Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Open Electrical bids here now
No open Electrical bids here right now. Updated weekly from SAM.gov · data through Oct 25. Save this search
Typical award (median)
$114,234
The middle of 95 priced awards, FY2021–FY2025. Half were between $38.7k and $228k.
Typical number of bids
3.5
Median bids per award, reported for 66 of 66 competed awards. 27% drew only one bid.
Won by small businesses
93%
Share of the 95 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle electrical award in the Phoenix, AZ area was $114k (FY2021-FY2025, 95 priced awards).
- That is 35% higher than the median for electrical in Arizona ($84.6k).
- Competed awards drew a median of 3.5 offers (reported for 66 of 66).
- 27% of competed awards drew only one offer.
- In FY2025 the middle award was $114k, down 55% from FY2024 ($254k).
- Tip 45% of these awards were task orders under multiple-award contracts (MATOCs). To compete for those, you first need a spot on one of the umbrella contracts.
FedComps Pro · coming soon · free waitlist
Get alerts for new electrical work in the Phoenix, AZ area
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 10 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 87 | $14,460 |
| FY2017 | 16 | $18,961 |
| FY2018 | 49 | $5,040 |
| FY2019 | 69 | $30,201 |
| FY2020 | 33 | $76,951 |
| FY2021 | 30 | $61,790 |
| FY2022 | 21 | $158,018 |
| FY2023 | 22 | $144,489 |
| FY2024 | 12 | $254,207 |
| FY2025 | 10 | $114,234 |
| FY2026 (provisional) | 13 | $35,100 |
Award sizes
- Holds the median award, $114,234
Recent awards
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | ||||
|---|---|---|---|---|---|
| Sep 8, 2026 | PHX ARSR Exterior Radome Lighting 697DCK26C00253 on USAspending (opens in a new tab) Provisional | Wam Industries, Incorporated | $48,800 | 2 | Competed Open to all |
| Sep 1, 2026 | Power Factor Correction Capacitor Repairs 12639526P0239 on USAspending (opens in a new tab) Provisional | Eaton Corporation | $18,720 | 1 | Not competed Open to all |
| Aug 13, 2026 | Reroute Power Supply in Kitchen - Reroute 2" Conduit That Is Causing a Major Tripping Hazard. 12639526C0042 on USAspending (opens in a new tab) Provisional | New Phase Electrical LLC | $15,971 | 2 | Competed Small business |
| Aug 7, 2026 | Install Receptacles, Phoenix, AZ 89503126CWA000154 on USAspending (opens in a new tab) Provisional | New Phase Electrical LLC | $14,991 | 14 | Competed Small business |
| Jun 1, 2026 | Emergency Electrical Services for Multiple Recreation Sites 140L6426P0008 on USAspending (opens in a new tab) | Individual contractor (name withheld) | $12,000 | 1 | Not competed Open to all |
| Mar 13, 2026 | Underground Boring 140A1126P0020 on USAspending (opens in a new tab) | Liberty-Gandy Pipeline Services of Arizona, LLC | $119,633 | 1 | Not competed Open to all |
| Feb 23, 2026 | 25Z6AC5 - Upgrade Fire Detection System FCI Phoenix 15BBNF26C00000025 on USAspending (opens in a new tab) | Ocs Construction Services Inc | $4,968,036 | 11 | Competed Small business |
| Feb 2, 2026 | The FAA Albuquerque Air Route Traffic Control Center Artcc Requires the Installation of Air Curtains at Cafeteria Entrance, Loading Dock and Control Room East Emergency Doors. Work Within This Area Will Require an Escort and Must Be Coordinated 6973GH26C00016 on USAspending (opens in a new tab) | Individual contractor (name withheld) | $48,220 | 4 | Competed Small business |
| Jan 14, 2026 | Furnish and Install Speakers 36C26226P0326 on USAspending (opens in a new tab) | Citizen Contracting Group LLC | $19,932 | 4 | Competed Small business |
| Jan 12, 2026 | Eg Funded Site Survey Travel & Report, and Design Funding for the Eg PMO LED Power System Replacement Projects at Phoenix, AZ LOC: 19005961 6973GH26F00247 on USAspending (opens in a new tab) | Sentinel Power Services, LLC | $34,885 | 15 | Order (multiple-award IDIQ) Open to all |
| Dec 4, 2025 | Continuation of Reverse Engineering Upgrades in Line with Task Order FA488725F0036. FA488726F0023 on USAspending (opens in a new tab) Offers from IDIQ | A3 Systems Corporation | $202,565 | 1 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Nov 21, 2025 | Holiday Lighting Decor FA488726P0005 on USAspending (opens in a new tab) | Arkose Group LLC | $35,100 | 29 | Competed Small business |
| Oct 7, 2025 | F-35 Hangar Pop-Up Barrier Maintenance - Order Year 4 FA488726F0002 on USAspending (opens in a new tab) Offers from IDIQ | A3 Systems Corporation | $205,304 | 1 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Sep 30, 2025 | Luke AFB Chapel Sound System Upgrade FA488725P0089 on USAspending (opens in a new tab) | GDL Solutions, Inc. | $40,813 | 11 | Competed Small business |
| Apr 17, 2025 | Diagnose for Repair a Power Correction Factor Capacitor Bank 12639525P0179 on USAspending (opens in a new tab) | Eaton Corporation | $3,135 | 1 | Not competed Open to all |
| Apr 16, 2025 | F-35 Hangar Pop-Up Barrier Maintenance FA488725F0036 on USAspending (opens in a new tab) Offers from IDIQ | A3 Systems Corporation | $83,321 | 1 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Feb 3, 2025 | Emerg. Replace F/S TRANSFORMER-25Z6AC1 15B60825P00000034 on USAspending (opens in a new tab) | High Side Electric LLC | $15,213 | 1 | Competed Small business |
| Dec 17, 2024 | FCI PHX_ (24Z6AV4) Emergency Repair Generator and High Voltage Line 15BFA025C00000006 on USAspending (opens in a new tab) | Midwest Electrical Construction Inc | $2,377,700 | 4 | Competed Small business |
| Dec 13, 2024 | BIL Funds. Construction Cost of UPS and the UPS Ancillary Equipment Removal and Installation at the Phoenix, AZ ARSR (AZ1) per the RFQ-25-01 Bid Package. 19004792 Includes Option #1 Full Arc Flash Hazard Analysis of the Facility 6973GH25F00239 on USAspending (opens in a new tab) | Quad J Inc | $177,026 | 1 | Order (multiple-award IDIQ) Open to all |
| Dec 13, 2024 | BIL Funds. Construction Cost of UPS and the UPS Ancillary Equipment Removal and Installation at the Scottsdale, AZ ASR per the RFQ-25-01 (AZ1) Bid Package. 24012597 Includes Option #1 Full Arc Flash Hazard Analysis of the Facilit 6973GH25F00241 on USAspending (opens in a new tab) | Quad J Inc | $130,333 | 1 | Order (multiple-award IDIQ) Open to all |
| Dec 13, 2024 | BIL Funds. Construction Cost of UPS and the UPS Ancillary Equipment Removal and Installation at the Phoenix, AZ SMR-1 per the RFQ-25-01 (AZ1) Bid Package. 18065822 Includes Option #1 Full Arc Flash Hazard Analysis of the FAC 6973GH25F00242 on USAspending (opens in a new tab) | Quad J Inc | $114,234 | 1 | Order (multiple-award IDIQ) Open to all |
| Dec 13, 2024 | BIL Funds. Construction Cost of UPS and the UPS Ancillary Equipment Removal and Installation at the Phoenix, AZ SMR-2 (AZ1) per the RFQ-25-01 Bid Package. 18065823 Includes Option #1 Full Arc Flash Hazard Analysis of the FAC 6973GH25F00244 on USAspending (opens in a new tab) | Quad J Inc | $114,234 | 1 | Order (multiple-award IDIQ) Open to all |
| Oct 1, 2024 | F-35 Hangar Pop-Up Barrier Maintenance FA488725F0006 on USAspending (opens in a new tab) Offers from IDIQ | A3 Systems Corporation | $197,077 | 1 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Sep 18, 2024 | Arc Flash Analysis 140R3024P0074 on USAspending (opens in a new tab) | Peterson Energy Group LLC | $159,950 | 12 | Competed Small business |
| Sep 16, 2024 | Provide and Install (2) 225A Panels in the Data Server Room Fed from Existing Panels, DCA. Feeders Will Be Rated for 150 Amps with 150 Amp Main Breakers. Installation of (8) 30A L6-30R Outlets Along with Their 30A L6 -30R Plugs and Whips 89503124CWA000105 on USAspending (opens in a new tab) | Individual contractor (name withheld) | $78,730 | 1 | Not competed 8(a) |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
Who won
Companies with the most priced awards here, FY2021–FY2025.
| # | Company | Awards | Total value at award |
|---|---|---|---|
| 1 | C.N.S. Communications, LLC | 20 | $3,160,639 |
| 2 | Sentinel Power Services, LLC | 17 | $2,707,514 |
| 3 | Quad J Inc | 5 | $567,712 |
| 4 | NSP-BCH-Ucc LLC | 4 | $1,183,352 |
| 5 | A3 Systems Corporation | 4 | $614,718 |
| 6 | Welch Companies Inc | 4 | $88,928 |
| 7 | KWR Construction Inc | 2 | $206,097 |
| 8 | Kerns Construction, LLC | 1 | $11,927,200 |
| 9 | Numunu Staffing LLC | 1 | $5,863,473 |
| 10 | Hoolaulima Government Solutions, LLC | 1 | $2,583,072 |
How the work was bought
Competition
Was the work open to bids?
- Order (multiple-award IDIQ) 43 (45%)
A task order placed under an IDIQ held by several companies, who competed for it.
- Competed 23 (24%)
A standalone contract that was open to bids.
- Not competed 19 (20%)
Sole-source: only one company was asked.
- Order (single-award IDIQ) 10 (11%)
A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.
Set-asides
Set-aside = reserved for a group of businesses.
- Open to all 52 (55%)
No set-aside: any size of business could bid.
- 8(a) 19 (20%)
Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.
- Small business 15 (16%)
Only small businesses could bid.
- Veteran-owned 4 (4%)
Reserved for service-disabled veteran-owned (SDVOSB) or veteran-owned (VOSB) small businesses.
- Indian / tribal 4 (4%)
Reserved for Indian-owned or tribal enterprises (Buy Indian Act, ISBEE).
- HUBZone 1 (1%)
Reserved for small businesses in a Historically Underutilized Business Zone.
Left out of the numbers above: 11 equipment purchases, 6 cancelled or $0 awards. Why?
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| 6973GH22D00015 | Multiple-award The IDIQ drew 15 offers | 12 | Oct 31, 2026 |
| 6973GH22D00009 | Multiple-award The IDIQ drew 15 offers | 11 | Oct 31, 2026 |
| DTFAAC16D00008 | Multiple-award The IDIQ drew 18 offers | 9 | May 3, 2021 |
| 6973GH22D00014 | Multiple-award The IDIQ drew 15 offers | 5 | Oct 31, 2026 |
| DTFAAC16D00017 | Multiple-award The IDIQ drew 18 offers | 5 | May 3, 2021 |
Contracts ending soon
Recurring work whose current contract ends within 18 months, so the agency will likely buy it again (a "recompete"). The company doing it today is the incumbent.
-
Ordering period ends Oct 31, 2026
PSG IDIQ Contract for Site Survey, Design and Installation
Incumbent: C.N.S. Communications, LLC Buyer: Franchise Acquisition Services
6973GH22D00009 on USAspending (opens in a new tab) -
Ordering period ends Oct 31, 2026
PSG IDIQ Contract for Site Survey, Design and Installation
Incumbent: Quad J Inc Buyer: Franchise Acquisition Services
6973GH22D00014 on USAspending (opens in a new tab) -
Ordering period ends Oct 31, 2026
PSG IDIQ Contract for Site Survey, Design and Installation
Incumbent: Sentinel Power Services, LLC Buyer: Franchise Acquisition Services
6973GH22D00015 on USAspending (opens in a new tab)
3 more contracts end in the next 18 months. The full recompete radar is part of FedComps Pro (coming soon).
Join the free waitlistOther trades in this area
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.