Metro area
Federal construction & facilities contracts in the Fresno, CA area
Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Jul 13, 2026. Data status
Open bids here now
No open bids here right now. Updated weekly from SAM.gov · data through Oct 25. Save this search
Typical award (median)
$58,331
The middle of 168 priced awards, FY2021–FY2025. Half were between $22k and $282k.
Typical number of bids
3
Median bids per award, reported for 117 of 117 competed awards. 26% drew only one bid.
Won by small businesses
88%
Share of the 168 priced awards.
Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.
What this means
- The middle construction & facilities award in the Fresno, CA area was $58.3k (FY2021-FY2025, 168 priced awards).
- That is 14% lower than the median for all construction & facilities work in California ($68.2k).
- Competed awards drew a median of 3 offers (reported for 117 of 117).
- 26% of competed awards drew only one offer.
- In FY2025 the middle award was $63.1k, up 13% from FY2024 ($55.7k).
- Tip 65% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.
FedComps Pro · coming soon · free waitlist
Get alerts for new building construction work in the Fresno, CA area
- Alerts that say if a bid is worth it
- Deadline and amendment alerts
- Recompete radar
- Plain-English bid summaries
- Competitor tracking
- Unlimited saved searches
Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing
Awards per year
- FY2025, the latest full year: 32 awards
- FY2026 is still being reported
Show the numbers
| Year | Awards | Median award |
|---|---|---|
| FY2016 | 63 | $11,834 |
| FY2017 | 65 | $12,400 |
| FY2018 | 57 | $6,800 |
| FY2019 | 33 | $9,867 |
| FY2020 | 37 | $21,270 |
| FY2021 | 46 | $25,998 |
| FY2022 | 43 | $84,488 |
| FY2023 | 27 | $137,285 |
| FY2024 | 20 | $55,658 |
| FY2025 | 32 | $63,057 |
| FY2026 (provisional) | 31 | $94,451 |
Award sizes
- Holds the median award, $58,331
Recent awards
The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.
| Project | How it was awarded | ||||
|---|---|---|---|---|---|
| Sep 30, 2026 | Upgrade and Replace Obsolete Fire Detection Devices 1232SA26P0933 on USAspending (opens in a new tab) Provisional | Siemens Industry Inc | $102,687 | 1 | Competed Open to all |
| Sep 17, 2026 | Friant Dam HVAC Replacement 140R2026P0088 on USAspending (opens in a new tab) Provisional | Souza Construction, Inc. | $86,267 | 1 | Not competed Open to all |
| Sep 10, 2026 | EO 14398 Testing, Inspection, Maintenance and Repair of Automatic Fire Sprinkler System 36C26126F0383 on USAspending (opens in a new tab) Provisional | J&B Hartigan, Inc. | $159,210 | 1 | Order (multiple-award IDIQ) Veteran-owned |
| Sep 10, 2026 | Courthouse Emergency Generator Exhaust Project in Fresno, CA 47PD5426F0290 on USAspending (opens in a new tab) Provisional | Ocs Construction Services Inc | $1,741,683 | 14 | Order (multiple-award IDIQ) Small business |
| Sep 9, 2026 | Implementing EO 14398 DEI Discrimination Renovate and Expand Chilled Water Infrastructure 36C26126C0070 on USAspending (opens in a new tab) Provisional | G. L. Bruno Associates, Inc. | $24,342,644 | 4 | Competed Veteran-owned |
| Sep 3, 2026 | Renovate Imaging and Lab. 36C26126C0071 on USAspending (opens in a new tab) Provisional | G. L. Bruno Associates, Inc. | $10,612,677 | 6 | Competed Veteran-owned |
| Sep 1, 2026 | Boiler Safety Device Testing Services EO 14398 Incorporated into Contract Award 36C26126P1074 on USAspending (opens in a new tab) Provisional | Ce Solution Plus Corp. | $79,450 | 15 | Competed Small business |
| Aug 28, 2026 | Project No. 570-23-223, Renovate Building 1, First Floor for Acute Respiratory Clinic at Fresno VA Medical Center. EO 14398 36C26126C0067 on USAspending (opens in a new tab) Provisional | V. Lopez Jr. & Sons General Engineering Contractors, Inc | $2,404,795 | 7 | Competed Veteran-owned |
| Aug 27, 2026 | EO 14398 - Friant Dam Gate Compressor System Replacement 140R2026C0012 on USAspending (opens in a new tab) Provisional | Ams Industrial LLC | $2,986,251 | 3 | Competed Small business |
| Aug 24, 2026 | "EO 14398" 26Z6AT6_ Replace Hot Water Heaters at FCI Mendota, CA 15BBNF26C62000001 on USAspending (opens in a new tab) Provisional | Precision & Co Contractors LLC | $1,089,221 | 5 | Competed Small business |
| Aug 14, 2026 | EO 14398 - Columbia Operation & Maintenance Support Service 140R2026P0056 on USAspending (opens in a new tab) Provisional | Columbia Resource Conservation District | $505,269 | 1 | Competed Open to all |
| Aug 12, 2026 | HVAC Filters Unicor Aug 15B62026P00000082 on USAspending (opens in a new tab) Equipment purchase Provisional | Federal Prison Industries, Inc | $29,901 | 1 | Not competed Open to all |
| Aug 6, 2026 | 332393 - Grant Grove Replace Burned Structures (Design/Build) 140P2026F0194 on USAspending (opens in a new tab) Equipment purchase Provisional | J. I. Garcia Construction, Inc. | $3,691,632 | 1 | Order (multiple-award IDIQ) Small business |
| Aug 4, 2026 | HVAC Filter July FY26 15B62026P00000074 on USAspending (opens in a new tab) Equipment purchase Provisional | Federal Prison Industries, Inc | $17,601 | 1 | Not competed Open to all |
| Aug 3, 2026 | Repair Exterior Finishes Building 1 and OPC, at the Fresno VA Medical Center, Project Number: 570-21-108 36C26126C0058 on USAspending (opens in a new tab) Provisional | Strategic Industry Inc | $7,984,201 | 1 | Competed Veteran-owned |
| Jul 31, 2026 | Fire Alarm Install, Test and Commissioning 36C26126P0970 on USAspending (opens in a new tab) Provisional | Johnson Controls Fire Protection LP | $24,900 | 1 | Not competed Open to all |
| Jul 27, 2026 | Boiler Inspection Services 15B62026F00000046 on USAspending (opens in a new tab) Provisional Offers from IDIQ | Insparisk, LLC | $930 | 3 from the IDIQ | Order (single-award IDIQ) Small business |
| Jul 23, 2026 | Replacement of Ceiling Kitchen Area Tile, Building 1, Basement Nutrition Food Service, Project: 570-26-228 for the Fresno VA Medical Center. 36C26126C0062 on USAspending (opens in a new tab) Provisional | G. L. Bruno Associates, Inc. | $224,501 | 3 | Competed Veteran-owned |
| Jul 20, 2026 | IIJA Funds. 2025 Propane Baseline Installation per Attached SOW, Approved Design Drawings at Fresno, CA ATCT: 1501845 6973GH26F01098 on USAspending (opens in a new tab) Provisional | Urban Electric, Inc | $125,091 | 8 | Order (multiple-award IDIQ) Open to all |
| Jul 14, 2026 | The Scope of Work for This Requirement Involves Designing, Furnishing, Installing, and Commissioning an Operational Vehicle Exhaust Source Capture System. W50S6T26CA011 on USAspending (opens in a new tab) Provisional | Lejas Corporation | $97,890 | 14 | Competed Small business |
| Jul 13, 2026 | Construction- Repair and Parking Structure Elevator EO 14398 36C26126C0045 on USAspending (opens in a new tab) | Strategic Industry Inc | $1,659,309 | 4 | Competed Veteran-owned |
| Jul 9, 2026 | The Oklahoma Army National Guard Has a Requirement for 43 Portable Latrine and 5 Hand-Washing Stations, with 24-HOUR Access and 3 Days of Cleaning Support Located at Camp W912L626PA004 on USAspending (opens in a new tab) | Essayons Veteran Services LLC | $10,265 | 5 | Competed Small business |
| Jul 1, 2026 | 06-1824 Repair Main Gas Valve B100 W50S6T26PA017 on USAspending (opens in a new tab) | Baron Contracting | $23,961 | 8 | Competed Small business |
| Jun 4, 2026 | EO 14398 HVAC Filters Unicor May 2026 15B62026P00000057 on USAspending (opens in a new tab) Equipment purchase | Federal Prison Industries, Inc | $29,901 | 1 | Not competed Open to all |
| May 15, 2026 | Boiler Replacements 1232SA26P0292 on USAspending (opens in a new tab) | Agile Construction, Inc. | $61,169 | 20 | Competed Small business |
Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders.
Who won
Companies with the most priced awards here, FY2021–FY2025.
| # | Company | Awards | Total value at award |
|---|---|---|---|
| 1 | Pundir Group, Inc | 19 | $1,051,731 |
| 2 | Brooks Range Contract Services, Inc. | 11 | $532,270 |
| 3 | Johnson Controls, Inc | 7 | $174,615 |
| 4 | J. I. Garcia Construction, Inc. | 4 | $30,105,323 |
| 5 | G. L. Bruno Associates, Inc. | 4 | $24,148,369 |
| 6 | Sergents Mechanical Systems Inc | 4 | $12,284,530 |
| 7 | Hamhed LLC | 4 | $1,009,948 |
| 8 | Strategic Industry Inc | 3 | $9,626,273 |
| 9 | Alltech Engineering Corp | 3 | $3,639,600 |
| 10 | Constructicon Corp | 3 | $971,155 |
How the work was bought
Competition
Was the work open to bids?
- Competed 73 (43%)
A standalone contract that was open to bids.
- Order (multiple-award IDIQ) 44 (26%)
A task order placed under an IDIQ held by several companies, who competed for it.
- Not competed 37 (22%)
Sole-source: only one company was asked.
- Order (single-award IDIQ) 14 (8%)
A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.
Set-asides
Set-aside = reserved for a group of businesses.
- Small business 63 (38%)
Only small businesses could bid.
- Open to all 58 (35%)
No set-aside: any size of business could bid.
- 8(a) 29 (17%)
Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.
- Veteran-owned 15 (9%)
Reserved for service-disabled veteran-owned (SDVOSB) or veteran-owned (VOSB) small businesses.
- Woman-owned 3 (2%)
Reserved for woman-owned small businesses (WOSB/EDWOSB).
Left out of the numbers above: 7 equipment purchases, 4 cancelled or $0 awards. Why?
Contracting offices buying here
- VA Network Contracting Office 21
- GSA PBS Region 9 Central CA Field Office
- USDA ARS PWA AAO Acquisition/Personal Property
- California Air National Guard 144th Wing (USPFO)
- Workforce Development-APDP
- USACE Sacramento District
- USDA Forest Service CSA Southwest 6
- GSA PBS Region 9 AMD SAT San Francisco Support Section
- USDA Forest Service-SPOC SW
- MP-Regional Office
Umbrella contracts used here
Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.
| Contract | Type | Orders | Ordering ends |
|---|---|---|---|
| 47PK0220D0004 | Single-award The IDIQ drew 5 offers | 11 | Jan 31, 2023 |
| GS06F0013R | Multiple-award | 11 | Nov 4, 2024 |
| GS06F0060P | Multiple-award | 5 | Jul 13, 2024 |
| GS21F0185X | Multiple-award | 4 | Sep 28, 2031 |
| 47PK0121D0020 | Multiple-award The IDIQ drew 34 offers | 3 | Feb 15, 2027 |
Contracts ending soon
Recurring work whose current contract ends within 18 months, so the agency will likely buy it again (a "recompete"). The company doing it today is the incumbent.
-
Ordering period ends Oct 31, 2026
PSG IDIQ Contract for Site Survey, Design and Installation
Incumbent: C.N.S. Communications, LLC Buyer: Franchise Acquisition Services
6973GH22D00009 on USAspending (opens in a new tab) -
Ordering period ends Oct 31, 2026
PSG IDIQ Contract for Site Survey, Design and Installation
Incumbent: Sentinel Power Services, LLC Buyer: Franchise Acquisition Services
6973GH22D00015 on USAspending (opens in a new tab) -
Ordering period ends Oct 31, 2026
PSG IDIQ Contract for Site Survey, Design and Installation
Incumbent: Urban Electric, Inc Buyer: Franchise Acquisition Services
6973GH22D00016 on USAspending (opens in a new tab)
7 more contracts end in the next 18 months. The full recompete radar is part of FedComps Pro (coming soon).
Join the free waitlistTrades in this area
Other metro areas
Report an error on this page
Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.