Metro area
Building Construction contracts in the Lawton, OK area
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Open Building Construction bids here now
No open Building Construction bids here right now. Updated weekly from SAM.gov · data through Oct 25. Save this search
Typical award (median)
$1,049,949
The middle of 136 priced awards, FY2021–FY2025. Half were between $231k and $3.4M.
Typical number of bids
3
Median bids per award, reported for 68 of 68 competed awards. 19% drew only one bid.
Won by small businesses
93%
Share of the 136 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle building construction award in the Lawton, OK area was $1M (FY2021-FY2025, 136 priced awards).
- That is 5.4 times the median for building construction in Oklahoma ($195k).
- Competed awards drew a median of 3 offers (reported for 68 of 68).
- 19% of competed awards drew only one offer.
- In FY2025 the middle award was $2.7M, up 109% from FY2024 ($1.3M).
- Tip 43% of these awards were task orders under multiple-award contracts (MATOCs). To compete for those, you first need a spot on one of the umbrella contracts.
- Tip 92% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work in the Lawton, OK area
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 22 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 18 | $578,485 |
| FY2017 | 26 | $378,377 |
| FY2018 | 28 | $591,440 |
| FY2019 | 32 | $608,029 |
| FY2020 | 25 | $333,005 |
| FY2021 | 29 | $1,680,258 |
| FY2022 | 30 | $526,916 |
| FY2023 | 29 | $552,385 |
| FY2024 | 26 | $1,303,473 |
| FY2025 | 22 | $2,724,754 |
| FY2026 (provisional) | 6 | $65,792 |
Award sizes
- Holds the median award, $1,049,949
Recent awards
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | ||||
|---|---|---|---|---|---|
| Jul 30, 2026 | Task Order Fire Riser Repair, Lawton, OK, Indian Health Services 75H71126F27006 on USAspending (opens in a new tab) Provisional Offers from IDIQ | Crutcho Creek Farms LLC | $55,818 | 1 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Jun 16, 2026 | USMS Carpet and Paint at the Lawton Federal Building Lawton, OK 73501 47PD5226P0005 on USAspending (opens in a new tab) | Nativefusion, LLC | $87,625 | 1 | Competed HUBZone |
| May 19, 2026 | Restoration of Lawton Federal Building/U.S. Courthouse Lawton, OK 73501 47PD5226F0214 on USAspending (opens in a new tab) | Weil Construction Inc | $1,783,024 | 4 | Order (multiple-award IDIQ) Small business |
| May 12, 2026 | OK0074ZZ, OK0511OC, Lawton Courthouse, GSA Admin BLDG in OKC, Reroute Sewer & Waterline Repair Lawton Federal BLDG/Courthouse Lawton, OK 73501 47PD5226P0003 on USAspending (opens in a new tab) | Nativefusion, LLC | $45,906 | 1 | Competed HUBZone |
| Mar 11, 2026 | Task Order 27004 for Lawton Indian Hospital Stucco Project, Lawton, Oklahoma 75H71126F27004 on USAspending (opens in a new tab) Offers from IDIQ | Crutcho Creek Farms LLC | $53,697 | 1 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Nov 6, 2025 | Task Order Modular Building Transformer Pad and Electrical Hookup, Lawton Indian Hospital, Lawton, Oklahoma 75H71126F27003 on USAspending (opens in a new tab) Offers from IDIQ | Crutcho Creek Farms LLC | $75,767 | 1 from the IDIQ | Order (single-award IDIQ) 8(a) |
| Sep 30, 2025 | Building 6050 Repair - Water and Parapet Damage at Fort Sill, Oklahoma. W912BV25C0019 on USAspending (opens in a new tab) | Tatitlek Universal Services Inc | $1,270,595 | 1 | Not competed 8(a) |
| Sep 25, 2025 | Building Series 2700 HVAC and Plumbing Repairs at Ft Sill, Oklahoma. W912BV25FA070 on USAspending (opens in a new tab) | Sheffield Construction, L.L.C. | $10,463,449 | 3 | Order (multiple-award IDIQ) Woman-owned |
| Sep 23, 2025 | This Project Involves Roof Replacement of Section 51, Which Is Approximately 23,500 Square Feet. This Section Will Further Describe the Scope of Work Associated with the Roof Replacement. W912BV25FA061 on USAspending (opens in a new tab) | Southwind Construction Services, LLC | $780,771 | 3 | Order (multiple-award IDIQ) Small business |
| Sep 22, 2025 | Construct a New Law ATCT at the Lawton Fort-Sill Regional Airport in Lawton, OK 697DCK25C00252 on USAspending (opens in a new tab) Unusually large | Structsure Projects Inc | $63,871,352 | 3 | Competed Open to all |
| Sep 22, 2025 | Replace HVAC Buildings 4401- 4404 W9124L25FA017 on USAspending (opens in a new tab) | Mikocorp LLC | $3,309,006 | 2 | Order (multiple-award IDIQ) 8(a) |
| Sep 17, 2025 | The Intent of the Project Is to Repair/Replace Roofing Systems on Buildings 3030, 1953, 5030, 5031, 3260, 4100, 6033, and 3166. W912BV25FA053 on USAspending (opens in a new tab) | Southwind Construction Services, LLC | $4,129,675 | 3 | Order (multiple-award IDIQ) Small business |
| Sep 5, 2025 | Task Order Award to Repair Leaking Irrigation Main at Fort Sill National Cemetery 36C78625N0750 on USAspending (opens in a new tab) | US Diversified Contracting Services Inc. | $82,898 | 3 | Order (multiple-award IDIQ) Veteran-owned |
| Sep 2, 2025 | Replace Two (2) Existing Air Handling Units in Building 4301. This Project Will Consist of Two (2) Tasks. Task 1 Is the Base to Design and Replace AHU 175/MECH Room 1H167 and Task 2 Is the Option to Design and Replace AHU 55/MECH Room GE150. W912DY25FA046 on USAspending (opens in a new tab) | Spectrum Solutions Inc | $2,804,442 | 5 | Order (multiple-award IDIQ) Open to all |
| Aug 28, 2025 | The Intent of the Project Is to Repair the Laminated Shingle Roofing Systems on Building 1950, to Repair the Existing Composite Roofing System Consisting of Asphalt Shingle and TPO on Building 1948, to Repair the Existing Composite Roofing System W912BV25FA036 on USAspending (opens in a new tab) | Trumble Construction LLC | $3,499,787 | 3 | Order (multiple-award IDIQ) Small business |
| Aug 27, 2025 | United States Marshal Service Electronic Safety and Security Lawton Federal Building and Courthouse, Lawton, OK 73501 47PH0625F0049 on USAspending (opens in a new tab) Offers from IDIQ | MGS Construction Services Inc. | $36,039 | 4 from the IDIQ | Order (single-award IDIQ) HUBZone |
| Aug 26, 2025 | The Intent of the Project Is to Repair the Clay Barrel Tile and TPO Roof on Building 2025, to Replace the Existing TPO Roofs with a New WITH135 Mil Back W912BV25FA033 on USAspending (opens in a new tab) | Trumble Construction LLC | $2,197,859 | 3 | Order (multiple-award IDIQ) Small business |
| Aug 7, 2025 | The Intent of the Project Is to Replace the Existing Flat Roofing Systems on Buildings 707, 730, 751, and to Replace Broken Clay Tiles and Flat Roofing System on Building 652. W912BV25FA030 on USAspending (opens in a new tab) | L. Wallace Construction Company Inc. | $4,322,174 | 3 | Order (multiple-award IDIQ) Small business |
| Aug 7, 2025 | Fort Sill FY25 Roof Package 5 - W44XGQ52123814 W912BV25FA031 on USAspending (opens in a new tab) | Trumble Construction LLC | $4,146,879 | 3 | Order (multiple-award IDIQ) Small business |
| Aug 6, 2025 | Construction MATOC - Replace Geothermal with Chiller 36C25925N0519 on USAspending (opens in a new tab) | Individual contractor (name withheld) | $713,730 | 2 | Order (multiple-award IDIQ) Veteran-owned |
| Jul 30, 2025 | W44XGQ52063481 the Intent of the Project Is to Replace the Existing Flat Roofing Systems on Building 840 and 1490, and to Replace the Existing Laminated Shingle Roofing System at Building 1279. W912BV25FA027 on USAspending (opens in a new tab) | Trumble Construction LLC | $4,108,785 | 3 | Order (multiple-award IDIQ) Small business |
| Jul 18, 2025 | The Work to Be Performed Under This Project Consists of Providing the Labor, Equipment, and Materials to Repair the Roofs of Building 935, 2605, and 3020 As Described in Drawings, Specifications and Contract Documents. W9124L25FA007 on USAspending (opens in a new tab) | Mikocorp LLC | $2,645,066 | 4 | Order (multiple-award IDIQ) 8(a) |
| Jul 18, 2025 | This Project Consists of Providing the Labor, Equipment, and All Required Materials to Complete the Work Repairing Damaged Roofs at Buildings 1803, 1501, 1502, Etc. Ft. Sill, Oklahoma. W9124L25FA008 on USAspending (opens in a new tab) | Power Washing Extreme, Inc. (DBA) Pwe, Inc. | $1,948,935 | 4 | Order (multiple-award IDIQ) 8(a) |
| Jul 17, 2025 | Award of the Base and Options 1-5 for Buildings 455, 462, 461, 467, 475, 463 via PRC W44XGQ51962985 W912BV25FA021 on USAspending (opens in a new tab) | L. Wallace Construction Company Inc. | $6,432,687 | 3 | Order (multiple-award IDIQ) Small business |
| Jul 10, 2025 | The Work to Be Performed Under This Project Consists of Providing the Labor, Equipment, and Materials to Complete the Work for Repair Underground Feeder 5B As Described in Drawings, Specifications and Contract Documents. W9124L25FA005 on USAspending (opens in a new tab) | Mikocorp LLC | $840,811 | 4 | Order (multiple-award IDIQ) 8(a) |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
Who won
Companies with the most priced awards here, FY2021–FY2025.
| # | Company | Awards | Total value at award |
|---|---|---|---|
| 1 | Power Washing Extreme, Inc. (DBA) Pwe, Inc. | 25 | $28,593,896 |
| 2 | Ready Services, LLC | 11 | $14,685,466 |
| 3 | Mikocorp LLC | 10 | $20,144,193 |
| 4 | Fsa Construction, LLC | 9 | $10,866,681 |
| 5 | Trumble Construction LLC | 6 | $22,707,146 |
| 6 | SDJV | 5 | $9,223,844 |
| 7 | Iscani Industries LLC | 5 | $2,899,709 |
| 8 | L. Wallace Construction Company Inc. | 4 | $17,178,211 |
| 9 | Cci General Contractors, LLC | 4 | $8,665,586 |
| 10 | Structsure Projects Inc | 3 | $114,395,025 |
How the work was bought
Competition
Was the work open to bids?
- Order (multiple-award IDIQ) 59 (43%)
A task order placed under an IDIQ held by several companies, who competed for it.
- Order (single-award IDIQ) 53 (39%)
A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.
- Not competed 15 (11%)
Sole-source: only one company was asked.
- Competed 9 (7%)
A standalone contract that was open to bids.
Set-asides
Set-aside = reserved for a group of businesses.
- 8(a) 92 (68%)
Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.
- Small business 22 (16%)
Only small businesses could bid.
- Open to all 11 (8%)
No set-aside: any size of business could bid.
- Veteran-owned 6 (4%)
Reserved for service-disabled veteran-owned (SDVOSB) or veteran-owned (VOSB) small businesses.
- Woman-owned 4 (3%)
Reserved for woman-owned small businesses (WOSB/EDWOSB).
- HUBZone 1 (1%)
Reserved for small businesses in a Historically Underutilized Business Zone.
Contracting offices buying here
- MICC Fort Sill
- USACE Tulsa District
- National Cemetery Administration
- Division of Engineering Services - Seattle
- GSA PBS Region 7 - Non-Prospectus - Northern
- USACE Engineering and Support Center, Huntsville
- FWS, GAOA
- VA Network Contracting Office 19
- Franchise Acquisition Services
- Regional Acquisitions Services
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| W9124L21D0003 | Single-award The IDIQ drew 1 offers | 11 | Jun 14, 2024 |
| W9124L23D0003 | Multiple-award The IDIQ drew 19 offers | 10 | May 31, 2028 |
| W9124L20D0011 | Single-award The IDIQ drew 1 offers | 9 | Sep 8, 2025 |
| W9124L20D0005 | Single-award The IDIQ drew 1 offers | 6 | Apr 12, 2023 |
| W9124L23D0005 | Multiple-award The IDIQ drew 19 offers | 6 | May 31, 2028 |
Contracts ending soon
Recurring work whose current contract ends within 18 months, so the agency will likely buy it again (a "recompete"). The company doing it today is the incumbent.
-
Ordering period ends Jul 31, 2027
FY23 General Construction Contractor IDIQ Contracts
Incumbent: Power Washing Extreme, Inc. (DBA) Pwe, Inc. Buyer: Franchise Acquisition Services
6973GH23D00102 on USAspending (opens in a new tab) -
Ordering period ends Sep 21, 2027
WOSB MATOC for Construction in USACE SWD Boundaries
Incumbent: Gideon Contracting, Limited Liability Company Buyer: USACE Tulsa District
W912BV22D0020 on USAspending (opens in a new tab) -
Ordering period ends Sep 21, 2027
WOSB MATOC for Construction in USACE SWD Boundaries
Incumbent: National Native American Construction, Inc. Buyer: USACE Tulsa District
W912BV22D0022 on USAspending (opens in a new tab)
1 more contract ends in the next 18 months. The full recompete radar is part of FedComps Pro (coming soon).
Join the free waitlistOther trades in this area
Nearby
- Building Construction at Fort Sill
- Building Construction in the Wichita Falls, TX area
- Building Construction in the Altus, OK area
- Building Construction in the Oklahoma City, OK area
- Building Construction in the Sherman, TX area
- Building Construction in the Enid, OK area
- Building Construction in the Dallas, TX area
- Building Construction in the Bonham, TX area
- Building Construction in the Abilene, TX area
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.