Metro area
Federal construction & facilities contracts in the Saginaw, MI area
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Open bids here now
No open bids here right now. Updated weekly from SAM.gov · data through Oct 25. Save this search
Typical award (median)
$52,829
The middle of 50 priced awards, FY2021–FY2025. Half were between $22.6k and $248k.
Typical number of bids
2
Median bids per award, reported for 25 of 25 competed awards. 40% drew only one bid.
Won by small businesses
78%
Share of the 50 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award in the Saginaw, MI area was $52.8k (FY2021-FY2025, 50 priced awards).
- That is 8% higher than the median for all construction & facilities work in Michigan ($48.9k).
- Competed awards drew a median of 2 offers (reported for 25 of 25).
- 40% of competed awards drew only one offer.
- Small businesses won 78% of priced awards.
- Tip 60% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
- Tip The typical award drew only 2 bids. Less competition can mean a better chance for a new bidder.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work in the Saginaw, MI area
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 7 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 10 | $23,334 |
| FY2017 | 12 | $32,160 |
| FY2018 | 15 | $135,700 |
| FY2019 | 17 | $16,808 |
| FY2020 | 11 | $11,631 |
| FY2021 | 15 | $40,244 |
| FY2022 | 12 | $70,528 |
| FY2023 | 10 | $42,019 |
| FY2024 | 6 | $28,572 |
| FY2025 | 7 | $293,753 |
| FY2026 (provisional) | 5 | $39,815 |
Award sizes
- Holds the median award, $52,829
Recent awards
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | ||||
|---|---|---|---|---|---|
| Jun 25, 2026 | Saginaw Federal Building, Saginaw, MI. Removal of the Existing Fan Assembly and Installation of New Assembly. 47PE5626F0359 on USAspending (opens in a new tab) Offers from IDIQ | Multi Air Services Engineers, Corp | $24,009 | 1 from the IDIQ | Order (single-award IDIQ) Small business |
| May 4, 2026 | Mi Shiawassee NWR Electric Upgrade 140FC226P0026 on USAspending (opens in a new tab) | Helm Electric Inc | $4,964 | 10 | Competed Small business |
| Apr 27, 2026 | IIJA Funds, 2025 Outdoor Eg Baseline Conduct Site Survey Travel, Report and Design Funding for Install of Outdoor Eg with Subbase Tank per Attached SOW at Freeland, Mi ASR: 18026534 6973GH26F00733 on USAspending (opens in a new tab) | Quad J Inc | $39,815 | 15 | Order (multiple-award IDIQ) Open to all |
| Apr 9, 2026 | FY26 Saginaw River Maintenance Dredging W911XK26CA012 on USAspending (opens in a new tab) | Dean Marine and Excavating, Inc. | $1,782,505 | 2 | Competed Small business |
| Dec 11, 2025 | Electrical Inspection, Testing & Maintenance 36C25026P0198 on USAspending (opens in a new tab) | Individual contractor (name withheld) | $249,999 | 5 | Competed Small business |
| Sep 24, 2025 | Chiller Replacement, MBS ATCT, Freeland Mi. 697DCK25F01040 on USAspending (opens in a new tab) | J & J 2000 Inc | $293,753 | 1 | Order (single-award IDIQ) Open to all |
| Sep 17, 2025 | IIJA Funded. Freeland, Mi (MBS) ASR: 18066401 This Unilateral Award Is for the Construction Cost of the UPS and UPS Ancillary Equipment Removal and Installation at Freeland, Mi (MBS) ASR Which Includes a Full Power Systems Study of the Facility. 6973GH25F01406 on USAspending (opens in a new tab) | Port Graham Development Corporation | $96,808 | 3 | Order (multiple-award IDIQ) Open to all |
| Aug 27, 2025 | EHRM Installation 655-25-706 36C25025C0157 on USAspending (opens in a new tab) | Veterans Construction of America Inc | $84,848 | 4 | Competed Veteran-owned |
| Aug 19, 2025 | Energy Center Water Heater 655-23-201 36C25025C0137 on USAspending (opens in a new tab) | Robbert Construction, Inc | $869,741 | 2 | Competed Veteran-owned |
| Jun 2, 2025 | The Contractor Shall Furnish All Labor, Materials, Tools, Equipment, and Supervision Necessary to Perform and Complete the Work Associated with Project #655-401, "Expand Medical Center - Saginaw Site", in Support of the Saginaw VA Medical Center 36C77625C0036 on USAspending (opens in a new tab) | Coastal Construction Group, LLC | $10,618,000 | 5 | Competed Veteran-owned |
| Feb 19, 2025 | Boiler Maintenance 1YR 36C25025P0688 on USAspending (opens in a new tab) | Dean Boiler Inc | $26,451 | 1 | Not competed Open to all |
| Dec 20, 2024 | Atrium Renovation Building 22 Project # 655-20-202 36C25025C0031 on USAspending (opens in a new tab) | Cavu Consulting LLC | $1,370,000 | 6 | Competed Veteran-owned |
| Jul 17, 2024 | Automatic Door Preventative Maintenance 36C25024P1189 on USAspending (opens in a new tab) | Assa Abloy Entrance Systems US Inc. | $34,500 | 1 | Not competed Open to all |
| Jun 12, 2024 | Contractor Shall Provide All Labor, Equipment & Materials to Perform Baseline Water Testing for Legionella, Coliform Including, Lead & Copper at Flint, Mi Federal Building, Flint, Mi & Saginaw Mi Social Security Administration 47PF0024F0690 on USAspending (opens in a new tab) Offers from IDIQ | Multi Air Services Engineers, Corp | $6,808 | 1 from the IDIQ | Order (single-award IDIQ) Small business |
| May 14, 2024 | Blowdown Piping Replacement Urgent and Compelling 36C25024C0121 on USAspending (opens in a new tab) Equipment purchase | Monarch Welding & Engineering Inc | $55,250 | 1 | Competed Open to all |
| Mar 21, 2024 | Contractor Shall Provide All Labor, Equipment and Materials to Replace Damaged Doors at the Social Security Administration Building in Saginaw, Mi and, Repair Chilled Water Pumps 1 & 2 at the Flint, Mi Federal Building and U.S. Courthouse. 47PF0024F0436 on USAspending (opens in a new tab) Offers from IDIQ | Multi Air Services Engineers, Corp | $22,643 | 1 from the IDIQ | Order (single-award IDIQ) Small business |
| Dec 22, 2023 | Removal of UST and Replacement with AST, Project Number 655-22-202 36C25024C0040 on USAspending (opens in a new tab) | Individual contractor (name withheld) | $580,829 | 1 | Competed Veteran-owned |
| Dec 6, 2023 | 3 Oxygen Probes to Repair Three Boilers 36C25024P0371 on USAspending (opens in a new tab) | Banner Engineering & Sales Inc | $20,733 | 1 | Not competed Open to all |
| Nov 16, 2023 | Saginaw River Maintenance Dredging and Confined Disposal Facility and Dredged Material Disposal Facility Maintenance W911XK24F0001 on USAspending (opens in a new tab) | Morrish-Wallace Construction, Inc. | $4,514,316 | 3 | Order (multiple-award IDIQ) Small business |
| Aug 22, 2023 | Dental HVAC Upgrade 655-20-204 - IFB 36C25023C0151 on USAspending (opens in a new tab) | Cavu Consulting LLC | $425,000 | 3 | Competed Veteran-owned |
| Aug 9, 2023 | MI053 Replace MEP Fence W911SA23F2073 on USAspending (opens in a new tab) Offers from IDIQ | West Coast JV-II, LLC. | $106,007 | 5 from the IDIQ | Order (single-award IDIQ) HUBZone |
| May 3, 2023 | 655-21-101 Renovate Secondary Sterile Supply Closets - Commissioning PO 655C20153 36C25023F0497 on USAspending (opens in a new tab) | Dav Energy Solutions, Inc. | $52,080 | 4 | Order (multiple-award IDIQ) Veteran-owned |
| Apr 13, 2023 | Material Procurement- Long Lead Items for ELD Project at Freeland, Mi (MBS). 6973GH23F00962 on USAspending (opens in a new tab) | Wells Global, LLC | $138,353 | 1 | Order (multiple-award IDIQ) Open to all |
| Apr 5, 2023 | Boiler Repair 36C25023P0949 on USAspending (opens in a new tab) | Banner Engineering & Sales Inc | $5,946 | 1 | Competed Small business |
| Mar 29, 2023 | Penthouse Union Repair Saginaw 36C25023P0897 on USAspending (opens in a new tab) | Monarch Welding & Engineering Inc | $7,875 | 2 | Competed Open to all |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
Who won
Companies with the most priced awards here, FY2021–FY2025.
| # | Company | Awards | Total value at award |
|---|---|---|---|
| 1 | WFV 2 Construction LLC | 6 | $920,906 |
| 2 | Advantage Mechanical-Refrigeration, Inc. | 5 | $346,553 |
| 3 | Walter Mechanical Services Inc | 3 | $911,722 |
| 4 | Multi Air Services Engineers, Corp | 3 | $39,615 |
| 5 | Banner Engineering & Sales Inc | 3 | $33,721 |
| 6 | Cavu Consulting LLC | 2 | $1,795,000 |
| 7 | Siemens Industry Inc | 2 | $499,000 |
| 8 | West Coast JV-II, LLC. | 2 | $349,715 |
| 9 | Dav Energy Solutions, Inc. | 2 | $104,160 |
| 10 | John E. Green Company | 2 | $82,500 |
How the work was bought
Competition
Was the work open to bids?
- Order (single-award IDIQ) 19 (38%)
A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.
- Competed 13 (26%)
A standalone contract that was open to bids.
- Order (multiple-award IDIQ) 12 (24%)
A task order placed under an IDIQ held by several companies, who competed for it.
- Not competed 6 (12%)
Sole-source: only one company was asked.
Set-asides
Set-aside = reserved for a group of businesses.
- Open to all 20 (40%)
No set-aside: any size of business could bid.
- Veteran-owned 15 (30%)
Reserved for service-disabled veteran-owned (SDVOSB) or veteran-owned (VOSB) small businesses.
- Small business 9 (18%)
Only small businesses could bid.
- 8(a) 4 (8%)
Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.
- HUBZone 2 (4%)
Reserved for small businesses in a Historically Underutilized Business Zone.
Left out of the numbers above: 1 equipment purchase. Why?
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| 36C25019D0100 | Single-award The IDIQ drew 4 offers | 6 | Sep 30, 2024 |
| N4008518D3003 | Single-award The IDIQ drew 1 offers | 4 | Apr 30, 2023 |
| 47PF0023A0003 | Single-award The IDIQ drew 1 offers | 2 | Feb 28, 2027 |
| GS00F314GA | Multiple-award | 2 | Aug 9, 2027 |
| GS05P16SAD7014 | Single-award The IDIQ drew 1 offers | 2 | Feb 28, 2022 |
Contracts ending soon
Recurring work whose current contract ends within 18 months, so the agency will likely buy it again (a "recompete"). The company doing it today is the incumbent.
-
Ordering period ends Oct 31, 2026
PSG IDIQ Contract for Site Survey, Design and Installation
Incumbent: Port Graham Development Corporation Buyer: Franchise Acquisition Services
6973GH22D00013 on USAspending (opens in a new tab) -
Ordering period ends Oct 31, 2026
PSG IDIQ Contract for Site Survey, Design and Installation
Incumbent: Quad J Inc Buyer: Franchise Acquisition Services
6973GH22D00014 on USAspending (opens in a new tab) -
Ordering period ends Oct 31, 2026
PSG IDIQ Contract for Site Survey, Design and Installation
Incumbent: Wells Global, LLC Buyer: Franchise Acquisition Services
6973GH22D00017 on USAspending (opens in a new tab)
2 more contracts end in the next 18 months. The full recompete radar is part of FedComps Pro (coming soon).
Join the free waitlistTrades in this area
Other metro areas
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.