Contractor · based in Mississippi
J & J Contractors Inc: federal contracts won
UEI CCJGA32ZSHV6
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Typical award won (median)
$185,779
The middle of 13 priced awards, FY2021–FY2025. Half were between $81.3k and $270k.
Typical bids faced
2
Median bids per award, reported for 13 of 13 competed awards. 0% drew only one bid.
Won as a small business
100%
Share of the 13 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by J & J Contractors Inc was $186k (FY2021-FY2025, 13 priced awards).
- That is 3.5 times the median for all construction & facilities work nationwide ($52.8k).
- Competed awards drew a median of 2 offers (reported for 13 of 13).
- 0% of competed awards drew only one offer.
- Its most frequent buyer was Mississippi Air National Guard 186th Wing (USPFO) (13 priced awards in FY2021-FY2025).
- Tip 100% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
- Tip The typical award drew only 2 bids. Less competition can mean a better chance for a new bidder.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work near you
Includes competitor tracking: follow J & J Contractors Inc and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: no awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 7 | $91,153 |
| FY2017 | 6 | $117,452 |
| FY2018 | 11 | $167,690 |
| FY2019 | 6 | $135,498 |
| FY2020 | 5 | $79,076 |
| FY2021 | 6 | $100,626 |
| FY2022 | 3 | – |
| FY2023 | 4 | – |
| FY2024 | 0 | – |
| FY2025 | 0 | – |
| FY2026 (provisional) | 0 | – |
Award sizes
- Holds the median award, $185,779
Recent awards won
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Sep 27, 2023 | MDVL232127 - Repair Simulator Facility BLDG. 135 W50S7J23F0060 on USAspending (opens in a new tab) | $1,015,000 | 2 | Order (multiple-award IDIQ) Small business |
| Sep 13, 2023 | MDVL232103 - Remove POL OWS & Construct Retention Basin W50S7J23F0059 on USAspending (opens in a new tab) | $193,651 | 2 | Order (multiple-award IDIQ) Small business |
| Jul 28, 2023 | MDVL042061 - Repair Fire Suppression System in BLDGS 150, 151, and 160 at the 186TH ARW W50S7J23C0002 on USAspending (opens in a new tab) | $3,510,057 | 4 | Competed Small business |
| May 31, 2023 | MDVL212112 - Replace Chiller and Components in DFAC BLDG. 204 W50S7J23F0045 on USAspending (opens in a new tab) | $381,257 | 7 | Order (multiple-award IDIQ) Small business |
| Jan 3, 2023 | Minimum Guarantee-IDIQ for Construction W9127Q23F0028 on USAspending (opens in a new tab) Cancelled / $0 | $2,000 | 1 | Order (multiple-award IDIQ) Small business |
| Sep 21, 2022 | MDVL132046 - Repair Firestation Roof BLDG. 155 W50S7J22C0007 on USAspending (opens in a new tab) | $269,981 | 2 | Competed Small business |
| Aug 17, 2022 | MDVL222105 - Construct Restroom in Intel Vault BLDG. 308 W50S7J22C0005 on USAspending (opens in a new tab) | $64,155 | 2 | Competed Small business |
| Aug 16, 2022 | MDVL222104 - Renovate Squad OPS Restroom at BLDG. 308 W50S7J22C0004 on USAspending (opens in a new tab) | $148,752 | 2 | Competed Small business |
| Sep 21, 2021 | MDVL192112 - Replace Generator for Command Post and Intel W50S7J21C0011 on USAspending (opens in a new tab) | $67,155 | 2 | Competed Small business |
| Sep 11, 2021 | MDVL212109 - Replace Air Handling Unit at BLDG. 705 W50S7J21C0010 on USAspending (opens in a new tab) | $120,000 | 2 | Competed Small business |
| Sep 9, 2021 | MDVL212111 - Renovate Office and Classroom at BLDG. 603 W50S7J21C0009 on USAspending (opens in a new tab) | $81,252 | 2 | Competed Small business |
| Aug 25, 2021 | MDVL192129 - Repair Fire Suppression SYS W50S7J21C0007 on USAspending (opens in a new tab) | $220,000 | 2 | Competed Small business |
| Apr 14, 2021 | 212105 - Renovate Maintenance W50S7J21C0005 on USAspending (opens in a new tab) | $185,779 | 4 | Competed Small business |
| Jan 22, 2021 | MDVL212100 - Repair Storm Drainage South W50S7J21C0002 on USAspending (opens in a new tab) | $56,458 | 4 | Competed Small business |
| Feb 14, 2020 | MDVL132045 - Repair Roof Lower Hangar Bay and Admin Wing BLDG. 150 W50S7J20F0019 on USAspending (opens in a new tab) | $592,094 | 5 | Order (multiple-award IDIQ) Small business |
| Feb 14, 2020 | MDVL202025 - Addition to Air Operations Group Facility BLDG. 104 W50S7J20F0020 on USAspending (opens in a new tab) | $1,625,014 | 1 | Order (multiple-award IDIQ) Small business |
| Feb 13, 2020 | MDVL192103 - Upgrade Perimeter Fence W50S7J20F0018 on USAspending (opens in a new tab) | $79,076 | 2 | Order (multiple-award IDIQ) Small business |
| Jan 14, 2020 | MDVL192100 - Repair EFIS Columns at Clin W50S7J20F0012 on USAspending (opens in a new tab) | $29,980 | 1 | Order (multiple-award IDIQ) Small business |
| Dec 10, 2019 | MDVL202103 - Erect Flag Poles and Site I W50S7J20C0002 on USAspending (opens in a new tab) | $20,962 | 3 | Competed Small business |
| Sep 28, 2019 | MDVL192116 - Resurface Asphalt Pavement W9127Q19F5035 on USAspending (opens in a new tab) | $485,839 | 3 | Order (multiple-award IDIQ) Small business |
| Sep 12, 2019 | Install Backup Generator BLDG. 10 W9127Q19F5022 on USAspending (opens in a new tab) | $92,969 | 3 | Order (multiple-award IDIQ) Small business |
| Aug 21, 2019 | MDVL192125 Repair BLDG. 308 for Global ASNT W9127Q19F5128 on USAspending (opens in a new tab) | $675,324 | 2 | Order (multiple-award IDIQ) Small business |
| May 28, 2019 | (no description) W9127Q19P5016 on USAspending (opens in a new tab) | $24,950 | 3 | Competed Small business |
| Apr 11, 2019 | (no description) W9127Q19F5060 on USAspending (opens in a new tab) | $178,027 | 2 | Order (multiple-award IDIQ) Small business |
| Mar 13, 2019 | Repair Spalls Aircraft Apron MDVL192104 W9127Q19P5004 on USAspending (opens in a new tab) | $12,990 | 3 | Competed Small business |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Competed 10 (77%)
A standalone contract that was open to bids.
- Order (multiple-award IDIQ) 3 (23%)
A task order placed under an IDIQ held by several companies, who competed for it.
Set-asides
Set-aside = reserved for a group of businesses.
- Small business 13 (100%)
Only small businesses could bid.
Left out of the numbers above: 1 cancelled or $0 award. Why?
Who they work for
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| W9127Q23D0003 | Multiple-award The IDIQ drew 30 offers | 3 | Nov 30, 2027 |
Similar contractors
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.