Contractor · based in Virginia
Bsa Contractors LLC: federal contracts won
UEI H9WQUXTJLFZ9
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Sep 21, 2026. Data status
Typical award won (median)
$839,588
The middle of 9 priced awards, FY2021–FY2025.
Typical bids faced
–
No bid counts reported for these awards.
Won as a small business
–
Not enough priced awards to show a share.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Bsa Contractors LLC was $840k (FY2021-FY2025, 9 priced awards).
- Its most frequent buyer was GSA PBS Region 11 Special Programs Division White House Branch (9 priced awards in FY2021-FY2025).
- There were 10 construction & facilities awards won by Bsa Contractors LLC in FY2021-FY2025; 9 had a usable price.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work near you
Includes competitor tracking: follow Bsa Contractors LLC and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 1 award
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2022 | 1 | – |
| FY2023 | 1 | – |
| FY2024 | 6 | $736,847 |
| FY2025 | 1 | – |
| FY2026 (provisional) | 2 | – |
Award sizes
- Holds the median award, $839,588
Recent awards won
The latest 12 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Jul 2, 2026 | TRB Restroom Renovation and Workstation Powering Project - Design-Build DC0082ZZ 47PH5426C0021 on USAspending (opens in a new tab) | $1,850,123 | 1 | Not competed 8(a) |
| Jun 29, 2026 | Emergency NTP - Exterior Refresh 47PH5426P0006 on USAspending (opens in a new tab) | $538,500 | 1 | Not competed Open to all |
| Jan 17, 2025 | The Purpose of This Procurement Is for the NEOB SB235 CRAC Unit Replacement Located, Washington DC 20503. 47PM1025C0003 on USAspending (opens in a new tab) | $392,998 | 1 | Not competed 8(a) |
| Sep 18, 2024 | NEOB SB226 CRAC Units Replacements, Washington, DC Pop 9/28/2024 to 7/29/2025 47PM1024C0022 on USAspending (opens in a new tab) | $634,106 | 1 | Not competed 8(a) |
| Apr 25, 2024 | This Project Is for NEOB Parking Garage Slab Repairs Located, NW Washington DC 20503. 47PM1024C0012 on USAspending (opens in a new tab) Equipment purchase | $3,332,252 | 1 | Not competed 8(a) |
| Feb 1, 2024 | 47PM1024C0011 Jbab 485 Air-Cooled Chillers Replacement Anacostia Naval Station Washington DC 20373. 47PM1024C0011 on USAspending (opens in a new tab) | $1,851,778 | 1 | Not competed 8(a) |
| Dec 22, 2023 | Marble Flooring Installation at the East Wing. Pop Is 360 Calendar Days from Issuance of NTP After Acceptance of Bonds. 47PM1024C0008 on USAspending (opens in a new tab) | $839,588 | 1 | Not competed 8(a) |
| Nov 8, 2023 | Contract No.47PM1023C0023, This Project Is Intended to Upgrade the Existing Lighting in the Warehouse to LED Lighting to Reduce the Power Load and Achieve Savings in the Electrical Costs, SW Washington, DC 20032. 47PM1024C0005 on USAspending (opens in a new tab) | $96,084 | 1 | Not competed 8(a) |
| Nov 1, 2023 | HVAC Rooftop Units Replacement on Buildings 410 and 411 at Joint Base Anacostia-Bolling 47PM1024C0004 on USAspending (opens in a new tab) | $2,056,854 | 1 | Not competed 8(a) |
| Oct 24, 2023 | NEOB Condenser & Condensate Pump Replacement 47PM1024C0002 on USAspending (opens in a new tab) | $552,019 | 1 | Not competed 8(a) |
| May 5, 2023 | EEOB NW Dome Restoration, Wash DC 47PM1023C0010 on USAspending (opens in a new tab) | $1,567,598 | 1 | Not competed 8(a) |
| Mar 2, 2022 | EEOB South Facade Repointing Project. 47PM1022C0003 on USAspending (opens in a new tab) | $1,648,926 | 1 | Not competed 8(a) |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Not competed 9 (100%)
Sole-source: only one company was asked.
Set-asides
Set-aside = reserved for a group of businesses.
- 8(a) 9 (100%)
Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.
Left out of the numbers above: 1 equipment purchase. Why?
Who they work for
Similar contractors
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.