Typical award won (median)
$9,984,111
The middle of 74 priced awards, FY2021–FY2025. Half were between $4.5M and $20.6M.
Typical bids faced
3
Median bids per award, reported for 53 of 53 competed awards. 17% drew only one bid.
Won as a small business
0%
Share of the 74 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award won by Manson Construction Co was $10M (FY2021-FY2025, 74 priced awards).
- That is 189.1 times the median for all construction & facilities work nationwide ($52.8k).
- Competed awards drew a median of 3 offers (reported for 53 of 53).
- 17% of competed awards drew only one offer.
- In FY2025 the middle award was $8.9M, down 32% from FY2024 ($13.2M).
FedComps Pro · coming soon · free waitlist
Get alerts for new heavy & civil work near you
Includes competitor tracking: follow Manson Construction Co and the other companies you bid against.
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 16 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 10 | $4,101,571 |
| FY2017 | 16 | $4,819,395 |
| FY2018 | 18 | $7,966,875 |
| FY2019 | 20 | $4,890,800 |
| FY2020 | 13 | $9,672,238 |
| FY2021 | 8 | $10,530,000 |
| FY2022 | 16 | $9,413,375 |
| FY2023 | 17 | $9,778,170 |
| FY2024 | 17 | $13,183,900 |
| FY2025 | 16 | $8,906,600 |
| FY2026 (provisional) | 8 | $13,990,850 |
Award sizes
- Holds the median award, $9,984,111
Recent awards won
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | |||
|---|---|---|---|---|
| Jul 13, 2026 | Oakland Inner and Outer Harbor FY26 Maintenance Dredging Project W912P726CA019 on USAspending (opens in a new tab) | $12,909,775 | 2 | Competed Open to all |
| Jul 13, 2026 | Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract Nos. 1-2026 W912P826CA027 on USAspending (opens in a new tab) | $13,322,000 | 4 | Competed Open to all |
| Apr 9, 2026 | Replace All Cathodic Protection at B7132, NSWC Car -Bangor N4425526F0053 on USAspending (opens in a new tab) | $745,000 | 3 | Order (multiple-award IDIQ) Open to all |
| Mar 23, 2026 | Project: West Coast Hopper Maintenance Dredging 2026 W9127N26CA015 on USAspending (opens in a new tab) | $25,973,750 | 2 | Competed Open to all |
| Mar 11, 2026 | Annual Maintenance Dredging of the Federal Navigation Channels with Oceanside Harbor. This Is the 1ST Cycle of a 4-YEAR Solicitation, with a Base Cycle (2026) and Option Cycles in 2026, 2027, and 2028. W912PL26CA004 on USAspending (opens in a new tab) | $6,140,000 | 1 | Competed Open to all |
| Jan 14, 2026 | Constructs a New 69KV Substation X and Upgrades Existing Facilities and Infrastructure to Increase Total Pier Lima Electrical Capacity. N6247326F0100 on USAspending (opens in a new tab) | $65,647,500 | 4 | Order (multiple-award IDIQ) Open to all |
| Dec 5, 2025 | The Work Includes Annual Maintenance Dredging of the Oakland Inner and Outer Harbor Channel to -50-FT (MLLW) Plus 1-FT of Paid Over-Depth and Transporting of the Dredged Material per the Requirements in Specification Section 00 10 00 W912P726CA006 on USAspending (opens in a new tab) | $23,143,411 | 2 | Competed Open to all |
| Oct 15, 2025 | Coastal Storm Risk Management Project Hutchinson Island St. Lucie County, Florida W912EP26CA001 on USAspending (opens in a new tab) | $14,659,700 | 3 | Competed Open to all |
| Sep 30, 2025 | Design-Bid-Build, Firm-Fixed-Price (FFP), Construction Contract for P021 and Small Craft Facility at Marine CORP Support Facility Blount Island Command, Jacksonville, Florida. N6945025C1079 on USAspending (opens in a new tab) | $61,080,000 | 2 | Competed Open to all |
| Sep 19, 2025 | Fort Pierce Beach Renourishment, St. Lucie County, Florida See Paragraph 1.2.1 of Specifications Section 01 11 00 for Additional Details. W912EP25CA010 on USAspending (opens in a new tab) | $15,006,510 | 2 | Competed Open to all |
| Aug 13, 2025 | The Contractor Shall Furnish the Equipment, Materials, Supplies, and Manpower Required to Perform Maintenance Dredging of Panama City Harbor. The Work to Be Performed Shall Be Iaw the Plans Schedule As Directed by the Panama City Site Office. W9127825FA099 on USAspending (opens in a new tab) Offers from IDIQ | $825,000 | 1 from the IDIQ | Order (single-award IDIQ) Open to all |
| Aug 6, 2025 | Task Order #2 - Berwick Bay Harbor W912P825F0102 on USAspending (opens in a new tab) Offers from IDIQ | $14,013,300 | 4 from the IDIQ | Order (single-award IDIQ) Open to all |
| Jul 23, 2025 | Dredging W912P825C0019 on USAspending (opens in a new tab) | $39,050,000 | 2 | Competed Open to all |
| Jul 2, 2025 | Minimum Guarantee W912P825F0096 on USAspending (opens in a new tab) Offers from IDIQ | $10,000 | 4 from the IDIQ | Order (single-award IDIQ) Open to all |
| Jun 26, 2025 | Southwest Pass - Dredging W912P825C0017 on USAspending (opens in a new tab) | $14,042,000 | 2 | Competed Open to all |
| May 5, 2025 | Remove and Replace Five 14 Inch Wood Pile and Install Five Anodes to the Five New Steel Pile. Remove and Replace All KB Docks Pier and Trestle Pile Bracing, Cross Bracing and Hardware. N4425525F0025 on USAspending (opens in a new tab) | $662,000 | 5 | Order (multiple-award IDIQ) Open to all |
| Mar 11, 2025 | FY25 West Coast Hopper Dredging W9127N25C0005 on USAspending (opens in a new tab) | $26,258,750 | 1 | Competed Open to all |
| Feb 10, 2025 | Dredging 1ST Cycle - All Areas, 1ST 300K W912PL25C0004 on USAspending (opens in a new tab) | $5,700,000 | 1 | Competed Open to all |
| Jan 22, 2025 | Savannah Entrance Harbor Hopper Dredging W912HN25C5002 on USAspending (opens in a new tab) | $6,080,000 | 2 | Competed Open to all |
| Jan 8, 2025 | Dredging the Pascagoula Harbor Channels, Pascagoula, Mississippi. W9127825F0071 on USAspending (opens in a new tab) Offers from IDIQ | $1,496,114 | 1 from the IDIQ | Order (single-award IDIQ) Open to all |
| Dec 4, 2024 | Construction of dredging facilities W912PL25C0003 on USAspending (opens in a new tab) | $18,815,000 | 1 | Competed Open to all |
| Nov 26, 2024 | Inner Harbor FY25 Maintenance Dredging W912P725C0003 on USAspending (opens in a new tab) | $11,733,200 | 2 | Competed Open to all |
| Nov 21, 2024 | Dredging Gulfport Harbor Channels W9127825F0030 on USAspending (opens in a new tab) Offers from IDIQ | $1,496,114 | 1 from the IDIQ | Order (single-award IDIQ) Open to all |
| Nov 13, 2024 | Maintenance Dredging, Hopper Dredge and Attendant Plant for Dredging in Alabama, Mississippi, and Florida W9127825F0021 on USAspending (opens in a new tab) Offers from IDIQ | $2,465,000 | 1 from the IDIQ | Order (single-award IDIQ) Open to all |
| Sep 29, 2024 | New Orleans to Venice, Non Federal Levee W912P824C0042 on USAspending (opens in a new tab) | $34,991,000 | 2 | Competed Open to all |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
How the work was bought
Competition
Was the work open to bids?
- Competed 42 (57%)
A standalone contract that was open to bids.
- Order (single-award IDIQ) 21 (28%)
A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.
- Order (multiple-award IDIQ) 11 (15%)
A task order placed under an IDIQ held by several companies, who competed for it.
Set-asides
Set-aside = reserved for a group of businesses.
- Open to all 74 (100%)
No set-aside: any size of business could bid.
Left out of the numbers above: 7 cancelled or $0 awards. Why?
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| N4425521D5004 | Multiple-award The IDIQ drew 9 offers | 5 | Feb 25, 2027 |
| W9127822D0066 | Single-award The IDIQ drew 2 offers | 4 | Sep 13, 2023 |
| W9127823D0065 | Single-award The IDIQ drew 3 offers | 4 | Jul 19, 2024 |
| W9127824D0067 | Single-award The IDIQ drew 1 offers | 4 | Oct 28, 2025 |
| N6247321D1406 | Multiple-award The IDIQ drew 15 offers | 3 | Jul 13, 2026 |
Contracts ending soon
Recurring work whose current contract ends within 18 months, so the agency will likely buy it again (a "recompete"). The company doing it today is the incumbent.
-
Contract ends Apr 30, 2027
2024 - 2026 Maintenance Dredging, Anchorage Harbor, Alaska
Incumbent: Manson Construction Co Buyer: USACE Alaska District Value at award: $13,183,900