Agency or command

National Aeronautics and Space Administration (NASA): construction & facilities contracts

Numbers cover FY2021–FY2025 (Oct 2020 – Sep 2025). Data as of Oct 21, 2026; complete through Sep 21, 2026. Data status

Typical award (median)

$69,930

The middle of 1,130 priced awards, FY2021–FY2025. Half were between $20.1k and $345k.

Typical number of bids

3

Median bids per award, reported for 739 of 739 competed awards. 11% drew only one bid.

Won by small businesses

90%

Share of the 1,130 priced awards.

Median = the middle award: half were smaller, half were larger. Bids = how many offers the agency received.

What this means

  • The middle construction & facilities award from NASA was $69.9k (FY2021-FY2025, 1,130 priced awards).
  • That is 32% higher than the median for all construction & facilities work nationwide ($52.8k).
  • Competed awards drew a median of 3 offers (reported for 739 of 739).
  • 11% of competed awards drew only one offer.
  • In FY2025 the middle award was $135k, up 54% from FY2024 ($87.6k).
  • Tip 63% of these awards were task orders under multiple-award contracts (MATOCs). To compete for those, you first need a spot on one of the umbrella contracts.
  • Tip 83% of awards with a reported set-aside were reserved for small businesses, so small firms were not bidding against large companies.

FedComps Pro · coming soon · free waitlist

Get alerts for new building construction work near you

  • Alerts that say if a bid is worth it
  • Deadline and amendment alerts
  • Recompete radar
  • Plain-English bid summaries
  • Competitor tracking
  • Unlimited saved searches

Planned price: $15/month or $119/year (save 34%), with a 14-day free trial. No card needed to start. Cancel anytime. See pricing

Your sign-up did not go through. Please check your email and ZIP code and try again. The spam check needs JavaScript turned on.

Add your company (optional)

We only email you about the launch. Delete your details any time.

Awards per year

Column chart of awards per fiscal year, FY2016 to FY2026. FY2025, the latest full year: 174 awards. Most in one year: 299 awards in FY2022. FY2026 is still being reported. 0 100 200 300 2016 ’16 2017 ’17 2018 ’18 2019 ’19 2020 ’20 2021 ’21 2022 ’22 2023 ’23 2024 ’24 174 2025 ’25 2026 ’26
  • FY2025, the latest full year: 174 awards
  • FY2026 is still being reported
Federal fiscal years run October to September.
Show the numbers
YearAwardsMedian award
FY2016 295 $28,658
FY2017 249 $21,335
FY2018 287 $24,950
FY2019 256 $22,449
FY2020 219 $35,425
FY2021 244 $43,216
FY2022 299 $71,119
FY2023 219 $72,580
FY2024 194 $87,647
FY2025 174 $134,559
FY2026 (provisional) 196 $205,250

Award sizes

Bar chart of priced awards FY2021–FY2025 by size. The most common size was $25k to $250k (480 awards). The median award, $69,930, is in the $25k to $250k band. Under $25k 320 $25k to $250k 480 $250k to $1M 201 $1M to $5M 94 $5M to $25M 30 Over $25M 5
  • Holds the median award, $69,930
Priced awards FY2021–FY2025, by value at award.

Recent awards

The latest 25 awards, newest first. Each contract number opens its official record on USAspending.gov.

Project How it was awarded
Oct 14, 2026 Aircraft Weather Coverings 80AFRC27FA002 on USAspending (opens in a new tab) Provisional Value after changes Ocs Construction Services Inc $2,123,363 after changes 14 Order (multiple-award IDIQ) Small business
Sep 29, 2026 Upgrade Domestic Water System, Phase 1 80GSFC26F7042 on USAspending (opens in a new tab) Provisional Pinnacle Construction Development Group, Inc. $6,546,352 3 Order (multiple-award IDIQ) Small business
Sep 29, 2026 Wallops Multiple Award Construction II Task Order for Building 05 Roof Restoration. 80GSFC26FA014 on USAspending (opens in a new tab) Provisional Teya Enterprises LLC $845,439 5 Order (multiple-award IDIQ) 8(a)
Sep 29, 2026 Wallops Multiple Award Construction II Task Order Building 28 Roof Antenna Replacement. 80GSFC26FA016 on USAspending (opens in a new tab) Provisional Teya Enterprises LLC $474,502 4 Order (multiple-award IDIQ) 8(a)
Sep 29, 2026 The Principal Purpose of This Requirement Is to Perform a Roof Replacement of Building 07 Located at NASA Goddard Space Flight Center 80GSFC26FA018 on USAspending (opens in a new tab) Provisional New Dominion Construction LLC $1,004,511 6 Order (multiple-award IDIQ) 8(a)
Sep 29, 2026 Electrical Blanket Purchase Agreement Call to Install Lightning Protection, Grounding, and 208V Power to Doppler Radar Wind Area at Kennedy Space Center (KSC) 80KSC026FA065 on USAspending (opens in a new tab) Provisional 8-Koi Inc $136,888 4 Order (multiple-award IDIQ) Open to all
Sep 28, 2026 Roofing Revitalization at AFRC 80AFRC26FA093 on USAspending (opens in a new tab) Provisional Patricia I. Romero, Inc. $9,243,665 7 Order (multiple-award IDIQ) Small business
Sep 28, 2026 Provide Integrated Institutional Facilities Operations and Maintenance Support Services for NASA Ames Research Center. 80ARC026F0034 on USAspending (opens in a new tab) Provisional Offers from IDIQ Chugach Intelligence Solutions, LLC $1,610,548 6 from the IDIQ Order (single-award IDIQ) Small business
Sep 28, 2026 Provide Integrated Institutional Facilities Operations and Maintenance Support Services for NASA Ames Research Center. 80ARC026F0037 on USAspending (opens in a new tab) Provisional Offers from IDIQ Chugach Intelligence Solutions, LLC $307,251 6 from the IDIQ Order (single-award IDIQ) Small business
Sep 28, 2026 This Requirement Is to Build and Install a New Wall to Structurally Support a Video Wall Within Building N201. 80ARC026F0040 on USAspending (opens in a new tab) Provisional Capital Brand Group LLC $107,552 2 Order (multiple-award IDIQ) Small business
Sep 25, 2026 Building Automation System (BAS) - Replacement of Legacy Siemens Building Controllers & Pneumatic Conversion to DDC 80ARC026FA046 on USAspending (opens in a new tab) Provisional MX Construction, Inc. $1,021,324 11 Order (multiple-award IDIQ) Small business
Sep 25, 2026 N240 HVAC System Upgrades 80ARC026FA047 on USAspending (opens in a new tab) Provisional Patricia I. Romero, Inc. $3,507,716 14 Order (multiple-award IDIQ) Small business
Sep 25, 2026 Restore Reliability of Domestic Water 80ARC026FA048 on USAspending (opens in a new tab) Provisional Ironwood Commercial Builders Inc $7,695,551 7 Order (multiple-award IDIQ) Small business
Sep 25, 2026 Restore Reliability of Natural Gas 80ARC026FA049 on USAspending (opens in a new tab) Provisional Sea Pac Engineering Inc $9,348,000 3 Order (multiple-award IDIQ) Small business
Sep 24, 2026 4872 Load Banks Replacement, Testing, Startup, and System Verification 80AFRC26FA092 on USAspending (opens in a new tab) Provisional G1-Lead Builders JV LLC $644,463 5 Order (multiple-award IDIQ) Small business
Sep 24, 2026 Small Task Order Construction Contract II - Facility MODS to Buildings, Fuel Storage Area 1 (FSA#1) at Kennedy Space Center, FL 80KSC026F0025 on USAspending (opens in a new tab) Provisional Aleut Construction LLC $895,363 3 Order (multiple-award IDIQ) Small business
Sep 24, 2026 II Task Order Award: Repair Elevators 5 & 6. 80KSC026F0026 on USAspending (opens in a new tab) Provisional Aiko Enterprises, Inc $3,965,244 5 Order (multiple-award IDIQ) Small business
Sep 24, 2026 II Task Order Award: High Bay Refurbishment 80KSC026F0027 on USAspending (opens in a new tab) Provisional Aiko Enterprises, Inc $1,643,969 5 Order (multiple-award IDIQ) Small business
Sep 24, 2026 This Task Order Is Created for Funding of Core Services for Cost Price Incentive Fee Clin 2004 of 80SSC025D0001 80MSFC26F0070 on USAspending (opens in a new tab) Provisional Unusually large Offers from IDIQ Nova Space Solutions, LLC $16,316,544 3 from the IDIQ Order (single-award IDIQ) Open to all
Sep 24, 2026 Stipend for Proposal Preparation Including Participation in Design Concept Meetings Supporting a Design Build Competition. 80MSFC26P0010 on USAspending (opens in a new tab) Provisional Diversified Construction of Oklahoma, Inc. $75,000 2 Competed Open to all
Sep 23, 2026 Building N258 Mobile Chiller Installation - This Requirement Is for the Installation of a New Air-Cooled Chiller to Support the Building's Cooling Requirements. 80ARC026F0035 on USAspending (opens in a new tab) Provisional Capital Brand Group LLC $549,047 2 Order (multiple-award IDIQ) Small business
Sep 23, 2026 II Task Order Award: Roof Replacement, Hangar Ae 80KSC026F0024 on USAspending (opens in a new tab) Provisional Aiko Enterprises, Inc $2,987,777 4 Order (multiple-award IDIQ) Small business
Sep 22, 2026 II Task Order Award: HVAC Modifications, CD&SC 80KSC026F0023 on USAspending (opens in a new tab) Provisional Aleut Construction LLC $3,448,281 6 Order (multiple-award IDIQ) Small business
Sep 21, 2026 Center Maintenance, Operation and Engineering II II Support Services. 80LARC26FA019 on USAspending (opens in a new tab) Offers from IDIQ Amentum Technology, Inc. $900,000 2 from the IDIQ Order (single-award IDIQ) Open to all
Sep 21, 2026 Center Maintenance, Operation and Engineering II II Support Services. 80LARC26FA025 on USAspending (opens in a new tab) Unusually large Offers from IDIQ Amentum Technology, Inc. $12,600,000 2 from the IDIQ Order (single-award IDIQ) Open to all

Value at award = the contract value when it was signed. Bids = offers received; "–" means not reported. Set-aside = reserved for a group, such as small or veteran-owned businesses. IDIQ = an umbrella contract; work under it is placed as task orders. After changes = the original award value was not reported, so the value shown includes later changes; such awards are left out of price statistics.

Who won

Companies with the most priced awards here, FY2021–FY2025.

#CompanyAwardsTotal value at award
1 Wolf Creek Federal Services LLC 98 $3,894,284
2 Erie Affiliates Inc 55 $53,438,713
3 Dison Group LLC 51 $8,418,064
4 Vec Valley Electric, Inc. 47 $5,260,613
5 Tennessee Valley Services Inc 46 $8,450,122
6 Apache Electrical Contractors Inc 45 $5,004,744
7 Native Resource Development Co Inc 40 $21,061,552
8 Wright Bros LLC 39 $30,024,569
9 Bastion Technologies, Inc. 36 $6,495,640
10 Aleut Construction LLC 34 $15,609,139

How the work was bought

Competition

Was the work open to bids?

  • Order (multiple-award IDIQ) 711 (63%)

    A task order placed under an IDIQ held by several companies, who competed for it.

  • Order (single-award IDIQ) 348 (31%)

    A task order under an IDIQ held by one company. No new competition, so it is left out of bid statistics.

  • Not competed 43 (4%)

    Sole-source: only one company was asked.

  • Competed 28 (2%)

    A standalone contract that was open to bids.

Set-asides

Set-aside = reserved for a group of businesses.

  • Small business 674 (60%)

    Only small businesses could bid.

  • 8(a) 216 (19%)

    Reserved for firms in SBA's 8(a) program for disadvantaged small businesses.

  • Open to all 189 (17%)

    No set-aside: any size of business could bid.

  • Not reported 42 (4%)

    The agency did not report a set-aside.

  • Woman-owned 6 (1%)

    Reserved for woman-owned small businesses (WOSB/EDWOSB).

  • HUBZone 2 (<1%)

    Reserved for small businesses in a Historically Underutilized Business Zone.

  • Veteran-owned 1 (<1%)

    Reserved for service-disabled veteran-owned (SDVOSB) or veteran-owned (VOSB) small businesses.

Left out of the numbers above: 13 equipment purchases, 9 cancelled or $0 awards. Why?

Umbrella contracts used here

Many jobs are placed as task orders under an IDIQ: an umbrella contract with no fixed amount. Only the companies holding it can get those orders. A "multiple-award" IDIQ is shared by several companies, who compete for each order. "–" = not reported.

Contract Type Orders Ordering ends
NNC14BA11B Single-award The IDIQ drew 8 offers 98 Sep 30, 2023
80GRC020D0009 Multiple-award The IDIQ drew 26 offers 54 Mar 31, 2027
80MSFC19D0006 Multiple-award The IDIQ drew 24 offers 42 May 31, 2026
80MSFC19D0017 Multiple-award The IDIQ drew 24 offers 41 Sep 30, 2026
80JSC022AA023 Single-award The IDIQ drew 4 offers 40 Feb 28, 2027

Contracts ending soon

Recurring work whose current contract ends within 18 months, so the agency will likely buy it again (a "recompete"). The company doing it today is the incumbent.

15 more contracts end in the next 18 months. The full recompete radar is part of FedComps Pro (coming soon).

Join the free waitlist
Report an error on this page

Wrong number, award at the wrong base, or a name that should not be here? Tell us. We check every report and fix the rule behind it.