Base or VA center · Washington
Building Construction contracts at Fairchild Air Force Base
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Open Building Construction bids here now
No open Building Construction bids here right now. Updated weekly from SAM.gov · data through Oct 25. Save this search
Typical award (median)
$218,451
The middle of 152 priced awards, FY2021–FY2025. Half were between $39.2k and $624k.
Typical number of bids
3
Median bids per award, reported for 144 of 144 competed awards. 14% drew only one bid.
Won by small businesses
99%
Share of the 152 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle building construction award at Fairchild Air Force Base was $218k (FY2021-FY2025, 152 priced awards).
- That is 16% lower than the median for building construction in Washington ($260k).
- Competed awards drew a median of 3 offers (reported for 144 of 144).
- 14% of competed awards drew only one offer.
- In FY2025 the middle award was $198k, up 364% from FY2024 ($42.7k).
- Tip 89% of these awards were task orders under multiple-award contracts (MATOCs). To compete for those, you first need a spot on one of the umbrella contracts.
- Tip 98% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work near Fairchild Air Force Base
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 32 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 34 | $602,247 |
| FY2017 | 32 | $199,802 |
| FY2018 | 26 | $365,718 |
| FY2019 | 23 | $455,049 |
| FY2020 | 29 | $244,560 |
| FY2021 | 22 | $317,144 |
| FY2022 | 27 | $563,569 |
| FY2023 | 24 | $134,561 |
| FY2024 | 47 | $42,658 |
| FY2025 | 32 | $197,808 |
| FY2026 (provisional) | 13 | $422,665 |
Award sizes
- Holds the median award, $218,451
Recent awards
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | ||||
|---|---|---|---|---|---|
| Jul 10, 2026 | Repair or alteration of miscellaneous buildings FA462026F0057 on USAspending (opens in a new tab) | Onyx Construction Management LLC | $58,706 | 2 | Order (multiple-award IDIQ) Small business |
| Jun 3, 2026 | GJKZ17102788, Route Hydraulic Test Stand Utilities, B2050 FA462026F0048 on USAspending (opens in a new tab) | Yoy Inc | $49,867 | 2 | Order (multiple-award IDIQ) Small business |
| May 18, 2026 | GJKZ1158312 - Replace Generator and ATS, B1314 FA462026F0046 on USAspending (opens in a new tab) | Yukon Northcon LLC | $300,814 | 4 | Order (multiple-award IDIQ) Small business |
| May 13, 2026 | GJKZ1158046 Repair Cathodic Protection WST FA462026F0045 on USAspending (opens in a new tab) | Yukon Northcon LLC | $230,244 | 3 | Order (multiple-award IDIQ) Small business |
| May 13, 2026 | Install New Electrical Panels, Conduits, and Associated Components in the EE Shop and the Wheel and Tire Shop Located in B1039. W50S9D26FA005 on USAspending (opens in a new tab) | M. J. Takisaki, Inc. | $61,509 | 5 | Order (multiple-award IDIQ) Small business |
| May 8, 2026 | GJKZ221006 - Repair Taxiway Echo and Foxtrot Shoulders FA462026F0043 on USAspending (opens in a new tab) | Burton Construction, Inc. | $4,438,538 | 4 | Order (multiple-award IDIQ) Small business |
| Apr 27, 2026 | Repair Family Support Center Boiler, B2365 FA462026F0040 on USAspending (opens in a new tab) | Yukon Northcon LLC | $279,375 | 4 | Order (multiple-award IDIQ) Small business |
| Mar 18, 2026 | All Labor, Materials and Equipment Necessary to Perform Repair DORM Skylights Including But Not Limited to the Design, Material Submittal Process Hazardous Materials Survey Demolition, Replacement and Construction Associated with the Project. FA462026F0038 on USAspending (opens in a new tab) | Verdis Takisaki II | $581,900 | 4 | Order (multiple-award IDIQ) Small business |
| Mar 17, 2026 | Seal Cracked Surfaces of Taxiway Pavement and Re-Seal Pavement Joints All Cleaning, Preparation, and Disposal Necessary to Accomplish Said Task. Refer to Statement of Work. FA462026F0035 on USAspending (opens in a new tab) | Cascade-Nnac JV LLC | $635,400 | 3 | Order (multiple-award IDIQ) Small business |
| Feb 27, 2026 | GJKZ191001 - Repair Dormitory, B2276 FA462026F0033 on USAspending (opens in a new tab) | Northcon Inc | $3,010,524 | 5 | Order (multiple-award IDIQ) Small business |
| Feb 19, 2026 | FY 26 Maintain Airfield Striping FA462026F0032 on USAspending (opens in a new tab) | Yukon Northcon LLC | $422,665 | 3 | Order (multiple-award IDIQ) Small business |
| Dec 19, 2025 | Design Services Consisting of 65% Design (15% Government Concept Design Is Provided) Work and All Testing and Inspection for Repair for Building 2465 to Meet the Requirements of the Attached Statement of Work. FA462026F0028 on USAspending (opens in a new tab) | Verdis Takisaki II | $547,000 | 4 | Order (multiple-award IDIQ) Small business |
| Dec 18, 2025 | This Is a 35% Design Build, Defined As a Specific Work Element No. 2 (Design-Build Effort Required with Provided Partial Design) Proposed Task Order As Specified in the Basic MATOC Contract Requirements, Section 01000, Paragraph 1.2. FA462026F0027 on USAspending (opens in a new tab) | Verdis Takisaki II | $644,000 | 4 | Order (multiple-award IDIQ) Small business |
| Dec 11, 2025 | Repair and Replace Control Panel and Electrical Control Components for H1033 Hangar MEGA Door. W50S9D26FA001 on USAspending (opens in a new tab) Equipment purchase | Individual contractor (name withheld) | $264,039 | 4 | Order (multiple-award IDIQ) Small business |
| Sep 30, 2025 | Install Water Main Utility Vaults at Insertion Tap Locations and Provide a Condition Study and Report for the Watermain Piping from the Geiger Water Facility to the Extraction Point. FA462025F0067 on USAspending (opens in a new tab) | Verdis Takisaki II | $827,000 | 5 | Order (multiple-award IDIQ) Small business |
| Sep 26, 2025 | This Project Will Design and Construct an Auditorium in B1034. The Room Will Feature Three Risers for Tiered Seating, Two Aisles for Accessibility, New Carpet in the Auditorium Section, and Installation of Up to 88 Government-Supplied Chairs. W50S9D25FA012 on USAspending (opens in a new tab) | Individual contractor (name withheld) | $77,768 | 4 | Order (multiple-award IDIQ) Small business |
| Sep 26, 2025 | The Purpose of This Project Is to Install a High Efficiency Natural Gas Heater in the Mechanical Room of Hangar 1033 and 1037. The Installation Will Include a Total of (2) Heaters, Gas Piping, Electrical Connections, Venting, and Thermostat. W50S9D25FA013 on USAspending (opens in a new tab) | M. J. Takisaki, Inc. | $62,193 | 4 | Order (multiple-award IDIQ) Small business |
| Sep 23, 2025 | The Purpose of This Project Is to Provide Heating to the Administrative Areas on the West Side of H1029 with an Option to Replace the East Side Package Heat Pump System. W50S9D25FA011 on USAspending (opens in a new tab) | M. J. Takisaki, Inc. | $261,988 | 4 | Order (multiple-award IDIQ) Small business |
| Sep 18, 2025 | The Purpose of This Project Is to Replace the Heating System (Steam Boilers and Air Handling Units) for the High Bay with Gas-Fired, Power Burner, Infrared Radiant Heaters. W50S9D25FA008 on USAspending (opens in a new tab) | Apex Mechanical LLC | $427,811 | 3 | Order (multiple-award IDIQ) Small business |
| Sep 16, 2025 | Design-Build Renovation Project for Buildings 2245/2248/2249 at Fairchild AFB, Washington. The Project Includes Multi-Disciplinary Work to Complete the Project per the Statement of Work and SOW Attachments. FA462025C0005 on USAspending (opens in a new tab) Unusually large | Hcpa-Garco JV1 | $85,650,000 | 1 | Competed Small business |
| Sep 11, 2025 | GJKZ1154247 - Repair Slab, Spot 59 FA462025F0083 on USAspending (opens in a new tab) | Onyx Construction Management LLC | $79,191 | 2 | Order (multiple-award IDIQ) Small business |
| Sep 5, 2025 | GJKZ1154277 - Replace Fast Rollup Doors B2050 FA462025F0081 on USAspending (opens in a new tab) | Onyx Construction Management LLC | $78,612 | 2 | Order (multiple-award IDIQ) Small business |
| Sep 5, 2025 | Repair the HVAC in B446 W50S9D25FA007 on USAspending (opens in a new tab) | Apex Mechanical LLC | $196,000 | 3 | Order (multiple-award IDIQ) Small business |
| Aug 28, 2025 | Provide a 65% Design Documents and Physical Construction to Provide Active Radon Mitigation Systems for 5 Rooms in 4 Separate Dorms: B2257 RM 104, B2276 RM 1B3, B2266 RM 1B3/1B2, and B2268 RM 1A1 at Fairchild AFB, WA. FA462025F0080 on USAspending (opens in a new tab) | Fedvet Construction | $374,387 | 1 | Order (multiple-award IDIQ) Small business |
| Aug 1, 2025 | Remove Existing Electric Fire Pump and Associated Fire Pump Infrastructure, Install Post Indicator Valve on Fire Water Main and Include Tamper Switch; Modify EMCS to Reflect Fire Pump System Control Changes; ACM Abatement FA462025F0054 on USAspending (opens in a new tab) | Verdis Takisaki II | $240,800 | 4 | Order (multiple-award IDIQ) Small business |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
Who won
Companies with the most priced awards here, FY2021–FY2025.
| # | Company | Awards | Total value at award |
|---|---|---|---|
| 1 | National Native American Construction, Inc. | 26 | $18,876,523 |
| 2 | Onyx Construction Management LLC | 19 | $913,157 |
| 3 | M. J. Takisaki, Inc. | 18 | $24,344,803 |
| 4 | Verdis - Takisaki | 16 | $8,064,448 |
| 5 | Verdis Takisaki II | 9 | $4,388,781 |
| 6 | Yukon Northcon LLC | 8 | $2,573,238 |
| 7 | Northcon Inc | 6 | $11,978,982 |
| 8 | Ascent-Takisaki JV | 5 | $2,216,895 |
| 9 | Yoy Inc | 5 | $173,311 |
| 10 | Rore Inc | 3 | $5,023,600 |
How the work was bought
Competition
Was the work open to bids?
- Order (multiple-award IDIQ) 136 (89%)
A task order placed under an IDIQ held by several companies, who competed for it.
- Competed 8 (5%)
A standalone contract that was open to bids.
- Order (single-award IDIQ) 8 (5%)
A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.
Set-asides
Set-aside = reserved for a group of businesses.
- Small business 114 (75%)
Only small businesses could bid.
- 8(a) 35 (23%)
Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.
- Open to all 3 (2%)
No set-aside: any size of business could bid.
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| FA462023D0007 | Multiple-award The IDIQ drew 6 offers | 19 | Dec 1, 2028 |
| FA462019DA010 | Multiple-award The IDIQ drew 8 offers | 17 | Jul 31, 2024 |
| FA462019DA007 | Multiple-award The IDIQ drew 8 offers | 16 | Jul 31, 2024 |
| FA462024D0004 | Multiple-award The IDIQ drew 10 offers | 9 | Feb 20, 2029 |
| FA462024D0003 | Multiple-award The IDIQ drew 10 offers | 8 | Feb 20, 2029 |