Metro area
Building Construction contracts in the Las Vegas, NM area
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Open Building Construction bids here now
No open Building Construction bids here right now. Updated weekly from SAM.gov · data through Oct 25. Save this search
Typical award (median)
$203,879
The middle of 12 priced awards, FY2021–FY2025. Half were between $79.2k and $450k.
Typical number of bids
1.5
Median bids per award, reported for 8 of 8 competed awards.
Won by small businesses
92%
Share of the 12 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle building construction award in the Las Vegas, NM area was $204k (FY2021-FY2025, 12 priced awards).
- That is 6% lower than the median for building construction in New Mexico ($218k).
- Competed awards drew a median of 1.5 offers (reported for 8 of 8).
- Small businesses won 92% of priced awards.
- The top 3 winners took 75% of priced awards.
- Tip 50% of these awards were task orders under multiple-award contracts (MATOCs). To compete for those, you first need a spot on one of the umbrella contracts.
- Tip 100% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work in the Las Vegas, NM area
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 1 award
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 2 | – |
| FY2017 | 3 | – |
| FY2018 | 3 | – |
| FY2019 | 1 | – |
| FY2020 | 2 | – |
| FY2021 | 5 | $291,958 |
| FY2022 | 0 | – |
| FY2023 | 2 | – |
| FY2024 | 4 | – |
| FY2025 | 1 | – |
| FY2026 (provisional) | 0 | – |
Award sizes
- Holds the median award, $203,879
Recent awards
The latest 23 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | ||||
|---|---|---|---|---|---|
| Aug 15, 2025 | Replace Roof Top HVAC Unit 140P1225F0043 on USAspending (opens in a new tab) | Ritecon Inc. | $29,827 | 1 | Order (multiple-award IDIQ) HUBZone |
| Aug 15, 2024 | FLR Water Tank, Pump and Well Roof 140P1324P0089 on USAspending (opens in a new tab) | JB Contracting Inc | $115,800 | 5 | Competed Small business |
| Jul 12, 2024 | NM-Rio NWR-Bison Fencing Project 140FC124F0022 on USAspending (opens in a new tab) | Global Engineering Services Inc | $1,344,104 | 3 | Order (multiple-award IDIQ) Small business |
| Jun 12, 2024 | Rehab VC Exterior Stucco 140P1324F0054 on USAspending (opens in a new tab) | Ritecon Inc. | $420,231 | 1 | Order (multiple-award IDIQ) HUBZone |
| Apr 18, 2024 | Historic Building Repair - Conchas Dam, New Mexico W912PP24C0006 on USAspending (opens in a new tab) | Colt Builders and Weil Construction Joint Venture L.L.C. | $3,034,857 | 1 | Not competed 8(a) |
| Aug 1, 2023 | Pecos National Historical Park - Install Split System HVAC 140P1323F0162 on USAspending (opens in a new tab) | Ritecon Inc. | $18,677 | 1 | Order (multiple-award IDIQ) HUBZone |
| Dec 6, 2022 | Exhibit Demo and Room Prep -211142C 140P1323F0006 on USAspending (opens in a new tab) | Ritecon Inc. | $87,764 | 1 | Order (multiple-award IDIQ) HUBZone |
| Aug 13, 2021 | Rehab Exterior of 3 BLDGS - the Primary Work of This Project Includes, But Is Not Limited to, the Patching of Cracks and Repair and of Approximately 6,350 SQ. Ft. Of Exterior Finish on Three Buildings Located at Fort Union National 140P1321F0185 on USAspending (opens in a new tab) Offers from IDIQ | Ritecon Inc. | $291,958 | 4 from the IDIQ | Order (single-award IDIQ) HUBZone |
| Aug 5, 2021 | Hazmat Demolition and Removal, Hauling, and Site Remediation 140P1321F0076 on USAspending (opens in a new tab) Offers from IDIQ | Ritecon Inc. | $539,160 | 4 from the IDIQ | Order (single-award IDIQ) HUBZone |
| Jul 23, 2021 | GAOA Spring Mountains Visitor Gateway Center Maintenance and Repair Project 1240LR21F0086 on USAspending (opens in a new tab) | Dofine Sprinkler Rebuilders Inc | $98,801 | 2 | Order (multiple-award IDIQ) Small business |
| Jun 14, 2021 | NM-Las Vegas NWR-Remodel Visitor Center 140F0121C0021 on USAspending (opens in a new tab) | Aegis USA Company | $330,000 | 2 | Competed Small business |
| Feb 24, 2021 | Preserve Trading Post Hay BARN 140P1321F0031 on USAspending (opens in a new tab) Offers from IDIQ | Ritecon Inc. | $53,567 | 4 from the IDIQ | Order (single-award IDIQ) HUBZone |
| Sep 22, 2020 | Pecos National Historical Park - Plug Middle Pasture Well 140P1320F0236 on USAspending (opens in a new tab) Offers from IDIQ | Ritecon Inc. | $32,865 | 4 from the IDIQ | Order (single-award IDIQ) HUBZone |
| May 4, 2020 | Design/Build to Retrofit the Visitor Center at Fort Union National Monument. This Contract Consists of Two (2) Contract Line (Bid) Items: Design: This Item Consists of the Complete Interior Building Remodeling to Include the Preparation 140P1320F0082 on USAspending (opens in a new tab) | Northern Management Services, Inc. | $419,609 | 4 | Order (multiple-award IDIQ) Small business |
| Dec 19, 2018 | National Historical Park Rehabilitate Historic Trading Post Work of This Project Includes Correction and Mitigation of Site Deficiencies, and Complete Stabilization, Repair, Rehabilitation, Modification and/or Replacement of the Structure, Fabric, and Features of the Building, Including the Roof, Roof Drainage System and Roof Structure; Exterior Portals; Adobe and Stone Walls; Foundations… 140P1319C0001 on USAspending (opens in a new tab) | Weil Construction Inc | $3,763,700 | 4 | Competed HUBZone |
| Sep 10, 2018 | Replace Visitor Center Roof 140P1318F0245 on USAspending (opens in a new tab) Offers from IDIQ | Ritecon Inc. | $325,346 | 4 from the IDIQ | Order (single-award IDIQ) HUBZone |
| Aug 17, 2018 | Conchas Main Dam Painting W912PP18P0071 on USAspending (opens in a new tab) | Rymarc Construction Inc | $127,683 | 1 | Not competed 8(a) |
| May 30, 2018 | Re-Stucco Main Unit Buildings 140P1318F0100 on USAspending (opens in a new tab) Offers from IDIQ | Ritecon Inc. | $27,083 | 4 from the IDIQ | Order (single-award IDIQ) HUBZone |
| Aug 18, 2017 | Design/Build - Replace Trading Post Well at Pecos National Historical Park. Scope of Work: All Work, Terms and Conditions, Clauses and Provisions, As Stated in Solicitation T0040342803, with All Attachments, Is Herein Expressly Incorporated into This Contract. General Drilling, and Completion of a Potable Water Well per New Mexico Office of the State Engineer, New Mexico Environment Department… INP17PD02519 on USAspending (opens in a new tab) | E Corp | $240,588 | 23 | Order (single-award IDIQ) Small business |
| Jul 6, 2017 | Rehabilitation of Main Ruins Trail INP17PD01723 on USAspending (opens in a new tab) | Marsh Development, Inc. | $385,412 | 23 | Order (single-award IDIQ) Small business |
| Jun 29, 2017 | Construction Remodel for the New DOL Space at the LDG Federal Courthouse in Las Vegas Nevada. GS09P17KLC0006 on USAspending (opens in a new tab) | Eagle Eye Electric LLC | $1,259,145 | 1 | Not competed 8(a) |
| Apr 29, 2016 | Re-Stucco Visitor Center INP16PD01126 on USAspending (opens in a new tab) | Ritecon Inc. | $102,860 | 8 | Order (single-award IDIQ) Small business |
| Apr 27, 2016 | Porch Roof INP16PD00853 on USAspending (opens in a new tab) | Ritecon Inc. | $11,390 | 8 | Order (single-award IDIQ) Small business |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
Who won
Companies with the most priced awards here, FY2021–FY2025.
| # | Company | Awards | Total value at award |
|---|---|---|---|
| 1 | Ritecon Inc. | 7 | $1,441,183 |
| 2 | Colt Builders and Weil Construction Joint Venture L.L.C. | 1 | $3,034,857 |
| 3 | Global Engineering Services Inc | 1 | $1,344,104 |
| 4 | Aegis USA Company | 1 | $330,000 |
| 5 | JB Contracting Inc | 1 | $115,800 |
| 6 | Dofine Sprinkler Rebuilders Inc | 1 | $98,801 |
How the work was bought
Competition
Was the work open to bids?
- Order (multiple-award IDIQ) 6 (50%)
A task order placed under an IDIQ held by several companies, who competed for it.
- Order (single-award IDIQ) 3 (25%)
A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.
- Competed 2 (17%)
A standalone contract that was open to bids.
- Not competed 1 (8%)
Sole-source: only one company was asked.
Set-asides
Set-aside = reserved for a group of businesses.
- HUBZone 7 (58%)
Reserved for small businesses in a Historically Underutilized Business Zone.
- Small business 4 (33%)
Only small businesses could bid.
- 8(a) 1 (8%)
Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.
Contracting offices buying here
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| 140P1322D0002 | Multiple-award The IDIQ drew 8 offers | 4 | Mar 10, 2027 |
| 140P1318D0002 | Single-award The IDIQ drew 4 offers | 3 | Jan 8, 2022 |
| 1240LR21D0003 | Multiple-award The IDIQ drew 10 offers | 1 | Oct 18, 2025 |
| 140F0822D0048 | Multiple-award The IDIQ drew 139 offers | 1 | Jun 30, 2027 |
Contracts ending soon
Recurring work whose current contract ends within 18 months, so the agency will likely buy it again (a "recompete"). The company doing it today is the incumbent.
-
Ordering period ends Mar 10, 2027
Indefinite Delivery Indefinite Quantity SABER Contract Award for the Santa Fe MABO. This Is a Contract for a Simplified Acquisition of Basic Engineering Requirements (SABER) for the Santa Fe Major Acquisition Buying Officer Covering Services for All
Incumbent: Ritecon Inc. Buyer: IMR Santa Fe
140P1322D0002 on USAspending (opens in a new tab)
Nearby
- Building Construction in the Santa Fe, NM area
- Building Construction in the Los Alamos, NM area
- Building Construction in the Albuquerque, NM area
- Building Construction in the Alamosa, CO area
- Building Construction in the Clovis, NM area
- Building Construction in the Roswell, NM area
- Building Construction in the Amarillo, TX area
- Building Construction in the Gallup, NM area
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.