Contractor · based in Minnesota
Hamline Construction Inc: federal contracts won
UEI NLGJDBPXKN84
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Typical award won (median)
$100,639
The middle of 73 priced awards, FY2021–FY2025. Half were between $48.7k and $336k.
Typical bids faced
3
Median bids per award, reported for 65 of 65 competed awards. 20% drew only one bid.
Won as a small business
100%
Share of the 73 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Hamline Construction Inc was $101k (FY2021-FY2025, 73 priced awards).
- That is 91% higher than the median for all construction & facilities work nationwide ($52.8k).
- Competed awards drew a median of 3 offers (reported for 65 of 65).
- 20% of competed awards drew only one offer.
- In FY2025 the middle award was $159k, up 137% from FY2024 ($67k).
- Tip 81% of these awards were task orders under multiple-award contracts (MATOCs). To compete for those, you first need a spot on one of the umbrella contracts.
- Tip 100% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work near you
Includes competitor tracking: follow Hamline Construction Inc and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 12 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 18 | $65,871 |
| FY2017 | 17 | $33,890 |
| FY2018 | 22 | $121,442 |
| FY2019 | 20 | $66,808 |
| FY2020 | 17 | $77,717 |
| FY2021 | 19 | $76,170 |
| FY2022 | 14 | $148,534 |
| FY2023 | 11 | $241,144 |
| FY2024 | 17 | $66,972 |
| FY2025 | 12 | $158,575 |
| FY2026 (provisional) | 15 | $139,766 |
Award sizes
- Holds the median award, $100,639
Recent awards won
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Oct 7, 2026 | Perform Variable Air Volume Box Replacement Diana Murphy Courthouse Minneapolis, MN. 47PD5327F0004 on USAspending (opens in a new tab) Provisional | $3,163,938 | 1 | Order (multiple-award IDIQ) Small business |
| Oct 2, 2026 | Replacement of UPS System at the Warren E. Burger Federal Building, St. Paul, MN 55101 47PD5327F0001 on USAspending (opens in a new tab) Provisional | $115,831 | 5 | Order (multiple-award IDIQ) Small business |
| Sep 18, 2026 | Common Area Refresh for Ground and First Floor, Bishop Henry Whipple Federal Building, Fort Snelling, MN 47PD5326F0364 on USAspending (opens in a new tab) Provisional | $154,872 | 3 | Order (multiple-award IDIQ) Small business |
| Sep 2, 2026 | Project to Replace the Two Existing Rooftop Units for Courtroom 1 and 2 That Are Located in the Attic Space of the Edward J. Devitt Federal Building, Fergus Falls, MN 56537 47PD5326F0342 on USAspending (opens in a new tab) Provisional | $202,954 | 2 | Order (multiple-award IDIQ) Small business |
| Aug 20, 2026 | Burger District Cooling Heat Exchangers Warren Burger Federal Building and United States Courthouse, Saint Paul, Minnesota Courthouse St Paul, Minnesota 55101 47PD5326F0333 on USAspending (opens in a new tab) Provisional | $855,960 | 3 | Order (multiple-award IDIQ) Small business |
| Aug 3, 2026 | Project for the Geothermal Circuit Leak at the Whipple Federal Building, Fort Snelling, MN 55111 47PD5326F0319 on USAspending (opens in a new tab) Provisional | $125,144 | 4 | Order (multiple-award IDIQ) Small business |
| Jul 27, 2026 | Project Is to Repair/Replace Water Damage to Its Prior State for Passports Office Space Due to A Burst Pipe. Federal Office Building, Minneapolis, MN 55401 47PD5326F0302 on USAspending (opens in a new tab) Provisional | $139,766 | 1 | Order (multiple-award IDIQ) Small business |
| Jul 14, 2026 | Replace East Sidewalk, Minneapolis Federal Office Building, South, Minneapolis, Minnesota 55401 47PD5326F0269 on USAspending (opens in a new tab) Provisional | $186,813 | 4 | Order (multiple-award IDIQ) Small business |
| Jun 22, 2026 | Replace the Existing 3 Boilers with 2 New Boilers. New Boilers Shall Be Designed for Interior Installation and Must Be Able to Function Peer-to-Peer with the Other Boiler. To Include Isolation Valves for Each Boiler. W912LM26FA038 on USAspending (opens in a new tab) | $246,260 | 3 | Order (multiple-award IDIQ) Small business |
| Jun 12, 2026 | The Purpose of This Project Is to Provide Renovation and Alteration for Chambers 724 at the Warren E. Burger Federal Building & U.S. Courthouse St. Paul, MN 55101 47PD5326F0214 on USAspending (opens in a new tab) | $148,529 | 1 | Order (multiple-award IDIQ) Small business |
| May 5, 2026 | Water Heater DDC and Kill Switch W912LM26FA030 on USAspending (opens in a new tab) | $138,889 | 1 | Order (multiple-award IDIQ) Small business |
| Apr 16, 2026 | General Contractor Is to Provide All Labor, Materials, Equipment, and Supervision for a Project Located at Edward J. Devitt U.S. Courthouse & Federal Building, Fergus Falls, MN 56537 47PD5326F0141 on USAspending (opens in a new tab) | $100,763 | 2 | Order (multiple-award IDIQ) Small business |
| Apr 1, 2026 | B656 Boiler Replacement W912LM26FA020 on USAspending (opens in a new tab) | $92,232 | 2 | Order (multiple-award IDIQ) Small business |
| Apr 1, 2026 | B683 Water Heaters W912LM26FA021 on USAspending (opens in a new tab) | $6,986 | 3 | Order (multiple-award IDIQ) Small business |
| Mar 23, 2026 | General Contractor Is to Provide All Labor, Materials, Equipment, and Supervision for a Project on the Chambers 2A Carpet Install, St. Paul, MN 55101 47PD5326F0109 on USAspending (opens in a new tab) | $33,791 | 3 | Order (multiple-award IDIQ) Small business |
| Mar 4, 2026 | General Contractor Is to Provide All Labor, Materials, Equipment, and Supervision for a Project on the 4TH Floor at the Bishop Henry Whipple Federal Building, Fort Snelling, MN 55111. 47PD5326F0097 on USAspending (opens in a new tab) | $208,291 | 2 | Order (multiple-award IDIQ) Small business |
| Nov 25, 2025 | VA Doghouse Floor Box Replacement, Whipple Federal Building, Fort Snelling, MN the Purpose of This Project Is to Demolish the Existing 20 Containing Power and Data in Room G303. Replace Floor Boxes Matching Those in Room G304. 47PE5426F0014 on USAspending (opens in a new tab) | $31,878 | 4 | Order (multiple-award IDIQ) Small business |
| Sep 30, 2025 | B687 Replacement Boilers W912LM25FA073 on USAspending (opens in a new tab) | $83,296 | 1 | Order (multiple-award IDIQ) Small business |
| Sep 30, 2025 | QJKL242003 Manual Transfer Switch W912LM25FA074 on USAspending (opens in a new tab) | $168,700 | 2 | Order (multiple-award IDIQ) Small business |
| Sep 30, 2025 | B642 Replacement Windows W912LM25FA077 on USAspending (opens in a new tab) | $630,030 | 3 | Order (multiple-award IDIQ) Small business |
| Jul 25, 2025 | Chambers Alterations, Diana Murphy Courthouse, Minneapolis, MN the Purpose of This Project Is to Remodel Chambers 9W, 9E, 11W, 14W, and 11TH Floor Law Library 47PF0025F0501 on USAspending (opens in a new tab) | $496,946 | 2 | Order (multiple-award IDIQ) Small business |
| May 20, 2025 | B685 Hangar Windows W912LM25FA035 on USAspending (opens in a new tab) | $123,700 | 2 | Order (multiple-award IDIQ) Small business |
| May 15, 2025 | Apron LED Floodlights W912LM25FA032 on USAspending (opens in a new tab) | $148,449 | 4 | Order (multiple-award IDIQ) Small business |
| May 14, 2025 | Repair or alteration of office buildings W912LM25FA031 on USAspending (opens in a new tab) | $77,480 | 4 | Order (multiple-award IDIQ) Small business |
| Apr 15, 2025 | The Purpose of This Project Is to Replace the Existing Light Controllers at the Warren E. Burger Federal Building and U.S. Courthouse in St Paul, MN. 47PF0025F0373 on USAspending (opens in a new tab) | $352,950 | 5 | Order (multiple-award IDIQ) Small business |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Order (multiple-award IDIQ) 59 (81%)
A task order placed under an IDIQ held by several companies, who competed for it.
- Order (single-award IDIQ) 8 (11%)
A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.
- Competed 6 (8%)
A standalone contract that was open to bids.
Set-asides
Set-aside = reserved for a group of businesses.
- Small business 73 (100%)
Only small businesses could bid.
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| 47PF0019D0070 | Multiple-award The IDIQ drew 21 offers | 35 | Feb 2, 2025 |
| W912LM23D1002 | Multiple-award The IDIQ drew 9 offers | 16 | Feb 9, 2028 |
| W912LM16D0002 | Single-award The IDIQ drew 10 offers | 8 | Oct 28, 2021 |
| 47PF0018D0069 | Multiple-award The IDIQ drew 27 offers | 6 | Dec 3, 2024 |
| 47PF0024D0044 | Multiple-award The IDIQ drew 49 offers | 2 | Nov 14, 2026 |
Similar contractors
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.