Metro area
Plumbing contracts in the Greenville, MS area
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Sep 21, 2026. Data status
Open Plumbing bids here now
No open Plumbing bids here right now. Updated weekly from SAM.gov · data through Oct 25. Save this search
Typical award (median)
$20,152
The middle of 14 priced awards, FY2021–FY2025. Half were between $11k and $27.4k.
Typical number of bids
2
Median bids per award, reported for 7 of 7 competed awards.
Won by small businesses
36%
Share of the 14 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle plumbing award in the Greenville, MS area was $20.2k (FY2021-FY2025, 14 priced awards).
- That is close to the median for plumbing in Mississippi ($19.2k).
- Competed awards drew a median of 2 offers (reported for 7 of 7).
- Small businesses won 36% of priced awards.
- The top 3 winners took 57% of priced awards.
- Tip The typical award drew only 2 bids. Less competition can mean a better chance for a new bidder.
FedComps Pro · coming soon · free waitlist
Get alerts for new plumbing work in the Greenville, MS area
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 2 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 8 | $3,831 |
| FY2017 | 4 | – |
| FY2018 | 6 | $6,163 |
| FY2019 | 3 | – |
| FY2020 | 2 | – |
| FY2021 | 4 | – |
| FY2022 | 4 | – |
| FY2023 | 3 | – |
| FY2024 | 1 | – |
| FY2025 | 2 | – |
| FY2026 (provisional) | 1 | – |
Award sizes
- Holds the median award, $20,152
Recent awards
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | ||||
|---|---|---|---|---|---|
| Jul 7, 2026 | Replacement of the Backflow Preventer on the CGC Patoka 70Z02926PNEWO0092 on USAspending (opens in a new tab) | Lyceum Dynamics LLC | $19,560 | 5 | Competed Small business |
| Jun 10, 2025 | LSS - Demo/Replace 4 Boilers at Stoneville, BLDG #7 1232SA25P0032 on USAspending (opens in a new tab) | W M B, Inc. | $50,829 | 8 | Competed Small business |
| Nov 14, 2024 | Location Support Services - Replace Oil Pump and Sensor for Chiller #1, Building 32 Stoneville 12405B25P0007 on USAspending (opens in a new tab) | Johnson Controls, Inc | $22,804 | 1 | Not competed Open to all |
| Jan 3, 2024 | Repair 500T York Chiller #2-STONEVILLE BLDG.1 per Attached Statement of Work (Follow-on to 12405B22P0161) 12405B24P0034 on USAspending (opens in a new tab) | Johnson Controls, Inc | $16,188 | 1 | Not competed Open to all |
| May 16, 2023 | Labor, Materials and Incidentals to Perform Annual Service Maintenance & Inspection on Two (2) 250 HP Steam Boilers 12405B23P0187 on USAspending (opens in a new tab) | Mccain Engineering Company, Inc. | $10,862 | 3 | Competed Open to all |
| May 12, 2023 | BLDG. #46 - Repair Trane HVAC System As per Statement of Work 12405B23P0180 on USAspending (opens in a new tab) | W M B, Inc. | $24,999 | 3 | Competed Open to all |
| Mar 16, 2023 | Johnson Controls - BLDG. #1 Chiller Overhaul Project-Follow-on to 12405B22P0161. Replacement of the Compressor Gear Set. 12405B23P0107 on USAspending (opens in a new tab) | Johnson Controls, Inc | $54,542 | 1 | Not competed Open to all |
| Jun 6, 2022 | Chiller 1 Compressor Overhaul-Provide All Equipment, Labor, and Materials Necessary to Overhaul Existing #1 Compressor to Include: 1 Recovery of Refrigerant and Oil. 2 Pull Compressors and Overhaul Including Installation of New High and Low SPE 12405B22P0161 on USAspending (opens in a new tab) | Johnson Controls, Inc | $75,054 | 2 | Competed Open to all |
| May 22, 2022 | Replace Water Main in Hatchery 12405B22P0118 on USAspending (opens in a new tab) | Upchurch Services LLC | $11,479 | 2 | Competed Open to all |
| Nov 30, 2021 | Planned Service Agreement for Chillers at the USDA-ARS in Stoneville, MS. 12405B22P0030 on USAspending (opens in a new tab) | Johnson Controls Inc | $28,245 | 1 | Not competed Open to all |
| Nov 16, 2021 | Water Treatment/Service Agreement for BLD.7 RO System 12405B22P0019 on USAspending (opens in a new tab) | Freeman Water Treatment of MS, LLC | $2,706 | 1 | Not competed Open to all |
| Jul 26, 2021 | Remove, Furnish, and Install 4 Backflow Preventers 12405B21P0385 on USAspending (opens in a new tab) | Acy Mechanical, LLC | $17,500 | 2 | Competed Small business |
| Apr 28, 2021 | Emergency Water Supply Repair Hatchery, As per the Attached Statement of Work 12405B21P0226 on USAspending (opens in a new tab) | Upchurch Plumbing, Inc. | $23,463 | 1 | Not competed Open to all |
| Nov 6, 2020 | Stoneville Boiler Repairs at Center Research, Stoneville, MS 12445021P0003 on USAspending (opens in a new tab) | W M B, Inc. | $9,679 | 1 | Not competed Open to all |
| Oct 30, 2020 | Contractor Will Provide All Materials, Labor, and Equipment Required to Inspect and Service (2) Trane Water Cooled Chillers Model # CVHE- 050 Centrifugal Water Chillers, with Starters, As Listed in the SOW. Period of Coverage: 11/01/2020-10/31/202 12405B21P0025 on USAspending (opens in a new tab) | Terry Service, Inc | $4,860 | 2 | Competed Open to all |
| Feb 7, 2020 | Repair - Chiller # 2 Leak 12405B20P0111 on USAspending (opens in a new tab) | Terry Service, Inc | $9,345 | 1 | Not competed Open to all |
| Nov 14, 2019 | Contractor Will Provide All Materials, Labor, and Equipment Required to Inspect and Service (2) Trane Water Cooled Chillers Model# CVHE- 050 Centrifugal Water Chillers, with Starters, As Listed in the SOW for the Period of 11/01/2019-10/31/2020. 12405B20P0028 on USAspending (opens in a new tab) | Terry Service, Inc | $4,860 | 2 | Competed Open to all |
| Mar 27, 2019 | Emergency Service for Jetting Sewer Line Out to Unclog Sewer Main Line, in Stoneville, MS. 12405B19P0122 on USAspending (opens in a new tab) | Upchurch Services LLC | $2,636 | 1 | Not competed Open to all |
| Nov 13, 2018 | Contractor Will Provide All Materials, Labor, and Equipment Required to Inspect and Service (2) Trane Water Cooled Chillers Model # CVHE-050 Centrifugal Water Chillers, with Starters, As Listed in the SOW for the Period of 11/01/2018-10/31/2019. 124M5519P0010 on USAspending (opens in a new tab) | Terry Service, Inc | $5,064 | 3 | Competed Open to all |
| Nov 13, 2018 | Contractor Will Provide All Materials, Parts, Labor, and Equipment (100 % Coverage) Required to Inspect and Service (2) Trane Air Cooled Chillers Model 0904X (Serial # U99E08305) and Model 0904X (Serial #U02J06633), with Starters, As Listed in the Attached SOW for the Period of 11/01/2018-10/31/20 124M5519P0011 on USAspending (opens in a new tab) | Trane U.S. Inc. | $15,665 | 3 | Competed Open to all |
| Aug 9, 2018 | Emergency Repair, BLDG. 80 Leaking Cooling Tower Pipes; Contractor Shall Excavate Around and Under (2) 10" Steel Pipes and Support Pipes During Excavation. Remove Section of Leaking 10" Steel Pipe with Sweeping 90 Degree Elbow. De-Water Hole Approx. 10 10 8', Remove Wet Soil from Site and Dispose Off Site. Remove Section of Leaking Pipe, Install and Weld New Pipes Using Certified Welder. Turn on… 1232SD18P0508 on USAspending (opens in a new tab) | Upchurch Services LLC | $7,250 | 1 | Not competed Open to all |
| Jul 19, 2018 | The Work Includes But Is Not Limited to: the Contractor Shall Provide All Labor, Supervision, Tools, Equipment, and Materials Necessary to Remove (1) Existing Galvanized Steel Baltimore Air Coil Cooling Tower and Replace with (1) New Stainless Steel Baltimore Air Coil Cooling Tower. The Objective of This Project Is to Remove (1) Existing Galvanized Steel Baltimore Air Coil Cooling Tower, (Tower… 1232SD18C0031 on USAspending (opens in a new tab) | Teya Services LLC | $167,913 | 1 | Not competed 8(a) |
| Mar 2, 2018 | Furnish and Install 10" SCH 40 Weld Pipe and Insulation and Metal for Condenser Water Piping Under Cooling Tower, BLDG. 2 1232SD18P0182 on USAspending (opens in a new tab) | Upchurch Plumbing, Inc. | $3,231 | 1 | Not competed Open to all |
| Jan 19, 2018 | Demo 80" Existing 30 16" PVC Ducts and Duct Support, Custom Fabricate in-House 80' 30 16' Galvanized Ducts and Install on Site, Furnish and Install Duct Supports at USDA Building 8 Greenhouse. 127B3118P0017 on USAspending (opens in a new tab) | Upchurch Plumbing, Inc. | $3,960 | 1 | Not competed Open to all |
| Oct 27, 2017 | Provide All Materials, Parts, Labor&Equipment (100% Coverage) Required to Inspect and Service (2) Trane Air Cooled Chillers, Model 0904X (Ser # U99E08305) and Model 0904X (Ser # U02JO6633), with Starters Located at BLDG. #8 at the USDA-ARS in Stoneville, MS for the Period of 11/01/17 -10/31/18 per the Attached Statement of Work. 124M5518P0015 on USAspending (opens in a new tab) | Terry Service, Inc | $15,123 | 3 | Competed Open to all |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
Who won
Companies with the most priced awards here, FY2021–FY2025.
| # | Company | Awards | Total value at award |
|---|---|---|---|
| 1 | Johnson Controls, Inc | 4 | $168,588 |
| 2 | W M B, Inc. | 3 | $85,507 |
| 3 | Johnson Controls Inc | 1 | $28,245 |
| 4 | Upchurch Plumbing, Inc. | 1 | $23,463 |
| 5 | Acy Mechanical, LLC | 1 | $17,500 |
| 6 | Upchurch Services LLC | 1 | $11,479 |
| 7 | Mccain Engineering Company, Inc. | 1 | $10,862 |
| 8 | Terry Service, Inc | 1 | $4,860 |
| 9 | Freeman Water Treatment of MS, LLC | 1 | $2,706 |
How the work was bought
Competition
Was the work open to bids?
- Competed 7 (50%)
A standalone contract that was open to bids.
- Not competed 7 (50%)
Sole-source: only one company was asked.
Set-asides
Set-aside = reserved for a group of businesses.
- Open to all 12 (86%)
No set-aside: any size of business could bid.
- Small business 2 (14%)
Only small businesses could bid.
Contracting offices buying here
Other trades in this area
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.