Base or VA center · Mississippi

Columbus Air Force Base: federal construction & facilities contracts

Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status

Open bids here now

No open bids here right now. Updated weekly from SAM.gov · data through Oct 25. Save this search

Typical award (median)

$348,750

The middle of 65 priced awards, FY2021–FY2025. Half were between $93.9k and $643k.

Typical number of bids

5

Median bids per award, reported for 40 of 40 competed awards. 3% drew only one bid.

Won by small businesses

97%

Share of the 65 priced awards.

Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.

What this means

  • The middle construction & facilities award at Columbus Air Force Base was $349k (FY2021-FY2025, 65 priced awards).
  • That is 5.2 times the median for all construction & facilities work in Mississippi ($66.6k).
  • Competed awards drew a median of 5 offers (reported for 40 of 40).
  • 3% of competed awards drew only one offer.
  • In FY2025 the middle award was $456k, up 136% from FY2024 ($193k).
  • Tip 95% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.

FedComps Pro · coming soon · free waitlist

Get alerts for new building construction work near Columbus Air Force Base

  • Alerts that say if a bid is worth it
  • Deadline and amendment alerts
  • Recompete radar
  • Plain-English bid summaries
  • Competitor tracking
  • Unlimited saved searches

Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing

Your sign-up did not go through. Please check your email and ZIP code and try again. The spam check needs JavaScript turned on.

Add your company (optional)

We only email you about the launch. Delete your details any time.

Awards per year

Column chart of awards per fiscal year, FY2016 to FY2026. FY2025, the latest full year: 18 awards. Most in one year: 20 awards in FY2018. FY2026 is still being reported. 0 5 10 15 20 2016 ’16 2017 ’17 2018 ’18 2019 ’19 2020 ’20 2021 ’21 2022 ’22 2023 ’23 2024 ’24 18 2025 ’25 2026 ’26
  • FY2025, the latest full year: 18 awards
  • FY2026 is still being reported
Federal fiscal years run October to September.
Show the numbers
YearAwardsMedian award
FY2016 9 $168,416
FY2017 8 $298,508
FY2018 20 $309,481
FY2019 9 $47,877
FY2020 14 $132,064
FY2021 9 $169,392
FY2022 8 $216,118
FY2023 16 $410,917
FY2024 14 $193,002
FY2025 18 $455,811
FY2026 (provisional) 4 –

Award sizes

Bar chart of priced awards FY2021–FY2025 by size. The most common size was $25k to $250k (25 awards). The median award, $348,750, is in the $250k to $1M band. Under $25k 5 $25k to $250k 25 $250k to $1M 22 $1M to $5M 7 $5M to $25M 6 Over $25M 0
  • Holds the median award, $348,750
Priced awards FY2021–FY2025, by value at award.

Recent awards

The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.

Project How it was awarded
Jul 9, 2026 Convert T1 Hangar to T7, B995 FA302226C0007 on USAspending (opens in a new tab) West Brothers Construction Inc $4,758,074 7 Competed Small business
Jun 26, 2026 Fiber Optic Cable B230 to B9511 FA302226P0011 on USAspending (opens in a new tab) Sunrise Network Solutions Inc $37,938 19 Competed Small business
Jun 18, 2026 Engineer, Furnish, Install, and Test the Upgrade of Premise Wiring Infrastructure to CAT-6 for the Building 704 (B704) at Columbus AFB, MS. FA302226P0009 on USAspending (opens in a new tab) Sunrise Network Solutions Inc $24,197 17 Competed Small business
Jun 18, 2026 Engineer, Furnish, Install, and Test the Upgrade of Premise Wiring Infrastructure to CAT-6 for the Buildings 246 (B246) and 414 (B414) at Columbus AFB, MS. FA302226P0010 on USAspending (opens in a new tab) Quad-Team Technical Services Inc $34,000 17 Competed Small business
Sep 29, 2025 The Contractor Must Provide All Plans, Labor, Equipment, Transportation, and Tools Required to Renovate a Space in B730, Accommodating of Sexual Assault, Prevention, and Response (SAPR) and the Integrated Prevention Workforce Offices. FA302225C0024 on USAspending (opens in a new tab) West Brothers Construction Inc $204,043 6 Competed Small business
Sep 25, 2025 This Requirement Removes Existing Premise Wiring in Buildings 1114 and 348, and Replaces it with Plenum-Rated CAT-6 Compliant Cables. FA302225P0019 on USAspending (opens in a new tab) JL Enterprises, LLC $36,755 17 Competed Small business
Sep 25, 2025 Contractor to Engineer, Furnish, Install, and Test (EFI and T) the Upgrade of Premise Wiring Infrastructure to CAT-6 for the Buildings 218 220.the Contractor Shall Also Be Required to Remove Existing Outdated Premise Wiring in This Building. FA302225P0023 on USAspending (opens in a new tab) DND Solutions LLC $60,181 10 Competed Small business
Sep 25, 2025 Premise Wiring B304 and B637 FA302225P0027 on USAspending (opens in a new tab) Equipment purchase Individual contractor (name withheld) $63,225 14 Competed Small business
Sep 25, 2025 Columbus AFB Has a Requirement for the Contractor to Engineer, Furnish, Install and Test the Upgrade of Wiring Infrastructure to CAT-6 for Building 1030 Iaw with the Respective Statement of Work. FA302225P0029 on USAspending (opens in a new tab) Southpaw Communications, Inc. $104,050 6 Competed Small business
Sep 24, 2025 The Intent of This Project Is to Replace All Mechanical/Plumbing Equipment in the Mechanical Room of B348 in Its Entirety, Except for the Boiler and Water Heater. FA302225C0009 on USAspending (opens in a new tab) Air Control Engineering Inc $780,000 6 Competed Small business
Sep 19, 2025 HUSH House Pad, Columbus AFB W9127825FA184 on USAspending (opens in a new tab) Approx. location Emr, Inc. $3,753,654 5 Order (multiple-award IDIQ) Small business
Sep 9, 2025 The Contractor Must Provide All, Labor, Material, Equipment, and Transportation Required to Replace a Condenser Pump Circulating Condenser Water from the Cooling Towers Supporting Building 268 of Columbus AFB, MS. FA302225P0016 on USAspending (opens in a new tab) Individual contractor (name withheld) $65,834 7 Competed Small business
Sep 5, 2025 Renovate Paint BARN FA302225C0022 on USAspending (opens in a new tab) West Brothers Construction Inc $5,233,696 2 Competed Small business
Aug 22, 2025 Convert Corrosion Control to 4-BAY T-7A Hangar FA302225C0021 on USAspending (opens in a new tab) Dominguez & Persons, LLC $10,672,395 7 Competed Small business
Aug 8, 2025 The Contractor Must Provide All Plant, Labor, Equipment, Transportation, and Tools Required to Complete a Full Replacement of the Backup Generators. This Shall Include Generators, the Fuel Pump, and the Automatic Transfer Switch (ATS). Refer to SOW. FA302225C0017 on USAspending (opens in a new tab) BDM Industrial Services LLC $240,191 6 Competed Small business
Aug 7, 2025 This Project Will Supply Adequate Storage for Maintenance Vehicles, Specifically the Installations Only Line Truck, to Prevent Damage from Inclement Weather and Ensure Work on Power Lines Can Be Safely Executed. FA302225C0012 on USAspending (opens in a new tab) Individual contractor (name withheld) $161,985 5 Competed Small business
Aug 6, 2025 Design, Furnish, and Install All Electrical Components Necessary to Provide Electricity and Power to Two (2) High Volume, Low Speed Ceiling Fans in Building 995 and B450. FA302225C0015 on USAspending (opens in a new tab) Individual contractor (name withheld) $435,000 2 Competed Small business
Jul 17, 2025 The Contractor Must Provide All Plant, Labor, Equipment, Transportation, and Tools Required to Complete the Renovation of B158 LRS Warehouse Iaw the SOW. FA302225C0013 on USAspending (opens in a new tab) Individual contractor (name withheld) $638,800 8 Competed Small business
Jun 24, 2025 Healthcare Environmental Cleaning Services at Redstone Arsenal and Columbus AFB HT940825F0025 on USAspending (opens in a new tab) Titan Facility Services LLC $643,163 5 Order (multiple-award IDIQ) Small business
Apr 8, 2025 Construct Egress Shop, Columbus Air Force Base, Mississippi W9127825FA010 on USAspending (opens in a new tab) Emr, Inc. $5,269,600 5 Order (multiple-award IDIQ) Small business
Feb 5, 2025 O&M Services- PM Columbus AFB W912DY25F0057 on USAspending (opens in a new tab) Brymak Fsi JV, LLC $418,172 5 Order (multiple-award IDIQ) Open to all
Jan 30, 2025 Repair HVAC and Electrical, B847 FA302225C0004 on USAspending (opens in a new tab) BDM Industrial Services LLC $607,256 4 Competed Small business
Dec 16, 2024 Expand and Renovate the Storage Area of the Hazardous Waste Storage Facility. FA302225C0003 on USAspending (opens in a new tab) BDM Industrial Services LLC $476,622 5 Competed Small business
Sep 28, 2024 The Main Objective of This Project Is to Repair the Dilapidated T-6 Flightline Shacks, Buildings 238, 240, 242, and 244. These Buildings Will Undergo Plumbing, Electrical, and Heating, Ventilation, and Air Conditioning, and Interior Repairs. FA302224F0022 on USAspending (opens in a new tab) Offers from IDIQ Heritage Construction LLC $261,005 4 from the IDIQ Order (single-award IDIQ) 8(a)
Sep 20, 2024 All Labor, Equipment, Transportation, and Tools Required a Full Renovation of B454 into Wash Rack. See Statement of Work (SOW), Electrical, Plumbing, Drywall, Iaw 100% Design, 100% Specs, and All Related Af Requirements and Other Codes and References FA302224C0016 on USAspending (opens in a new tab) Birmingham Industrial Construction, LLC $6,781,398 3 Competed Small business

Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.

Who won

Companies with the most priced awards here, FY2021–FY2025.

#CompanyAwardsTotal value at award
1 Heritage Construction LLC 9 $5,905,622
2 Sunrise Network Solutions Inc 9 $499,145
3 Pontchartrain Partners LLC 6 $2,403,929
4 BDM Industrial Services LLC 5 $2,145,902
5 West Brothers Construction Inc 3 $6,825,295
6 Emr, Inc. 2 $9,023,254
7 Copeland Contracting Company Inc 2 $7,204,193
8 Air Control Engineering Inc 2 $1,537,000
9 Dominguez & Persons, LLC 1 $10,672,395
10 Bates Engineers/Contractors Inc 1 $10,099,789

How the work was bought

Competition

Was the work open to bids?

  • Competed 36 (55%)

    A standalone contract that was open to bids.

  • Order (single-award IDIQ) 19 (29%)

    A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.

  • Not competed 6 (9%)

    Sole-source: only one company was asked.

  • Order (multiple-award IDIQ) 4 (6%)

    A task order placed under an IDIQ held by several companies, who competed for it.

Set-asides

Set-aside = reserved for a group of businesses.

  • Small business 37 (57%)

    Only small businesses could bid.

  • 8(a) 23 (35%)

    Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.

  • Open to all 3 (5%)

    No set-aside: any size of business could bid.

  • Veteran-owned 1 (2%)

    Reserved for service-disabled veteran-owned (SDVOSB) or veteran-owned (VOSB) small businesses.

  • HUBZone 1 (2%)

    Reserved for small businesses in a Historically Underutilized Business Zone.

Left out of the numbers above: 7 equipment purchases, 1 cancelled or $0 award. Why?

Umbrella contracts used here

Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.

Contract Type Orders Ordering ends
FA302221D0001 Single-award The IDIQ drew 4 offers 12 Sep 26, 2026
FA302216D0001 Single-award The IDIQ drew 2 offers 6 Sep 26, 2021
W9127824D0030 Multiple-award The IDIQ drew 47 offers 2 Jul 11, 2029
HT940824D0008 Multiple-award The IDIQ drew 13 offers 1 May 31, 2031
W9127820D0072 Single-award The IDIQ drew 23 offers 1 Aug 6, 2025
Report an error on this page

Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.