Base or VA center · Mississippi
Columbus Air Force Base: federal construction & facilities contracts
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Open bids here now
No open bids here right now. Updated weekly from SAM.gov · data through Oct 25. Save this search
Typical award (median)
$348,750
The middle of 65 priced awards, FY2021–FY2025. Half were between $93.9k and $643k.
Typical number of bids
5
Median bids per award, reported for 40 of 40 competed awards. 3% drew only one bid.
Won by small businesses
97%
Share of the 65 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award at Columbus Air Force Base was $349k (FY2021-FY2025, 65 priced awards).
- That is 5.2 times the median for all construction & facilities work in Mississippi ($66.6k).
- Competed awards drew a median of 5 offers (reported for 40 of 40).
- 3% of competed awards drew only one offer.
- In FY2025 the middle award was $456k, up 136% from FY2024 ($193k).
- Tip 95% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work near Columbus Air Force Base
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 18 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 9 | $168,416 |
| FY2017 | 8 | $298,508 |
| FY2018 | 20 | $309,481 |
| FY2019 | 9 | $47,877 |
| FY2020 | 14 | $132,064 |
| FY2021 | 9 | $169,392 |
| FY2022 | 8 | $216,118 |
| FY2023 | 16 | $410,917 |
| FY2024 | 14 | $193,002 |
| FY2025 | 18 | $455,811 |
| FY2026 (provisional) | 4 | – |
Award sizes
- Holds the median award, $348,750
Recent awards
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | ||||
|---|---|---|---|---|---|
| Jul 9, 2026 | Convert T1 Hangar to T7, B995 FA302226C0007 on USAspending (opens in a new tab) | West Brothers Construction Inc | $4,758,074 | 7 | Competed Small business |
| Jun 26, 2026 | Fiber Optic Cable B230 to B9511 FA302226P0011 on USAspending (opens in a new tab) | Sunrise Network Solutions Inc | $37,938 | 19 | Competed Small business |
| Jun 18, 2026 | Engineer, Furnish, Install, and Test the Upgrade of Premise Wiring Infrastructure to CAT-6 for the Building 704 (B704) at Columbus AFB, MS. FA302226P0009 on USAspending (opens in a new tab) | Sunrise Network Solutions Inc | $24,197 | 17 | Competed Small business |
| Jun 18, 2026 | Engineer, Furnish, Install, and Test the Upgrade of Premise Wiring Infrastructure to CAT-6 for the Buildings 246 (B246) and 414 (B414) at Columbus AFB, MS. FA302226P0010 on USAspending (opens in a new tab) | Quad-Team Technical Services Inc | $34,000 | 17 | Competed Small business |
| Sep 29, 2025 | The Contractor Must Provide All Plans, Labor, Equipment, Transportation, and Tools Required to Renovate a Space in B730, Accommodating of Sexual Assault, Prevention, and Response (SAPR) and the Integrated Prevention Workforce Offices. FA302225C0024 on USAspending (opens in a new tab) | West Brothers Construction Inc | $204,043 | 6 | Competed Small business |
| Sep 25, 2025 | This Requirement Removes Existing Premise Wiring in Buildings 1114 and 348, and Replaces it with Plenum-Rated CAT-6 Compliant Cables. FA302225P0019 on USAspending (opens in a new tab) | JL Enterprises, LLC | $36,755 | 17 | Competed Small business |
| Sep 25, 2025 | Contractor to Engineer, Furnish, Install, and Test (EFI and T) the Upgrade of Premise Wiring Infrastructure to CAT-6 for the Buildings 218 220.the Contractor Shall Also Be Required to Remove Existing Outdated Premise Wiring in This Building. FA302225P0023 on USAspending (opens in a new tab) | DND Solutions LLC | $60,181 | 10 | Competed Small business |
| Sep 25, 2025 | Premise Wiring B304 and B637 FA302225P0027 on USAspending (opens in a new tab) Equipment purchase | Individual contractor (name withheld) | $63,225 | 14 | Competed Small business |
| Sep 25, 2025 | Columbus AFB Has a Requirement for the Contractor to Engineer, Furnish, Install and Test the Upgrade of Wiring Infrastructure to CAT-6 for Building 1030 Iaw with the Respective Statement of Work. FA302225P0029 on USAspending (opens in a new tab) | Southpaw Communications, Inc. | $104,050 | 6 | Competed Small business |
| Sep 24, 2025 | The Intent of This Project Is to Replace All Mechanical/Plumbing Equipment in the Mechanical Room of B348 in Its Entirety, Except for the Boiler and Water Heater. FA302225C0009 on USAspending (opens in a new tab) | Air Control Engineering Inc | $780,000 | 6 | Competed Small business |
| Sep 19, 2025 | HUSH House Pad, Columbus AFB W9127825FA184 on USAspending (opens in a new tab) Approx. location | Emr, Inc. | $3,753,654 | 5 | Order (multiple-award IDIQ) Small business |
| Sep 9, 2025 | The Contractor Must Provide All, Labor, Material, Equipment, and Transportation Required to Replace a Condenser Pump Circulating Condenser Water from the Cooling Towers Supporting Building 268 of Columbus AFB, MS. FA302225P0016 on USAspending (opens in a new tab) | Individual contractor (name withheld) | $65,834 | 7 | Competed Small business |
| Sep 5, 2025 | Renovate Paint BARN FA302225C0022 on USAspending (opens in a new tab) | West Brothers Construction Inc | $5,233,696 | 2 | Competed Small business |
| Aug 22, 2025 | Convert Corrosion Control to 4-BAY T-7A Hangar FA302225C0021 on USAspending (opens in a new tab) | Dominguez & Persons, LLC | $10,672,395 | 7 | Competed Small business |
| Aug 8, 2025 | The Contractor Must Provide All Plant, Labor, Equipment, Transportation, and Tools Required to Complete a Full Replacement of the Backup Generators. This Shall Include Generators, the Fuel Pump, and the Automatic Transfer Switch (ATS). Refer to SOW. FA302225C0017 on USAspending (opens in a new tab) | BDM Industrial Services LLC | $240,191 | 6 | Competed Small business |
| Aug 7, 2025 | This Project Will Supply Adequate Storage for Maintenance Vehicles, Specifically the Installations Only Line Truck, to Prevent Damage from Inclement Weather and Ensure Work on Power Lines Can Be Safely Executed. FA302225C0012 on USAspending (opens in a new tab) | Individual contractor (name withheld) | $161,985 | 5 | Competed Small business |
| Aug 6, 2025 | Design, Furnish, and Install All Electrical Components Necessary to Provide Electricity and Power to Two (2) High Volume, Low Speed Ceiling Fans in Building 995 and B450. FA302225C0015 on USAspending (opens in a new tab) | Individual contractor (name withheld) | $435,000 | 2 | Competed Small business |
| Jul 17, 2025 | The Contractor Must Provide All Plant, Labor, Equipment, Transportation, and Tools Required to Complete the Renovation of B158 LRS Warehouse Iaw the SOW. FA302225C0013 on USAspending (opens in a new tab) | Individual contractor (name withheld) | $638,800 | 8 | Competed Small business |
| Jun 24, 2025 | Healthcare Environmental Cleaning Services at Redstone Arsenal and Columbus AFB HT940825F0025 on USAspending (opens in a new tab) | Titan Facility Services LLC | $643,163 | 5 | Order (multiple-award IDIQ) Small business |
| Apr 8, 2025 | Construct Egress Shop, Columbus Air Force Base, Mississippi W9127825FA010 on USAspending (opens in a new tab) | Emr, Inc. | $5,269,600 | 5 | Order (multiple-award IDIQ) Small business |
| Feb 5, 2025 | O&M Services- PM Columbus AFB W912DY25F0057 on USAspending (opens in a new tab) | Brymak Fsi JV, LLC | $418,172 | 5 | Order (multiple-award IDIQ) Open to all |
| Jan 30, 2025 | Repair HVAC and Electrical, B847 FA302225C0004 on USAspending (opens in a new tab) | BDM Industrial Services LLC | $607,256 | 4 | Competed Small business |
| Dec 16, 2024 | Expand and Renovate the Storage Area of the Hazardous Waste Storage Facility. FA302225C0003 on USAspending (opens in a new tab) | BDM Industrial Services LLC | $476,622 | 5 | Competed Small business |
| Sep 28, 2024 | The Main Objective of This Project Is to Repair the Dilapidated T-6 Flightline Shacks, Buildings 238, 240, 242, and 244. These Buildings Will Undergo Plumbing, Electrical, and Heating, Ventilation, and Air Conditioning, and Interior Repairs. FA302224F0022 on USAspending (opens in a new tab) Offers from IDIQ | Heritage Construction LLC | $261,005 | 4 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Sep 20, 2024 | All Labor, Equipment, Transportation, and Tools Required a Full Renovation of B454 into Wash Rack. See Statement of Work (SOW), Electrical, Plumbing, Drywall, Iaw 100% Design, 100% Specs, and All Related Af Requirements and Other Codes and References FA302224C0016 on USAspending (opens in a new tab) | Birmingham Industrial Construction, LLC | $6,781,398 | 3 | Competed Small business |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
Who won
Companies with the most priced awards here, FY2021–FY2025.
| # | Company | Awards | Total value at award |
|---|---|---|---|
| 1 | Heritage Construction LLC | 9 | $5,905,622 |
| 2 | Sunrise Network Solutions Inc | 9 | $499,145 |
| 3 | Pontchartrain Partners LLC | 6 | $2,403,929 |
| 4 | BDM Industrial Services LLC | 5 | $2,145,902 |
| 5 | West Brothers Construction Inc | 3 | $6,825,295 |
| 6 | Emr, Inc. | 2 | $9,023,254 |
| 7 | Copeland Contracting Company Inc | 2 | $7,204,193 |
| 8 | Air Control Engineering Inc | 2 | $1,537,000 |
| 9 | Dominguez & Persons, LLC | 1 | $10,672,395 |
| 10 | Bates Engineers/Contractors Inc | 1 | $10,099,789 |
How the work was bought
Competition
Was the work open to bids?
- Competed 36 (55%)
A standalone contract that was open to bids.
- Order (single-award IDIQ) 19 (29%)
A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.
- Not competed 6 (9%)
Sole-source: only one company was asked.
- Order (multiple-award IDIQ) 4 (6%)
A task order placed under an IDIQ held by several companies, who competed for it.
Set-asides
Set-aside = reserved for a group of businesses.
- Small business 37 (57%)
Only small businesses could bid.
- 8(a) 23 (35%)
Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.
- Open to all 3 (5%)
No set-aside: any size of business could bid.
- Veteran-owned 1 (2%)
Reserved for service-disabled veteran-owned (SDVOSB) or veteran-owned (VOSB) small businesses.
- HUBZone 1 (2%)
Reserved for small businesses in a Historically Underutilized Business Zone.
Left out of the numbers above: 7 equipment purchases, 1 cancelled or $0 award. Why?
Contracting offices buying here
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| FA302221D0001 | Single-award The IDIQ drew 4 offers | 12 | Sep 26, 2026 |
| FA302216D0001 | Single-award The IDIQ drew 2 offers | 6 | Sep 26, 2021 |
| W9127824D0030 | Multiple-award The IDIQ drew 47 offers | 2 | Jul 11, 2029 |
| HT940824D0008 | Multiple-award The IDIQ drew 13 offers | 1 | May 31, 2031 |
| W9127820D0072 | Single-award The IDIQ drew 23 offers | 1 | Aug 6, 2025 |
Trades at Columbus Air Force Base
Other bases & VA centers
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.