Base or VA center · Florida
Building Construction contracts at Eglin Air Force Base
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Open Building Construction bids here now
No open Building Construction bids here right now. Updated weekly from SAM.gov · data through Oct 25. Save this search
Typical award (median)
$190,499
The middle of 449 priced awards, FY2021–FY2025. Half were between $65.9k and $629k.
Typical number of bids
7
Median bids per award, reported for 77 of 77 competed awards. 4% drew only one bid.
Won by small businesses
100%
Share of the 449 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle building construction award at Eglin Air Force Base was $190k (FY2021-FY2025, 449 priced awards).
- That is 30% lower than the median for building construction in Florida ($273k).
- Competed awards drew a median of 7 offers (reported for 77 of 77).
- 4% of competed awards drew only one offer.
- In FY2025 the middle award was $278k, up 5% from FY2024 ($264k).
- Tip 76% of these awards were task orders under single-award contracts (IDIQs). Only the company holding that contract could get them, so watch for the umbrella contract to be re-bid.
- Tip 88% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work near Eglin Air Force Base
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 109 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 55 | $145,462 |
| FY2017 | 69 | $148,802 |
| FY2018 | 50 | $83,878 |
| FY2019 | 35 | $1,795,442 |
| FY2020 | 69 | $205,984 |
| FY2021 | 76 | $111,591 |
| FY2022 | 92 | $112,752 |
| FY2023 | 86 | $217,524 |
| FY2024 | 86 | $263,789 |
| FY2025 | 109 | $278,184 |
| FY2026 (provisional) | 25 | $170,924 |
Award sizes
- Holds the median award, $190,499
Recent awards
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | ||||
|---|---|---|---|---|---|
| Jul 20, 2026 | Repair Pavements Air Force Research Lab Loading Area Building 614 FA282326F0156 on USAspending (opens in a new tab) Provisional Offers from IDIQ Value after changes | Kekolu Contracting, LLC | $85,488 after changes | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Jul 20, 2026 | 26-CB04 - Renovate Technical Library Restrooms, Building 300 FA282326F0166 on USAspending (opens in a new tab) Provisional Offers from IDIQ Value after changes | Kekolu Contracting, LLC | $184,019 after changes | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Jul 13, 2026 | 26-CB02 Repair Renovate Bathrooms Building 614 FA282326F0155 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $189,204 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Jun 29, 2026 | Renovate 2ND Floor Controlled Space Expansion Squadron Operations, Building 3078 FA282326F0142 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $170,924 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Jun 23, 2026 | Repair - Install Dedicated Power and Relocate Strobe Device, Building 96 FA282326F0133 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $29,313 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Jun 4, 2026 | Construct Airfield Wildlife Exclusion Fence to Construct a Barrier to Prevent Wildlife from Entering Airfield in Accordance with Statement of Work. FA282326C0018 on USAspending (opens in a new tab) | Arrowhead Contracting, Inc. | $895,977 | 1 | Not competed 8(a) |
| Jun 1, 2026 | Construct Boundary Fence to Fill in Gaps in Installation Boundary Fence on Eglin AFB and Valparaiso Boundary. FA282326C0014 on USAspending (opens in a new tab) | E.K. Management, L.L.C. | $3,078,332 | 1 | Not competed 8(a) |
| May 21, 2026 | Add Additional Cooling in Rooms 132 and 133, Building 85 FA282326F0103 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $69,761 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| May 20, 2026 | Shipboard Trainer, Range D-51 FA282326F0095 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $234,782 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| May 18, 2026 | Repair - Replace 2-TON Heating, Ventilation, and Air Conditioning in Room 1019, Building 12 FA282326F0094 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $58,977 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| May 18, 2026 | 26-CB01- RPR - SOF Install STC 50 Rated Door Room 239, Building 3144 FA282326F0096 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $31,403 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| May 11, 2026 | 26-AK07 7TH SFG Replace Three 70 Ton Chillers in Barracks - Buildings 4580, 4585, 4595 FA282326F0092 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $915,039 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Apr 30, 2026 | 26AD16 - Replace Rapcon Chiller Located on Roof, Building 104 FA282326F0085 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $416,745 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Apr 24, 2026 | Consolidate COMM Room into Room 128 BLDG 614. FA282326F0083 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $117,986 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Apr 21, 2026 | 26-AD10 Replace Lab Room Door B1358 FA282326F0067 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $34,593 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Apr 21, 2026 | 25-FP50 RPR - Boiler with Reheat, Piping, Pump, Controls, Buffer Tank and AHU, Building 12522, Site A-15. FA282326F0078 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $470,420 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Apr 17, 2026 | Catwalk Load Capacity, Building 71 FA282326F0064 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $10,551 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Apr 10, 2026 | 07-1214 Construct New Bridge to Replace Bridge 12201, RR 234 FA282326F0047 on USAspending (opens in a new tab) Equipment purchase | CMC Building Inc | $2,125,750 | 5 | Order (multiple-award IDIQ) Small business |
| Apr 6, 2026 | 26-AD11 - Replace Room 203 Vault Door, Building 614 FA282326F0055 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $36,417 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Apr 1, 2026 | Replace 15 Ton Heating Ventilation and Air Condition System, Building 626 FA282326F0052 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $97,720 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Mar 26, 2026 | Repair Roof Earth Covered Bunker, B9474, Site C-80C FA282326F0044 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $220,633 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Mar 26, 2026 | Repair Earth Covered Bunker, Building 9469, Site C-80B FA282326F0045 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $201,757 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Mar 16, 2026 | Replace Tail Door Corrosion B72 FA282326F0033 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $131,856 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Mar 4, 2026 | Repair Food Court Main Sewer Line Base Exchange Building 1757 FA282326F0034 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $44,273 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Feb 18, 2026 | Renovate 3RD Floor - Building 11, Eglin Air Force Base FA282326F0029 on USAspending (opens in a new tab) Offers from IDIQ | Kekolu Contracting, LLC | $212,129 | 6 from the IDIQ | Order (single-award IDIQ) 8(a) |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders. After changes = the original award value was not reported, so the value shown includes later changes; such awards are left out of price statistics.
Who won
Companies with the most priced awards here, FY2021–FY2025.
| # | Company | Awards | Total value at award |
|---|---|---|---|
| 1 | Dawson Enterprises, Inc. | 219 | $43,258,838 |
| 2 | Kekolu Contracting, LLC | 82 | $20,735,552 |
| 3 | Ma-Chis-WB JV LLC | 33 | $9,891,266 |
| 4 | Reasor Building Group LLC | 24 | $63,574,879 |
| 5 | Aktarius LLC | 10 | $13,911,034 |
| 6 | Speegle Construction, Inc | 8 | $66,652,964 |
| 7 | Onopa Services LLC | 8 | $18,157,916 |
| 8 | Emr, Inc. | 6 | $62,461,181 |
| 9 | Oac Action Construction Corp. | 5 | $7,713,328 |
| 10 | Rogue Industries LLC | 5 | $7,140,717 |
How the work was bought
Competition
Was the work open to bids?
- Order (single-award IDIQ) 340 (76%)
A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.
- Order (multiple-award IDIQ) 63 (14%)
A task order placed under an IDIQ held by several companies, who competed for it.
- Not competed 32 (7%)
Sole-source: only one company was asked.
- Competed 14 (3%)
A standalone contract that was open to bids.
Set-asides
Set-aside = reserved for a group of businesses.
- 8(a) 326 (73%)
Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.
- Small business 70 (16%)
Only small businesses could bid.
- Open to all 53 (12%)
No set-aside: any size of business could bid.
Left out of the numbers above: 2 equipment purchases. Why?
Contracting offices buying here
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| FA282319DA005 | Single-award The IDIQ drew 1 offers | 219 | Sep 18, 2024 |
| FA282324D0006 | Single-award The IDIQ drew 6 offers | 82 | Jul 8, 2029 |
| FA282324D0004 | Single-award The IDIQ drew 1 offers | 32 | Mar 13, 2025 |
| FA282322D0007 | Multiple-award The IDIQ drew 73 offers | 22 | Sep 20, 2027 |
| FA282322D0009 | Multiple-award The IDIQ drew 73 offers | 8 | Sep 20, 2027 |
Other trades here
Nearby
- Building Construction in the Crestview, FL area
- Building Construction at Hurlburt Field
- Building Construction at Naval Air Station Whiting Field
- Building Construction at Naval Support Activity Panama City
- Building Construction at Tyndall Air Force Base
- Building Construction at Naval Air Station Pensacola
- Building Construction at Fort Rucker
- Building Construction at Coast Guard Aviation Training Center Mobile
- Building Construction at VA Montgomery
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.