Contractor · based in Michigan
Roemer Utility Services, LLC: federal contracts won
UEI TVPXR873MJG5
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Sep 21, 2026. Data status
Typical award won (median)
$28,222
The middle of 6 priced awards, FY2021–FY2025.
Typical bids faced
–
No bid counts reported for these awards.
Won as a small business
–
Not enough priced awards to show a share.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Roemer Utility Services, LLC was $28.2k (FY2021-FY2025, 6 priced awards).
- Its most frequent buyer was FWS Midwest Regional Office (3 priced awards in FY2021-FY2025).
- There were 6 construction & facilities awards won by Roemer Utility Services, LLC in FY2021-FY2025; 6 had a usable price.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work near you
Includes competitor tracking: follow Roemer Utility Services, LLC and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: no awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2019 | 1 | – |
| FY2020 | 33 | $28,500 |
| FY2021 | 5 | $28,244 |
| FY2022 | 1 | – |
| FY2023 | 0 | – |
| FY2024 | 0 | – |
| FY2025 | 0 | – |
| FY2026 (provisional) | 0 | – |
Award sizes
- Holds the median award, $28,222
Recent awards won
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Dec 6, 2021 | Detroit River Granite Contaminant Monument Supply and Install 140F0222P0012 on USAspending (opens in a new tab) | $6,930 | 1 | Not competed Open to all |
| Sep 9, 2021 | Detroit River Bore Bunkhouse Waterline 140F0221P0091 on USAspending (opens in a new tab) | $139,000 | 1 | Not competed Open to all |
| Jul 29, 2021 | Detroit River Men's Staff Restroom Sanitary Line Repairs 140F0221P0064 on USAspending (opens in a new tab) | $73,513 | 1 | Not competed Open to all |
| Jun 8, 2021 | Detroit River Investigate Bathroom Sewer, Magnetic Locks, and Other T&M Items 140F0321P0052 on USAspending (opens in a new tab) | $23,932 | 1 | Not competed Open to all |
| Jun 7, 2021 | Detroit River Install Electric Service to Gate, Alarm to Under Slab Vapor Detection System 140F0321P0051 on USAspending (opens in a new tab) | $28,244 | 1 | Not competed Open to all |
| Nov 7, 2020 | Detroit River Repair Concrete Cracks, VAC Hydrants, Lower Riser, and Other T&M Items 140F0321P0007 on USAspending (opens in a new tab) | $28,200 | 1 | Not competed Open to all |
| Sep 21, 2020 | Detroit River Concrete Slab Replacement, Landscaping, Seed, and Other T&M Items 140F0320P0178 on USAspending (opens in a new tab) | $64,500 | 1 | Not competed Open to all |
| Sep 9, 2020 | Detroit River Fan Installation for Under Slab Ventilation 140F0320P0138 on USAspending (opens in a new tab) | $13,610 | 1 | Not competed Open to all |
| Sep 9, 2020 | Detroit River Screen Fence 140F0320P0139 on USAspending (opens in a new tab) | $28,500 | 1 | Not competed Open to all |
| Sep 9, 2020 | Detroit River TUCK Pointing, Stone Caps, Concrete Caulking and Other T&M Items 140F0320P0141 on USAspending (opens in a new tab) | $43,500 | 1 | Not competed Open to all |
| Aug 31, 2020 | Detroit River T&M for June-Completion of MISC. Items and Other T&M Items 140F0320P0123 on USAspending (opens in a new tab) | $83,500 | 1 | Not competed Open to all |
| Aug 31, 2020 | Detroit River-Relocate, Bury and Cap Contaminated Soil, Relocate and Install Entry Boulders, Rainwater Tank Landscaping, Other T&M Site Work Items 140F0320P0124 on USAspending (opens in a new tab) | $38,500 | 1 | Not competed Open to all |
| Aug 13, 2020 | Detroit River Rainwater Overflow Pipe Installation 140F0320P0110 on USAspending (opens in a new tab) | $16,568 | 1 | Not competed Open to all |
| Aug 6, 2020 | Detroit River East Pond Change, East Pond Soil Testing 140F0320P0107 on USAspending (opens in a new tab) | $28,608 | 1 | Not competed Open to all |
| Jul 24, 2020 | Detroit River T&M for May#2-COMPLETION of MISC. Items, Rental, Other T&M Items 140F0320P0100 on USAspending (opens in a new tab) | $69,500 | 1 | Not competed Open to all |
| Jul 10, 2020 | Detroit River East Lined Storm Water Pond 140F0320P0094 on USAspending (opens in a new tab) | $144,780 | 1 | Not competed Open to all |
| Jul 10, 2020 | Detroit River T&M for May-Completion of MISC. Items, West Pond Change, Other T&M Items 140F0320P0095 on USAspending (opens in a new tab) | $78,500 | 1 | Not competed Open to all |
| May 29, 2020 | Detroit River Restoration of Bathroom Floors RMS 145/6 140F0320P0082 on USAspending (opens in a new tab) | $4,127 | 1 | Not competed Open to all |
| May 28, 2020 | Detroit River Observation Room 103 Wood Floor Refinishing 140F0320P0079 on USAspending (opens in a new tab) | $16,431 | 1 | Not competed Open to all |
| May 28, 2020 | Detroit River T&M for March Completion of MISC. Items 140F0320P0080 on USAspending (opens in a new tab) | $37,052 | 1 | Not competed Open to all |
| May 28, 2020 | Detroit River T&M Grading&Debris Cleanup 140F0320P0081 on USAspending (opens in a new tab) | $4,279 | 1 | Not competed Open to all |
| May 13, 2020 | Detroit River Energy Audit/Thermal Imaging 140F0320P0078 on USAspending (opens in a new tab) | $5,500 | 1 | Not competed Open to all |
| Apr 17, 2020 | Detroit River Blue Carpet Tile in Vestibule 142 140F0320P0076 on USAspending (opens in a new tab) | $5,242 | 1 | Not competed Open to all |
| Apr 3, 2020 | Detroit River T&M for March-Completion of MISC. Items 140F0320P0069 on USAspending (opens in a new tab) | $24,234 | 1 | Not competed Open to all |
| Apr 3, 2020 | Detroit River T&M for Electrical Work-Completion of MISC. Items 140F0320P0070 on USAspending (opens in a new tab) | $16,254 | 1 | Not competed Open to all |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Not competed 6 (100%)
Sole-source: only one company was asked.
Set-asides
Set-aside = reserved for a group of businesses.
- Open to all 6 (100%)
No set-aside: any size of business could bid.
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.