3 | – |
| FY2021 | 0 | – |
| FY2022 | 4 | – |
| FY2023 | 9 | $1,700 |
| FY2024 | 3 | – |
| FY2025 | 5 | $4,362 |
| FY2026 (provisional) | 0 | – |
Award sizes
- Holds the median award, $4,480
Recent awards
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | ||||
|---|---|---|---|---|---|
| Jun 11, 2025 | Title: 25-S-166/Coefficient/Repair Sewage System/Face 15DDNE25P00000035 on USAspending (opens in a new tab) | Coefficient Systems Testing, Inc | $4,362 | 1 | Not competed Open to all |
| May 21, 2025 | Title: 25-S-152/Coefficient/MISC Electrical Work/Face 15DDNE25P00000031 on USAspending (opens in a new tab) | Coefficient Systems Testing, Inc | $5,365 | 1 | Not competed Open to all |
| Apr 28, 2025 | Title: 25-S-127 Phase 3 Cabling/Face 15DDNE25P00000025 on USAspending (opens in a new tab) Equipment purchase | Individual contractor (name withheld) | $6,888 | 1 | Not competed Open to all |
| Feb 20, 2025 | Title: 25-S-080 Coefficient Systems/Connectors/Face 15DDNE25P00000017 on USAspending (opens in a new tab) | Coefficient Systems Testing, Inc | $8,360 | 1 | Not competed Open to all |
| Feb 13, 2025 | Title: 25-S-078/Coefficient Systems/Emergency Call/Face 15DDNE25P00000013 on USAspending (opens in a new tab) | Coefficient Systems Testing, Inc | $160 | 1 | Not competed Open to all |
| Oct 18, 2024 | Title: 25-S-032/Tigua/Shampoo Carpets/Face 15DDNE25P00000002 on USAspending (opens in a new tab) | Tigua Enterprises Inc | $150 | 1 | Not competed Open to all |
| Sep 24, 2024 | Title: 24-S-209/PC Automated/Emergency Repair 15DDNE24F00000013 on USAspending (opens in a new tab) | PC Automated Controls, Inc. | $5,010 | 1 | Order (multiple-award IDIQ) Open to all |
| Jun 18, 2024 | For the Following Miscellaneous Electrical Work Throughout the Building to Replace One Light Fixture in Wall Corridor, Area 4. Government to Furnish Fixture. 15DDNE24P00000011 on USAspending (opens in a new tab) Equipment purchase | Individual contractor (name withheld) | $1,800 | 1 | Not competed Open to all |
| Jan 23, 2024 | During a Recent Scheduled Preventative Maintenance Visit a Technician Found That the Condenser Coil on Carrier Chiller #1 Had Oils Stains Near the Manifold. In Order for the Chiller to Work at Full Capacity, That Condenser Coil Needs to Be Replaced. 15DDNE24P00000003 on USAspending (opens in a new tab) | PC Automated Controls, Inc. | $6,612 | 1 | Competed Woman-owned |
| Nov 30, 2023 | To Repair the Following: Fix Flashing Light at Entry, Remove Power Pole in Room 217, Fix Wall Packs, Relocate Red Indicator Light Around Corner of Column in Room 342, Install 3 Receptacles for New TV, and Change Receptacle to A Quad in Warehouse. 15DDNE24P00000001 on USAspending (opens in a new tab) | Coefficient Systems Testing, Inc | $2,495 | 1 | Not competed Open to all |
| Jul 7, 2023 | Chiller #3 Is Running at 50%. By Repairing the Parts, the Unit Will Be Back on-Line at 100% 24/7. This Unit Provides Cold Water to Area 2: Watch-OPS, Air Watch, LPR and S&L Units. 15DDNE23P00000048 on USAspending (opens in a new tab) | PC Automated Controls, Inc. | $5,019 | 1 | Competed Open to all |
| Apr 21, 2023 | To Run a New Electrical Circuit for an Outlet in the Air Watch Section. This Outlet Is for a New World Clock That Has Several Times on it for Them to Track Down Commercial and Federal Flight Routes That Are Been Investigated Throughout the World. 15DDNE23P00000033 on USAspending (opens in a new tab) | Coefficient Systems Testing, Inc | $1,110 | 1 | Not competed Open to all |
| Apr 10, 2023 | Request Funding for: Installation of New Cabling into Cubicles, So Each Get 4 and 2 Class, Install New Surface Mount Boxes for the Existing Cabling That Was Tested. 15DDNE23P00000027 on USAspending (opens in a new tab) Equipment purchase | Individual contractor (name withheld) | $7,578 | 1 | Competed Woman-owned |
| Mar 27, 2023 | To Run HDMI Cables from the Workstations to the TVS on the Walls for the New Area of the Air Watch. 15DDNE23P00000025 on USAspending (opens in a new tab) Equipment purchase | Individual contractor (name withheld) | $1,180 | 1 | Not competed Open to all |
| Mar 22, 2023 | Request to Install Box Over Broken Pole Light Wiring and to Inspect Site Lighting Pole Bases for Signs of Stress and Loose Hardware. 15DDNE23P00000024 on USAspending (opens in a new tab) | Coefficient Systems Testing, Inc | $1,180 | 1 | Not competed Open to all |
| Feb 28, 2023 | To Replace the Boiler Panel System for the HVAC Located on the Roof on-Line. At the Moment the System Is on Hand and Needs to Be on-Auto 24/7. 15DDNE23P00000016 on USAspending (opens in a new tab) | PC Automated Controls, Inc. | $11,775 | 1 | Competed Open to all |
| Feb 24, 2023 | For the Electrical Work for the Relocation of 5 TVS from the Air Watch into the Diversion Area. 15DDNE23P00000013 on USAspending (opens in a new tab) | Coefficient Systems Testing, Inc | $1,500 | 1 | Not competed Open to all |
| Feb 22, 2023 | To Furnish All Labor and Materials Required for a Complete Electrical Installation of the Following: Troubleshoot & Repair (4) LED Wall Pack Fixtures. 15DDNE23P00000012 on USAspending (opens in a new tab) | Coefficient Systems Testing, Inc | $1,700 | 1 | Not competed Open to all |
| Feb 21, 2023 | During a Recent Service Visit, Technicians Diagnosed a Failed Motor on Carrier Chilled Water Pump Motor #2. Remove and Dispose Old Motor and Install a New OEM Motor Part #HD65GZ653. 15DDNE23P00000011 on USAspending (opens in a new tab) | PC Automated Controls, Inc. | $5,119 | 1 | Competed Woman-owned |
| Dec 8, 2022 | Services Are Needed to Unclog the Sewage System for Area 1 (M-F Bathrooms and Break Room). It Will Be Paid by Credit Card 15DDNE23P00000003 on USAspending (opens in a new tab) | Individual contractor (name withheld) | $1,469 | 1 | Not competed Open to all |
| Oct 12, 2022 | Replacement on Bad Memory Board on EPIC Chiller 3, to Include Bad Circuit B2 Compressor, and Replace the Burnt-Out Refrigerant. 15DDNE23P00000001 on USAspending (opens in a new tab) | PC Automated Controls, Inc. | $10,962 | 1 | Competed Woman-owned |
| Sep 21, 2022 | To Relocate the Red-Lights in the Hallways from the Old Security Office to the New Area. Underground Wiring Is Needed to Restore the on-Line the Perimeter Lighting System. 15DDNE22P00000039 on USAspending (opens in a new tab) | Coefficient Systems Testing, Inc | $2,130 | 1 | Not competed Open to all |
| Jun 21, 2022 | Replace Existing Sewage Lift Station. 15DDNE22P00000020 on USAspending (opens in a new tab) Equipment purchase | Coefficient Systems Testing, Inc | $13,970 | 1 | Not competed Open to all |
| Jun 21, 2022 | Rebuild Two AC Blower Motors That Were Recently Replaced. These Are Spare Motors That Will Be Stored on-Site in Case of a Future Breakdown. This Will Eliminate the Building Being Without AC Period of Time. 15DDNE22P00000021 on USAspending (opens in a new tab) | PC Automated Controls, Inc. | $4,480 | 1 | Competed Open to all |
| Feb 23, 2022 | Request Funding for the Repair of the Perimeter Lighting System. The Lighting System Is 31 Years Old and the Underground Electrical Wiring Needs Replacement to Prevent Any Future Problems Like the Issues We Have Experienced the Last Few Months. 15DDNE22P00000009 on USAspending (opens in a new tab) | Coefficient Systems Testing, Inc | $9,810 | 1 | Not competed Open to all |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
Who won
Companies with the most priced awards here, FY2021–FY2025.
| # | Company | Awards | Total value at award |
|---|---|---|---|
| 1 | Coefficient Systems Testing, Inc | 11 | $38,172 |
| 2 | PC Automated Controls, Inc. | 8 | $58,956 |
| 3 | Tigua Enterprises Inc | 1 | $150 |
How the work was bought
Competition
Was the work open to bids?
- Not competed 14 (67%)
Sole-source: only one company was asked.
- Competed 6 (29%)
A standalone contract that was open to bids.
- Order (multiple-award IDIQ) 1 (5%)
A task order placed under an IDIQ held by several companies, who competed for it.
Set-asides
Set-aside = reserved for a group of businesses.
- Open to all 18 (86%)
No set-aside: any size of business could bid.
- Woman-owned 3 (14%)
Reserved for woman-owned small businesses (WOSB/EDWOSB).
Left out of the numbers above: 5 equipment purchases. Why?
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| GS21F016GA | Multiple-award | 1 | Nov 30, 2031 |
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.