Contractor · based in Minnesota

Loeffel Engstrand Corp: federal contracts won

UEI SD63JT6S7RF5

Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status

Typical award won (median)

$68,881

The middle of 18 priced awards, FY2021–FY2025. Half were between $34.6k and $120k.

Typical bids faced

–

Too few awards report bids (2 of 2) to show a typical number.

Won as a small business

100%

Share of the 18 priced awards.

Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.

What this means

  • The middle construction & facilities award won by Loeffel Engstrand Corp was $68.9k (FY2021-FY2025, 18 priced awards).
  • That is 30% higher than the median for all construction & facilities work nationwide ($52.8k).
  • Its most frequent buyer was GSA PBS Region 5 Acquisition Management Division (9 priced awards in FY2021-FY2025).
  • 28% of its priced awards were within 100 miles of its home base.
  • 39% of priced awards were task orders under IDIQ contracts.
  • Tip 100% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.

FedComps Pro · coming soon · free waitlist

Get alerts for new building construction work near you

Includes competitor tracking: follow Loeffel Engstrand Corp and the other companies you bid against.

  • Alerts that say if a bid is worth it
  • Deadline and amendment alerts
  • Recompete radar
  • Plain-English bid summaries
  • Competitor tracking
  • Unlimited saved searches

Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing

Your sign-up did not go through. Please check your email and ZIP code and try again. The spam check needs JavaScript turned on.

Add your company (optional)

We only email you about the launch. Delete your details any time.

Awards per year

Column chart of awards per fiscal year, FY2016 to FY2026. FY2025, the latest full year: no awards. Most in one year: 10 awards in FY2021. FY2026 is still being reported. 0 2 4 6 8 10 2016 ’16 2017 ’17 2018 ’18 2019 ’19 2020 ’20 2021 ’21 2022 ’22 2023 ’23 2024 ’24 2025 ’25 2026 ’26
  • FY2025, the latest full year: no awards
  • FY2026 is still being reported
Federal fiscal years run October to September.
Show the numbers
YearAwardsMedian award
FY2016 1 –
FY2017 2 –
FY2018 1 –
FY2019 7 $73,601
FY2020 9 $22,390
FY2021 10 $41,010
FY2022 5 $124,433
FY2023 3 –
FY2024 0 –
FY2025 0 –
FY2026 (provisional) 0 –

Award sizes

Bar chart of priced awards FY2021–FY2025 by size. The most common size was $25k to $250k (12 awards). The median award, $68,881, is in the $25k to $250k band. Under $25k 3 $25k to $250k 12 $250k to $1M 3 $1M to $5M 0 $5M to $25M 0 Over $25M 0
  • Holds the median award, $68,881
Priced awards FY2021–FY2025, by value at award.

Recent awards won

The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.

Project How it was awarded
Apr 21, 2023 New Task Order Off IDIQ Contract for Construction of a Concrete Parking Slab in Accordance with the Attached Statement of Work. 68HERC23F0272 on USAspending (opens in a new tab) Offers from IDIQ $255,511 1 from the IDIQ Order (single-award IDIQ) 8(a)
Apr 18, 2023 Order Off IDIQ Contract for Extension of Utility Services in Accordance with the Attached Statement of Work. 68HERC23F0262 on USAspending (opens in a new tab) Offers from IDIQ $291,492 1 from the IDIQ Order (single-award IDIQ) 8(a)
Feb 15, 2023 Exterior Water Tower Updates and Maintenance Task Order Against IDIQ for Construction Support in Accordance with the Statement of Work. 68HERC23F0174 on USAspending (opens in a new tab) Offers from IDIQ $94,787 1 from the IDIQ Order (single-award IDIQ) 8(a)
Aug 23, 2022 Sidewalk and AHU-1 Coil Repair at the U.S. EPA Duluth, MN Great Lakes Toxicology and Ecology Division Labs in Accordance with the Statement of Work. 68HERC22F0474 on USAspending (opens in a new tab) Offers from IDIQ $67,772 1 from the IDIQ Order (single-award IDIQ) 8(a)
Jul 27, 2022 Contractor Shall Provide All Equipment, Labor, Materials, and Supervision Necessary Fill in Cracks, Reseal and Stripe Both North and South Parking Lots at the Federal Building in Eau Claire, WI. 47PF0022C0021 on USAspending (opens in a new tab) $23,431 1 Not competed 8(a)
Jul 27, 2022 Eau Claire Masonry Cleaning and Repair, Eau Claire WI Fed BLDG & US Cthse, Commons Eau Claire, WI 47PF0022C0022 on USAspending (opens in a new tab) $144,092 1 Not competed 8(a)
Jul 8, 2022 Interior Water Tower Update and Renovation in Accordance with the Statement of Work at Great Lakes Toxicology and Ecology Division Facility, Duluth, MN 55804 68HERC22F0389 on USAspending (opens in a new tab) Offers from IDIQ $124,433 1 from the IDIQ Order (single-award IDIQ) 8(a)
Mar 4, 2022 Alterations and Modifications at Chambers on 14TH and 15TH Floor at the Diana E. Murphy US Courthouse in Minneapolis, MN 47PF0022C0006 on USAspending (opens in a new tab) $449,842 1 Not competed 8(a)
Sep 28, 2021 Replace Batteries in Large Battery Backup Robert W Kastenmeier Courthouse Madison WI 53703 Building Number WI0350ZZ 47PF0021C0062 on USAspending (opens in a new tab) $33,663 1 Not competed 8(a)
Sep 23, 2021 Build Out a Lactation Room Within Existing Space and Renovate (2) Additional Rooms at the Federal Office Building in Minneapolis, MN. 47PF0021C0060 on USAspending (opens in a new tab) $44,673 1 Not competed 8(a)
Sep 1, 2021 HVAC Control System for STP ATCT - St. Paul Air Traffic Control Tower 697DCK21C00281 on USAspending (opens in a new tab) $37,348 1 Competed Small business
Aug 12, 2021 Install and Upgrade Facility Safety Requirements, Including Anti-Slip Stair Material, an Updated Fire Panel, and A Hazmat Containment Subfloor in Accordance with the Statement of Work. 68HERC21F0343 on USAspending (opens in a new tab) Offers from IDIQ $51,830 1 from the IDIQ Order (single-award IDIQ) 8(a)
Jul 7, 2021 Relocate Existing Coil Unit Piping 3FT Clear of Basement Windows, Remove Wall Convector Units and Associated Piping, Relocate and Reconfigure Coil Unit Piping, and Replace with Ceiling Convector Units at the Fed Courthouse in Eau Claire, WI. 47PF0021C0038 on USAspending (opens in a new tab) $24,764 1 Not competed 8(a)
Jun 21, 2021 Cab HVAC per Attached SOW. 21002385 and Replace Cab HVAC at Mic per Attached SOW. 21002386. 697DCK21C00162 on USAspending (opens in a new tab) $69,990 1 Competed Small business
Jun 15, 2021 Demo Existing MAU/AHU and Install a New Air Handle Unit (AHU) at the U.S. EPA Facility Located. Duluth, MN 55804, in Accordance with the Attached Statement of Work. 68HERC21F0267 on USAspending (opens in a new tab) Offers from IDIQ $95,882 1 from the IDIQ Order (single-award IDIQ) 8(a)
Jun 9, 2021 Update the Millwork in the HSI Breakroom at the G. W. Heaney Federal Building and U. In Duluth, MN. 47PF0021C0033 on USAspending (opens in a new tab) $13,803 1 Not competed 8(a)
May 12, 2021 Repaint and Recarpet Rooms B3 and B5, Add Lactation Room at the Eau Claire Federal Building & Courthouse Commons, Eau Claire, WI 54701. 47PF0021C0029 on USAspending (opens in a new tab) $30,188 1 Not competed 8(a)
Mar 25, 2021 Interior Lighting Upgrade at the Social Security Administration Building in Minneapolis, MN 47PF0021C0022 on USAspending (opens in a new tab) $105,577 1 Not competed 8(a)
Sep 17, 2020 This Award Is for Electrical Upgrades at Duluth, MN 55802. 47PF0020C0059 on USAspending (opens in a new tab) $10,860 1 Not competed Open to all
Sep 2, 2020 Upgrade 1ST Floor Corridor Lighting in the G.W. Heaney Federal Building in Duluth, MN. Work Includes Remove Existing Lighting, Furnish and Install 17 New LED Lights. 47PF0020C0052 on USAspending (opens in a new tab) $14,619 1 Not competed 8(a)
Sep 1, 2020 The Purpose of This Project Is to Repair Interior Damage Caused by Water Infiltration in Room B-13, Including Environmental Cleanup at the G. W Heaney Federal Building in Duluth, MN. 47PF0020C0051 on USAspending (opens in a new tab) $20,376 1 Not competed 8(a)
Jun 22, 2020 Install a 48'X12' Interior Wall and Related Work to Create a Collaborative Center Within the Current Space. Project Location Is the U.S. Environmental Protection Agency Laboratory Location, Duluth, MN 55804. 68HERC20F0250 on USAspending (opens in a new tab) Offers from IDIQ $81,161 1 from the IDIQ Order (single-award IDIQ) 8(a)
Apr 9, 2020 Roof Access Hatch Project, Federal Building&Courthouse, Eau Claire, WI. Furnish and Install a Roof Hatch and Ladder Arrangement from 1ST Floor Commons to Access Addition Roof or A Exterior Ladder System. 47PF0020C0026 on USAspending (opens in a new tab) $19,694 1 Not competed 8(a)
Mar 6, 2020 Contractor to Provide All Equipment, Labor, Materials, and Supervision Necessary to Construct an Electrical Closet at the Federal Building&U. In Eau Claire, WI 47PF0020C0018 on USAspending (opens in a new tab) $22,390 1 Not competed 8(a)
Mar 2, 2020 Station Suite Project Station in South Saint Paul, MN. Build Out 2 Separate Offices Within Open Space, Reconfigure HVAC As Necessary, and Install 4 New Outlets for Future Telework Stations. 47PF0020C0017 on USAspending (opens in a new tab) $23,333 1 Not competed 8(a)

Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.

How the work was bought

Competition

Was the work open to bids?

  • Not competed 9 (50%)

    Sole-source: only one company was asked.

  • Order (single-award IDIQ) 7 (39%)

    A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.

  • Competed 2 (11%)

    A standalone contract that was open to bids.

Set-asides

Set-aside = reserved for a group of businesses.

  • 8(a) 16 (89%)

    Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.

  • Small business 2 (11%)

    Only small businesses could bid.

Umbrella contracts used here

Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.

Contract Type Orders Ordering ends
EPC18012 Single-award The IDIQ drew 1 offers 7 Apr 21, 2023
Report an error on this page

Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.