Metro area
Building Construction contracts in the Cedar City, UT area
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Sep 21, 2026. Data status
Open Building Construction bids here now
No open Building Construction bids here right now. Updated weekly from SAM.gov · data through Oct 25. Save this search
Typical award (median)
$142,625
The middle of 17 priced awards, FY2021–FY2025. Half were between $67.7k and $607k.
Typical number of bids
2
Median bids per award, reported for 16 of 16 competed awards. 13% drew only one bid.
Won by small businesses
94%
Share of the 17 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle building construction award in the Cedar City, UT area was $143k (FY2021-FY2025, 17 priced awards).
- That is 21% lower than the median for building construction in Utah ($181k).
- Competed awards drew a median of 2 offers (reported for 16 of 16).
- 13% of competed awards drew only one offer.
- Small businesses won 94% of priced awards.
- Tip 76% of these awards were task orders under multiple-award contracts (MATOCs). To compete for those, you first need a spot on one of the umbrella contracts.
- Tip 94% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work in the Cedar City, UT area
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 3 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 1 | – |
| FY2017 | 2 | – |
| FY2018 | 0 | – |
| FY2019 | 2 | – |
| FY2020 | 1 | – |
| FY2021 | 1 | – |
| FY2022 | 6 | $95,822 |
| FY2023 | 4 | – |
| FY2024 | 3 | – |
| FY2025 | 3 | – |
| FY2026 (provisional) | 0 | – |
Award sizes
- Holds the median award, $142,625
Recent awards
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | ||||
|---|---|---|---|---|---|
| Sep 2, 2025 | GAOA - Coal Creek Warehouse 140L5725F0031 on USAspending (opens in a new tab) | Global Engineering Services Inc | $487,344 | 4 | Order (multiple-award IDIQ) Small business |
| Mar 26, 2025 | Replacement of Roof and Gutter System on Several Buildings 1240LT25F0006 on USAspending (opens in a new tab) | Grand Enterprises, LLC | $62,304 | 2 | Order (multiple-award IDIQ) Small business |
| Mar 14, 2025 | GAOA-Cedar City Air Base Improvements Design-Build 140L0625C0009 on USAspending (opens in a new tab) | Suh'Dutsing Contracting Services | $1,948,004 | 2 | Competed Small business |
| Sep 25, 2024 | GAOA- Escalante Ranger District Housing Upgrades. Remodel Bunkhouse, Convert Storage Building into Laundry Building, and Construct Several Homes. 1240LT24C0047 on USAspending (opens in a new tab) | KMN Construction, Inc. | $607,325 | 5 | Competed Small business |
| Sep 19, 2024 | This Project Involves the Procurement and Installation Bridge on Timber Sills. 1282B124F0146 on USAspending (opens in a new tab) | KMN Construction, Inc. | $67,700 | 1 | Order (multiple-award IDIQ) Small business |
| Sep 19, 2024 | GAOA-Cedar City Air Base Improvements Design-Build 140L0624C0033 on USAspending (opens in a new tab) Cancelled / $0 | Global Engineering Services Inc | $2,023,004 | 3 | Competed Small business |
| Jun 18, 2024 | Pine Valley Campground Asphalt Maintenance 1282B124F0059 on USAspending (opens in a new tab) | KMN Construction, Inc. | $1,372,323 | 2 | Order (multiple-award IDIQ) Small business |
| Sep 21, 2023 | GAOA Duck Creek Campground Reconstruction Project Award of Base Items Only. Per Attached Schedule of Items and Pricing. Period of Performance 10/10/2023-12/31/2024 1240LS23F0057 on USAspending (opens in a new tab) | Dofine Sprinkler Rebuilders Inc | $1,401,432 | 2 | Order (multiple-award IDIQ) Small business |
| Sep 21, 2023 | Kitty Hawk East Fencing Replace Fencing on the East Side of the Kitty Hawk Admin Site in Cedar City, Utah 1240LT23F0061 on USAspending (opens in a new tab) | Dofine Sprinkler Rebuilders Inc | $70,457 | 2 | Order (multiple-award IDIQ) Small business |
| Sep 20, 2023 | Panguitch Admin Site, Install New Gate and Associated Electrical Work and Fencing. 1240LT23F0060 on USAspending (opens in a new tab) | KMN Construction, Inc. | $39,756 | 2 | Order (multiple-award IDIQ) Small business |
| Jul 6, 2023 | GAOA South Loop CG Reconstruction Project 1240LT23F0035 on USAspending (opens in a new tab) | KMN Construction, Inc. | $595,568 | 2 | Order (multiple-award IDIQ) Small business |
| Aug 17, 2022 | Lake Boat Ramp and Dam Maintenance 1240LT22F0082 on USAspending (opens in a new tab) | KMN Construction, Inc. | $142,625 | 3 | Order (multiple-award IDIQ) Small business |
| Aug 15, 2022 | PT. Railing Replacment 140P1222F0038 on USAspending (opens in a new tab) Offers from IDIQ | Acierto LLC | $117,194 | 4 from the IDIQ | Order (single-award IDIQ) Veteran-owned |
| Jul 6, 2022 | Dispatch Gate Opener Replacement Project Dixie National Forest 1240LT22F0060 on USAspending (opens in a new tab) | KMN Construction, Inc. | $6,531 | 3 | Order (multiple-award IDIQ) Small business |
| Jun 8, 2022 | Remove and Replace Exhaust and Relief Fans. Integrate New Control Devices with Existing Control System to Accomplish Control Sequences. 1240LS22F0031 on USAspending (opens in a new tab) | Miller Electric Company Inc. | $74,450 | 1 | Order (multiple-award IDIQ) Small business |
| Jun 8, 2022 | Hazmat Building Concrete & Electrical Dixie National Forest Award Is Being Made for the Base Item and Option Item O.260500-1. In Accordance with Far 52.217-7, the Government Has 120 Calendar Days After Contract Award to Exercise Option 1240LT22F0042 on USAspending (opens in a new tab) | KMN Construction, Inc. | $44,196 | 3 | Order (multiple-award IDIQ) Small business |
| May 10, 2022 | Countertop & Floor Replacement for Kayenta Community School 140A2322F0106 on USAspending (opens in a new tab) | Suh'Dutsing-Pilkington Construction JV, LLC | $536,731 | 3 | Order (multiple-award IDIQ) Small business |
| Sep 24, 2021 | Guaranteed Minimum Award Under IDIQ #140A1621D0052 140A1621F0168 on USAspending (opens in a new tab) Cancelled / $0 | Suh'Dutsing-Pilkington Construction JV, LLC | $10,000 | 1 | Order (multiple-award IDIQ) Small business |
| May 13, 2021 | The Purpose of This Project Is to Construct a New Visitor Contact Station As a Central Point of Services for Park Visitors. 140P2021C0058 on USAspending (opens in a new tab) | E Corp | $3,553,053 | 4 | Competed Open to all |
| Sep 18, 2020 | Cyclic Repair Maintenance Buildings 140P1220F0098 on USAspending (opens in a new tab) Offers from IDIQ | Acierto LLC | $91,177 | 4 from the IDIQ | Order (single-award IDIQ) Veteran-owned |
| Sep 3, 2019 | Construction of office buildings 12026119C0010 on USAspending (opens in a new tab) | Guardian/Ec JV LLC | $5,406,445 | 3 | Competed Small business |
| Aug 7, 2019 | Coal Creek Ware Yard Improvements the Bureau of Land Management (BLM) Hereby Awards the Contract for the Coal Creek Ware Yard Improvements. The Work Includes All Labor, Equipment, Supplies and Materials to 1 Prepare Construction Site; 2 Design 140L5719C0007 on USAspending (opens in a new tab) | KMN Construction, Inc. | $258,797 | 3 | Competed Small business |
| Jul 19, 2017 | Picnic Pavilion Project: This Project Will Include Construction of a 1,000 Square Foot (25 40 Ft) Pavilion Structure, Including a 4' Concrete Sidewalk Leading to the Picnic Pavilion from Two Separate Locations of the Project Area. The Project Will Also Include the Sub-Grade Preparation, Sewer and Water Line Trench Excavation, and the Installing of a Restroom a 4' Concrete Apron Will Be Included… INP17PC00291 on USAspending (opens in a new tab) | Eddie Lopez Construction LLC | $234,735 | 1 | Not competed Open to all |
| Jul 9, 2017 | Cedar Breaks National Monument Pre-Cast RR for Picnic Pavilion This Project Includes Fabrication and Installation of a Double Unit Precast Concrete Flush Restroom Building of EASI-Set Design, Manufactured by Mountain West Precast, Including Shipment to Site, Placement on Pad (Prepared by Others), All Work Necessary to Completely Fabricate and Installation of Other Manufactured Accessories Needed… INP17PC00228 on USAspending (opens in a new tab) Equipment purchase | Mountain West Precast LLC | $62,603 | 1 | Not competed Open to all |
| Apr 27, 2017 | Color Country Interagency Fire Center Pavement Preservation AG84N8D170014 on USAspending (opens in a new tab) | Global Engineering Services Inc | $25,436 | 2 | Order (multiple-award IDIQ) Small business |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
Who won
Companies with the most priced awards here, FY2021–FY2025.
| # | Company | Awards | Total value at award |
|---|---|---|---|
| 1 | KMN Construction, Inc. | 8 | $2,876,023 |
| 2 | Dofine Sprinkler Rebuilders Inc | 2 | $1,471,889 |
| 3 | E Corp | 1 | $3,553,053 |
| 4 | Suh'Dutsing Contracting Services | 1 | $1,948,004 |
| 5 | Suh'Dutsing-Pilkington Construction JV, LLC | 1 | $536,731 |
| 6 | Global Engineering Services Inc | 1 | $487,344 |
| 7 | Acierto LLC | 1 | $117,194 |
| 8 | Miller Electric Company Inc. | 1 | $74,450 |
| 9 | Grand Enterprises, LLC | 1 | $62,304 |
How the work was bought
Competition
Was the work open to bids?
- Order (multiple-award IDIQ) 13 (76%)
A task order placed under an IDIQ held by several companies, who competed for it.
- Competed 3 (18%)
A standalone contract that was open to bids.
- Order (single-award IDIQ) 1 (6%)
A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.
Set-asides
Set-aside = reserved for a group of businesses.
- Small business 15 (88%)
Only small businesses could bid.
- Veteran-owned 1 (6%)
Reserved for service-disabled veteran-owned (SDVOSB) or veteran-owned (VOSB) small businesses.
- Open to all 1 (6%)
No set-aside: any size of business could bid.
Left out of the numbers above: 2 cancelled or $0 awards. Why?
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| 1240LR21D0005 | Multiple-award The IDIQ drew 10 offers | 7 | Apr 18, 2026 |
| 1240LR21D0003 | Multiple-award The IDIQ drew 10 offers | 2 | Oct 18, 2025 |
| 1240LR21D0004 | Multiple-award The IDIQ drew 10 offers | 1 | Apr 18, 2026 |
| 1240LR21D0007 | Multiple-award The IDIQ drew 10 offers | 1 | Oct 18, 2025 |
| 140A1621D0052 | Multiple-award The IDIQ drew 14 offers | 1 | Sep 23, 2026 |
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.